Verification

How to check a builder's licence in Tasmania.

Last updated: October 2026 ·

Tasmania's building landscape demands a level of verification rigour that the smaller market sometimes obscures. Heritage stock concentrated in Hobart and Launceston, BAL-rated bushfire zones across much of the south, salt-driven coastal exposure on every coast and Bass Strait freight that pushes material costs above the mainland baseline all combine to raise the cost of engaging the wrong builder. Verifying a builder's registration through Consumer, Building and Occupational Services (CBOS) is the foundational step before any contract is signed.

Official Tasmanian builder register

Search the TBPC builder register

The Tasmanian Building and Plumbing Commission (TBPC) regulates building practitioners in Tasmania. The official register is administered through Consumer, Building and Occupational Services (CBOS). Search by name, business name or registration number.

Open TBPC Register
Or join the waitlist

Verified Tasmanian builders coming soon

Be notified when verified builder profiles launch in Tasmania. Real projects, full project teams.

Join Waitlist

Why verifying a builder's licence in Tasmania matters

Tasmania presents a set of construction conditions that magnify the cost of engaging an unlicensed or inappropriately licensed builder. Bushfire-prone areas across the south and east require BAL-rated detailing assessed under BAL ratings and bushfire construction requirements. Coastal sites from the Tasman Peninsula to King Island sit in marine atmospheric corrosion zones, with salt exposure attacking fixings, cladding and reinforcement in ways that only a builder with local experience reads correctly. Heritage stock in Hobart, Launceston and Battery Point brings overlay controls that constrain materials, openings and form, often requiring specialist trades that the smaller Tasmanian market supplies in limited numbers.

Bass Strait freight pricing also changes the build economics. Materials that move freely on the mainland arrive in Tasmania with a freight loading that affects everything from steel framing to specified joinery and stone. A builder who does not understand these inputs, or who relies on mainland subcontractors without a local network, can quietly erode budgets through avoidable freight and remobilisation costs.

The consumer protection consequences of unlicensed work are severe. Without a current CBOS licence, the builder is operating outside the regulatory framework set by the Building Act 2016 (Tas). Building permits cannot be lawfully issued for work performed by an unlicensed builder, council enforcement powers can require demolition or rectification at the owner's cost, and Home Warranty Insurance is unavailable. Recovery options narrow to general contract law, with limited prospects where the builder is uninsured or insolvent.

The Tasmanian builder market is also smaller than the mainland equivalents. Fewer comparison options means each shortlisted builder carries more weight in the decision, and verification rigour matters more, not less. Confirming registration through CBOS is fast, free and protects against the most common downstream failures: unlicensed work, inappropriate licence categories, lapsed registration and undisclosed disciplinary history. Where the engagement is for a high-value or complex project, layering this check with the wider due-diligence process described in how to choose a builder in Hobart and the BUILTLY guide on building a coastal home in Australia is the responsible default.

Who regulates building practitioners in Tasmania

Building practitioner regulation in Tasmania sits with Consumer, Building and Occupational Services (CBOS), a division of the Tasmanian Department of Justice. CBOS administers the Building Practitioner Register, issues registration, investigates complaints, conducts audits and enforces the regulatory framework set by the Building Act 2016 (Tas) and the subordinate Building Regulations 2016 (Tas). The Director of Building Control, established under the Act, has statutory powers including the issue of Director's Determinations that prescribe technical, procedural and licensing requirements.

The Building Act 2016 (Tas) replaced earlier Tasmanian building legislation and modernised the framework for building work, accreditation of practitioners and consumer protection. Under this Act, a person who carries out building work for which licensing is required must hold the appropriate category and class of licence. CBOS issues, renews, suspends and cancels licences under the powers granted by the Act, and Director's Determinations such as the Occupational Licensing (Building Services Work) Determination 2021 prescribe the eligibility, qualifications and experience required for each licence class.

Residential building contracts and disputes are governed by a related statute, the Residential Building Work Contracts and Disputes Resolution Act 2016 (Tas), which sets the requirements for contract content, deposits, progress payments and the early dispute resolution process. The two Acts operate together: the Building Act 2016 governs the regulatory standing of the builder, and the Contracts Act governs the commercial and consumer-protection elements of the engagement.

