Few phrases in a building contract cause more confusion than fixtures and fittings. Most owners assume the two words describe the same thing, and that anything shown in a display home or drawn on a plan will arrive in the finished house. Neither assumption holds, and the gap between them is one of the most common sources of friction at handover.
The distinction matters because it decides who pays. A fixture is normally part of what the builder supplies or what passes with the property on sale. A fitting sits in a grey zone that depends entirely on what the contract says. A free-standing item is usually your problem to source, deliver and install, even if you saw one in the display home and assumed it came with the package.
This guide sets out the practical distinction in plain terms, works through concrete examples of where common household items fall, explains where disputes usually start, and gives you a way to remove ambiguity before you sign rather than arguing about it at practical completion.
It is a definitional guide rather than a contract review guide. If you want the wider picture of how a residential build fits together, refer to the BUILTLY complete guide to building a house in Australia.
What fixtures and fittings actually mean
In Australian property and construction practice, the words describe how firmly an item is joined to the building and what that attachment implies about ownership.
A fixture is an item that has been attached to the land or building in a way that suggests it is meant to stay there. A wall oven set into joinery, a fixed shower screen, a built-in wardrobe, a hard-wired ceiling fan, a fixed vanity, a driveway, a clothesline concreted into the ground. Removing it would either damage the building or leave an obvious hole in the finished work. Fixtures are generally treated as part of the property.
A fitting is attached, but attached lightly, and can normally be taken away without damage. Curtains on a track, a free-standing dishwasher slotted under a bench, a wall-mounted television bracket, a mirror hung on hooks, a plug-in pendant light. The attachment is for convenience rather than permanence, and that is why a fitting is ambiguous unless the contract names it.
A chattel is a free-standing item that simply sits in the house. Furniture, a portable heater, a fridge, pot plants, a barbecue on wheels. Chattels are excluded unless the contract expressly includes them.
The same three categories apply whether you are buying an existing home or building a new one. In a purchase, they decide what the seller may take with them. In a build, they decide whether the builder supplies the item or whether you source and pay for it separately.
Fixtures vs fittings vs chattels: the real difference
Australian courts have long used a test known as the degree of annexation, supported by a second test called the purpose of annexation. The language sounds technical, but the reasoning is ordinary common sense and you can apply it yourself in about ten seconds.
Degree of annexation: how firmly is it attached?
Ask a simple question. Is the item held in place by its own weight, or is it fixed by screws, bolts, plumbing, wiring, adhesive, mortar or concrete? An item resting on the floor is presumed to be a chattel. An item cut into the cabinetry, plumbed into the waste or hard-wired into a circuit leans strongly towards being a fixture.
The second half of the question is what happens if you take it out. If removing it damages the wall, the joinery, the tiling or the waterproofing, or leaves the house incomplete, it is almost certainly a fixture. If it comes off cleanly and the room still functions, it is more likely a fitting.
Purpose of annexation: why was it attached?
The second test asks whether the item was attached to improve the property permanently, or merely to make the item itself usable or secure. A heavy artwork bolted to a wall so it does not fall is bolted for the sake of the artwork, not the wall, so it stays a chattel. A splashback glued to the wall exists to complete the kitchen, so it is a fixture. Where the two tests point in different directions, purpose usually wins.
Common household items sorted
These are the items that generate the most arguments, sorted by how they are normally treated in Australia. Treat this as a starting point, not a rule, because a written schedule always overrides the default position.
Usually fixtures, generally included
- Hard-wired light fittings, downlights and ceiling fans
- Wall ovens, cooktops and rangehoods built into joinery
- Built-in wardrobes, pantries and fixed shelving
- Fixed vanities, basins, toilets, baths and shower screens
- Ducted heating and cooling, and split system head units mounted to the wall
- Fixed floor coverings including tiles, timber flooring and glued vinyl
- Driveways, fencing, letterboxes set in concrete and fixed clotheslines
Ambiguous fittings, list them or lose them
- Curtains, curtain rods and roller blinds
- Free-standing dishwashers slotted under a bench
- Television wall brackets, and the television itself
- Mirrors, towel rails and toilet roll holders that screw into plasterboard
- Security cameras, doorbells and smart home hubs
- Rainwater tanks, garden sheds and pergolas that are not fixed to a slab
Usually chattels, generally excluded
- Fridges, washing machines and clothes dryers that are not built in
- Free-standing furniture, rugs and portable heaters
- Plug-in lamps and pendant lights hung from a hook
- Barbecues, outdoor settings and potted plants
Notice how many everyday items sit in the middle column. That middle column is where nearly every dispute lives, and it is the column a written schedule exists to eliminate.
Why this causes disputes
Three scenarios account for most of the arguments, and each has the same root cause: one party assumed, and nobody wrote it down.
A departing owner removes something the buyer assumed was included
A buyer inspects a home with plantation shutters, a rainwater tank and a wall-mounted television, and settles expecting all three. The seller reads the same items as theirs to take. Because the contract of sale listed only the standard boilerplate inclusions, the buyer arrives to bare windows, holes in the plasterboard and a capped water line. The remedy is available but slow and expensive relative to the value of the items, which is exactly why most buyers absorb the loss.
The build contract is unclear about supply versus owner-supplied
BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
Display home inclusions do not match the contract
Display homes are built to sell. They routinely carry upgraded tapware, feature lighting, stone benchtops, landscaping, window furnishings and additional joinery that are not part of the base package. Signage in the display usually notes this in small print. Unless the specific upgrade appears in your own inclusions schedule, it is not in your build, no matter how clearly you remember it.
The pattern across all three is the same. Ambiguity is resolved in favour of whoever holds the written document, and the party with the written document is almost never the homeowner.
What should be specified in your building contract
Fixtures and fittings are usually described across four documents rather than one, and they only make sense read together: the contract itself, the specification, the inclusions schedule, and the plans. If an item is not named in any of them, assume it is not supplied.
The inclusions schedule
This is the document that matters most for fixtures and fittings. A good inclusions schedule names the product, the model or range, the finish, the quantity and the location. A weak one lists categories such as quality tapware throughout, which commits the builder to nothing in particular. Anywhere the schedule describes a category rather than a product, treat it as an open question and ask for it to be resolved in writing.
Prime cost items
A prime cost item is an allowance for goods that have not yet been selected, such as tapware, appliances, tiles or light fittings. The item is known, the exact product is not, so the contract carries a dollar figure. If your selection costs more, the difference is added; if less, it is credited. Most fixtures and fittings disputes in new builds trace back to allowances set too low at signing. For the detail, refer to the BUILTLY guide on prime cost items in building contracts in Australia.
Provisional sums
A provisional sum is an estimate for work where the scope is not yet settled, such as landscaping, retaining or connecting services. It covers labour and materials rather than a single product. Where a fitting requires installation work that has not been scoped, the cost often sits here instead. The BUILTLY guide on provisional sums in building contracts in Australia sets out how these are adjusted and what to check before signing.
Owner-supplied items
If you intend to supply an item yourself, the contract should say so, name the item, state when it must be on site and record who carries the risk for damage, delay and warranty. Owner-supplied appliances that arrive late are a common and entirely avoidable cause of delay claims.
BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
How to avoid ambiguity
Everything below is done before you sign. Once the contract is executed, changing an inclusion becomes a variation, and variations are priced without competition.
Insist on a written schedule, room by room
Ask for the inclusions schedule to be organised by room rather than by trade, and read it as though you were walking through the finished house. Kitchen, then each bathroom, then laundry, then each bedroom, then the exterior. Anything you picture in the room that does not appear on the page is an item you will be buying yourself.
Photograph the display home if it is your reference point
If the display home is what sold you on the design, record it properly. Photograph each room, the tapware, the lighting, the joinery handles and the flooring, and note the date. Then compare those photographs line by line against the inclusions schedule and ask the consultant in writing to confirm which items are upgrades. An email answer is evidence; a verbal reassurance during a walkthrough is not.