The official CBOS website is cbos.tas.gov.au, where the public Building Practitioner Register, fact sheets, fee schedules, complaint forms and Director's Determinations are published. CBOS also maintains physical offices in Hobart and Launceston, supported by Service Tasmania shops across the state for in-person identity verification, photography for licence cards and form lodgement.

It is important to distinguish CBOS regulation from council building permit approval. CBOS regulates the licensed practitioner: who can lawfully carry out building work in Tasmania. The local council, through an appointed permit authority, regulates the specific project: whether the proposed building work complies with planning, the National Construction Code and the Director's Determinations. Both approvals are required, and they verify different things.

Disputes that cannot be resolved through CBOS conciliation may be heard by the Tasmanian Civil and Administrative Tribunal (TASCAT), the consolidated tribunal that absorbed the jurisdictions of several previous Tasmanian tribunals. TASCAT provides a lower-cost, less formal alternative to court for many building-related disputes. For a national overview of how state and territory regulators differ, refer to the BUILTLY guide on how to check a builder's licence in Australia, and for the dispute pathway specifically, the BUILTLY guide on how to handle building disputes in Australia.

Tasmanian builder licence categories and classes

The CBOS builder licence is divided into three categories, each with sub-classes that scale to the complexity, height and risk of the building work the licensee can lawfully undertake. The category and sub-class together determine the scope of work the builder is authorised to manage or carry out.

Builder (General Construction)

The general construction category covers the construction, demolition, alteration, addition, relocation or repair of any building or structure. It is the category that applies to most residential builders and is divided into four sub-classes:

  • Domestic - scoped specifically to residential dwellings. Eligibility requires a Certificate IV in Building and Construction (Building) and at least two years of supervised experience for trade-qualified applicants, or four years for those without a trade qualification.
  • Low Rise - covers residential and low-rise commercial work within the limits set by the Director's Determinations. Same qualification baseline as Domestic, with the scope extended into limited commercial application.
  • Medium Rise - extends the scope to medium-rise construction with a higher technical threshold. Eligibility requires a Diploma of Building and Construction (Building) and supervised experience at the relevant level.
  • Open - the unrestricted general construction class with no height limit. Eligibility requires an Advanced Diploma of Building and Construction Management or a building degree, plus three to six years of supervised experience depending on background.

Fire protection services builder

A specialist category for builders responsible for managing or carrying out fire protection services work in a building. Sub-divided into Low Rise, Medium Rise and Open with qualifications and experience scaled accordingly. This category is unlikely to be relevant to a typical residential homeowner but may apply to multi-residential or mixed-use projects.

Demolisher

A specialist category for the management or carrying out of demolition. Sub-divided into Low Rise, Medium Rise and Open with experience requirements scaled to building height and complexity. A demolisher cannot perform any new building work.

Building Designer and Building Surveyor

Building designers and building surveyors are licensed under separate occupational categories administered by CBOS. A building designer prepares plans and specifications. A building surveyor is the statutory certifier who assesses building work for compliance with the National Construction Code and the Building Act 2016 (Tas), issues building permits and signs the occupancy permit on completion. Neither role is interchangeable with a builder licence, and most residential projects involve all three: a designer who documents, a surveyor who certifies and a builder who constructs.

Specialist trade licences

Plumbers, gas fitters and electricians are licensed under separate Tasmanian occupational frameworks. CBOS administers plumbing and gas fitting licensing, while electrical work is regulated under separate Tasmanian electrical legislation. For a residential build these licences sit beneath the head builder, with the builder responsible for engaging appropriately licensed trades.

Owner-builder permits

Owner-builder permits are administered by CBOS as a separate framework. An owner-builder permit allows an individual to carry out building work on their own property without holding a builder licence, subject to defined limits and conditions. This is not a builder licence and does not authorise the holder to contract for building work for any other party. The trade-offs are covered in the BUILTLY guide on owner-builder versus licensed builder.

Understanding licence conditions, restrictions and endorsements

A current Tasmanian builder licence is the headline outcome of the CBOS register check, but the detail beneath that headline matters. Conditions, restrictions and endorsements all appear on the public record and each shapes what the licensee is actually authorised to do.

Conditions are limitations imposed by CBOS on the way the licensee may operate. A condition might require ongoing supervision by a more senior licensee, restrict the builder to a specific scope of work below the standard sub-class limit, cap the value of contracts the builder can enter, or require additional reporting to CBOS. Conditions can be imposed on initial registration, on renewal, or as the outcome of a disciplinary process. They appear on the public record alongside the licence status.

Restrictions typically arise from a remedial pathway following a complaint or disciplinary action. A restriction might confine the builder to specific project types, exclude work in defined geographic areas, or require a probationary period during which performance is monitored. Restrictions are different from conditions in nature but sit on the same public record and warrant the same level of attention.

Endorsements are additional permissions granted on top of the base licence. The most common is the roof drainage endorsement, which allows a licensed builder who has demonstrated competence to carry out roof plumbing work. Endorsements broaden a licensee's scope rather than narrow it, but they should still be read carefully against the proposed scope of work to confirm relevance.

When a registered Tasmanian builder presents a CBOS register output, read the full record. A current licence with three conditions attached is not the same as a current licence with no conditions. Where conditions appear, ask the builder directly to explain the circumstances and confirm in writing that the proposed scope of work falls within the conditions. Historical disciplinary action that has concluded without ongoing conditions is a different signal from active conditions still in force.

How to check a builder's licence via the CBOS register

The CBOS Building Practitioner Register is published online and free to use. Verification takes a few minutes and should be completed before any preliminary agreement, deposit or contract is signed. The register is the authoritative source for builder licensing in Tasmania.

Step-by-step process

  1. Visit cbos.tas.gov.au and navigate to the licensing and registration section, then to the search for licensed occupations
  2. Choose the practitioner type as Builder (General Construction), Building Designer, Building Surveyor, Plumber, Gas Fitter or whichever category is relevant
  3. Enter the builder's individual name, business name or licence number into the search field
  4. Review the results and identify the correct practitioner by confirming the spelling of the name, the business name and the location
  5. Open the practitioner record to view licence status, registered category and class, expiry date and any conditions, restrictions or endorsements
  6. Cross-check the licence number and registered name against the details on quotes, preliminary agreements and the proposed building contract - they should match exactly
  7. Save or screenshot the register output, dated, as part of your project records before signing any agreement

The search supports multiple entry points. If a builder operates under both an individual name and a company name, search both. If the builder has provided a licence number, use it as the primary search term to avoid name-collision results. Where a builder operates under several business names, confirm which entity holds the registration and which entity is named on the contract; they should be the same.

Search behaviour is functionally similar on mobile and desktop, but the practitioner record is easier to read on a larger screen where the full table of conditions and historical actions can be displayed without scrolling. For project-record purposes the desktop screenshot is preferred, with the URL bar and date visible in the captured image.

A nil-results outcome does not necessarily mean the builder is unlicensed - it can also mean the search term is incorrect, that the licensee operates under a different name, or that the licence is held by an associated company. Try variations of the spelling, search by business name and licence number, and if no record is returned under any combination, contact CBOS directly to confirm the position before taking the absence at face value.

The CBOS check is the regulatory baseline. The wider due-diligence framework around it is described in the BUILTLY guide on how to vet a builder in Australia, and the contract-stage steps are covered in how to read a building contract in Australia.

What to look for in the licence check results

A current licence result is the starting point, not the conclusion. Read the full record before drawing comfort from the headline status.

Active, expired or cancelled status

The licence must be active at the date the contract is signed and at the date work commences. An expired or cancelled licence means the builder is not lawfully authorised to carry out registered building work. If the expiry date is approaching, ask for written confirmation that renewal has been lodged and that any continuing professional development requirements have been met before any commitment is made.

Category and sub-class

Confirm the licence category (Builder General Construction, Fire Protection, Demolisher) and sub-class (Domestic, Low Rise, Medium Rise, Open) match the proposed scope of work. A builder licensed for Domestic work cannot lawfully contract for medium-rise work regardless of capability, and a Low Rise licensee cannot lawfully take on Open scope.

Conditions, restrictions and endorsements

These appear on the public record and each shapes what the licensee can actually do. Cross-reference what you find against the section above on conditions and endorsements, and ask the builder to explain anything you do not understand.