Name products, not categories
Wherever practical, replace category descriptions with a brand, range, model and finish. Where the product genuinely cannot be chosen yet, make sure the allowance reflects a realistic price for the standard you actually want, priced from a supplier rather than accepted from the builder.
Resolve every borderline item in writing before signing
Work through the ambiguous list from earlier in this guide and confirm each one: blinds, dishwasher, television bracket, mirrors, towel rails, letterbox, clothesline, rainwater tank, garden shed. Ten minutes of questions before signing removes the entire category of dispute later.
Red flag: a builder or sales consultant who answers a written question about an inclusion verbally, or who says it is standard and does not need listing. If it is genuinely standard, adding it to the schedule costs them nothing.
What to check before handover
The practical completion inspection is your last practical opportunity to raise a missing or substituted item while the builder still holds the final payment. Take the inclusions schedule with you and treat it as the checklist.
- Every named product is present, in the named finish, in the named location
- Appliance model numbers match the schedule, not just the appliance type
- Tapware, door hardware and light fittings match the selections you signed off
- Prime cost and provisional sum items have been reconciled and the adjustments explained in writing
- Owner-supplied items have been installed correctly and any damage is recorded now
- Manuals, warranty cards and serial numbers for every appliance and fixture have been handed over
- Anything substituted has an approved variation behind it, signed by both parties
Record each discrepancy on the defects list with a photograph, the date and the schedule reference. A substitution raised at inspection is a straightforward correction. The same substitution raised three months after final payment is a negotiation.
For how the inspection itself runs and what else belongs on the list, refer to the BUILTLY guide on the practical completion inspection in Australia.
BUILTLY and lasting project records
A fixtures and fittings schedule is one of the most useful documents a house ever produces, and one of the first to disappear. It records what was supplied, at what grade, by which builder, and on what date.
BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
Frequently asked questions
What is the difference between a fixture and a fitting in Australia?
A fixture is an item that has been attached to the property in a way that suggests it is intended to stay there permanently, such as a wall oven, a built-in wardrobe or a fixed vanity. A fitting is an item that is attached but is intended to be removable without damage, such as a free-standing dishwasher, curtains on a track or a wall-mounted television bracket. Fixtures generally pass with the property or form part of the build. Fittings are ambiguous by default and should be listed in writing if you expect them to be included.
Are light fittings included when you buy or build a house?
Hard-wired light fittings, including downlights and ceiling-mounted fittings, are usually treated as fixtures and are included. Pendant lights on a plug or a hook, floor lamps and free-standing lamps are usually treated as chattels and are not included unless the contract says so. In a new build, the number, type and grade of light fittings supplied by the builder is often set as a prime cost allowance, so upgrading to a different fitting changes the contract price.
Does a building contract have to list every fixture and fitting?
There is no rule requiring an itemised list, but every state residential building contract must describe the works with enough detail for the owner to know what is being built. In practice that detail sits in the specification, the inclusions schedule, the plans and the prime cost and provisional sum schedules. If an item is not named in one of those documents, the safe assumption is that it is not included.
What happens if a builder supplies a lower grade fitting than expected?
If the contract names a specific product, the builder must supply that product or an agreed equivalent, and any change should be documented as a variation. If the contract only carries an allowance, the builder has met the contract by supplying an item within that allowance, and anything better is at your cost. That is the practical reason to read the prime cost and provisional sum schedules closely before signing.
Can a seller remove fixtures before settlement?
A seller should not remove anything that is a fixture, and removing one after exchange is generally a breach of contract. Disputes usually arise over borderline items such as blinds, wall-mounted heaters, rainwater tanks and television brackets. The reliable protection is to list the inclusions and exclusions in the contract of sale rather than relying on what was present at the inspection.
Should the fixtures and fittings schedule be kept after handover?
Yes. The schedule records what was actually supplied, at what grade, and by whom. It is the reference point for warranty claims, insurance valuations, later defect claims and resale enquiries. Most owners lose it within a few years, which is why it belongs in a permanent project record rather than an email attachment.