Renewal date proximity

A licence approaching expiry is not automatically a problem, but it is a project-management consideration. If renewal is delayed for any reason and the licence lapses mid-project, work cannot lawfully continue until renewal is processed. Where the renewal date falls within the construction programme, ask the builder to confirm in writing that renewal will be lodged on time.

Insurance and CPD compliance

Continuing Professional Development is a condition of CBOS licence renewal. Insurance currency, including the $5 million public liability cover and Contract Works insurance required for licence holders, must also be maintained. The register reflects current registration status, which is contingent on these being in place.

Disciplinary history

Past suspensions, cancellations or formal complaints recorded against the practitioner appear on the record. Read the full record - the existence of a single isolated matter is less significant than a pattern of repeated issues. Pattern matters more than presence.

Trading names and entity links

A licensee may operate under a personal name and one or more business names. Confirm which entity holds the licence and which entity will be named on the contract. The two should match. If the contract is to be signed by a company that does not hold the licence, the engagement is not protected by the regulatory framework.

Recent registration

A very recent registration is not a problem in itself but provides less track record to assess. In a small market like Tasmania, this is worth noting and offsetting with stronger reference and past-project verification.

Tasmanian residential building insurance and warranty

Tasmania reintroduced a statutory Home Warranty Insurance scheme through the Residential Building (Home Warranty Insurance Amendments) Act 2023 (Tas). Under this framework, building contractors are required to take out a Home Warranty Insurance policy, with the homeowner named as the beneficiary, for each residential building contract exceeding $20,000. The scheme covers new dwellings, additions and substantial alterations, and operates as a mandatory last-resort scheme protecting homeowners against incomplete or defective building work where the builder has died, disappeared or become insolvent.

The Home Warranty Insurance scheme operates alongside the licence-level insurance that builders must hold as a condition of CBOS registration. As part of the licence application and renewal checklist, builders must provide evidence of $5 million public liability insurance and Contract Works insurance. CBOS does not accept tax invoices as proof of cover; a current certificate of currency is required at each renewal cycle.

Before paying any deposit on a residential building contract above the threshold, ask for the certificate of insurance for the Home Warranty Insurance policy specific to your project, with your name as the beneficiary. Verify the policy number and effective dates, and retain a copy with your project records. The certificate should be supplied before the contract is signed and definitely before any deposit is paid.

For residential work, contracts and dispute resolution sit under the Residential Building Work Contracts and Disputes Resolution Act 2016 (Tas), which prescribes mandatory contract content, deposit limits and a defined early dispute resolution pathway. The Building Act 2016 (Tas) provides the broader warranty obligations that bind a Tasmanian builder, including the obligation to carry out work in accordance with the National Construction Code, plans, specifications and any conditions of building permit.

Proceeding with an uninsured builder, or proceeding without a Home Warranty Insurance certificate where one is required, removes the most important safety net in the framework. The cost of insurance is built into the contract price; refusing to pay it does not remove the obligation - it simply means the obligation has been ignored. For a national overview of warranty protections that operate alongside state insurance schemes, refer to the BUILTLY guide on builder warranties in Australia.

Red flags when checking a Tasmanian builder's licence

Several patterns in CBOS register output warrant pause before any commitment. None are automatic disqualifiers, but each requires explanation before signing a contract.

Warning signs

  • No licence found - the builder cannot be located on the register under any spelling or trading name. Try variations and confirm with CBOS before assuming. If still not found, do not proceed.
  • Recently expired licence - registration shows as lapsed within the last thirty to ninety days. Confirm in writing that renewal has been lodged, that CPD requirements have been met, and that the public register has been updated before any deposit is paid.
  • Restricted sub-class versus project scope mismatch - the registered class does not cover the work you intend to commission. A Domestic licensee cannot lawfully contract for medium-rise work; a Low Rise licensee cannot take on Open scope.
  • Multiple business names with mixed registration - the builder operates several trading names but only one holds current registration. Confirm which entity will be named on the contract and that this entity holds the licence.
  • Recently restored licence after suspension - the licence has returned to current status following a suspension or cancellation. Ask for the circumstances and review the public record carefully. A restored licence with conditions attached is a different proposition from a clean record.
  • Pattern of disciplinary history - prior suspensions, cancellations or formal complaints recorded against the practitioner across multiple events. Pattern matters more than any single isolated matter.
  • Insurance not current - CBOS registration is contingent on insurance currency, but if a project-specific Home Warranty Insurance certificate is not produced when requested, treat the absence as a serious flag.
  • Director or entity changes immediately before contract - a recent change of director, recent incorporation of a new company, or a new business name registered shortly before the engagement warrants questions about why the change occurred.
  • Reluctance to provide licence number - a Tasmanian builder licence is a public credential. Reluctance to share the number is itself a flag.
  • Cash-only or off-contract requests - any request to pay in cash to avoid GST, to operate without a written contract, or to bypass insurance requirements is a serious flag and a likely breach of the regulatory framework.

For the broader pattern of warning signs that emerge during the engagement process, see the BUILTLY guide on red flags when choosing a builder. Photography in particular benefits from a sceptical eye - the BUILTLY guide on how to tell if project photos are real covers the verification techniques that distinguish a builder's own completed work from staged or borrowed imagery.

What to do if a Tasmanian builder isn't licensed

Engaging an unlicensed builder for work that requires a Tasmanian licence removes most of the consumer protections the Building Act 2016 (Tas) and the Residential Building Work Contracts and Disputes Resolution Act 2016 (Tas) provide. Building permits cannot be lawfully issued for work performed by an unlicensed builder; Home Warranty Insurance is unavailable; and council enforcement powers can require demolition or rectification at the owner's cost.

If you discover a builder is unlicensed before work has commenced, do not proceed. If you discover the position after work has started, stop work, document the position in writing and seek advice before continuing. Do not pay further amounts on the contract until the position is clarified. Photograph the state of works, retain copies of all contracts, quotes, invoices and correspondence, and request the builder produce evidence of licensing. The absence of evidence becomes part of the documented position.

Unlicensed building activity can be reported to CBOS through the complaint channels published on cbos.tas.gov.au. CBOS investigates breaches of the Building Act 2016 and can take regulatory action where the evidence supports it, including penalties, prosecutions and orders. The complaint form requires details of the alleged unlicensed work, the parties involved and supporting documentation. CBOS also handles consumer disputes connected to building work, providing early dispute resolution support before matters proceed to formal determination.

Disputes that cannot be resolved through CBOS conciliation may be heard by the Tasmanian Civil and Administrative Tribunal (TASCAT). TASCAT provides a lower-cost, less formal alternative to court for many building-related disputes and can make orders for rectification, payment and other remedies. Where work has already commenced under an unlicensed engagement, the legal position is more complex and independent advice from a Tasmanian construction lawyer is generally warranted before lodging at TASCAT.

Recovery prospects depend on whether the builder is solvent, whether assets remain available against any judgment and whether the contract itself is enforceable in the form it was signed. The general rule is that prevention is far cheaper than recovery. The CBOS register check is the prevention step, and it costs nothing.

Builder licence vs business registration vs trade qualifications

Tasmanian builders typically present several different credentials in their marketing, on quotes and on websites. Only one is the actual builder licence under the Building Act 2016 (Tas). Confusion between the four is one of the most common sources of inadequate verification.

  • CBOS builder licence - the regulatory authorisation to carry out registered building work in Tasmania. Issued under the Building Act 2016 (Tas). Required by law. Verifiable on the public Building Practitioner Register at cbos.tas.gov.au.
  • ASIC company registration - proves the corporate entity exists and identifies its directors. Does not establish competence, regulatory standing or any right to carry out building work. Useful to verify the entity exists, who controls it and that it has not been deregistered.
  • ABN registration - confirms the entity is registered with the Australian Taxation Office for tax and GST purposes. Does not establish competence or any right to carry out building work. Useful to confirm tax registration status.
  • Trade qualifications - certificates such as Certificate IV in Building and Construction (Building) demonstrate the educational baseline that supports an application for a CBOS licence. They are an input to licensing, not a substitute for it. A builder presenting a Certificate IV without a current CBOS licence is presenting a qualification, not an authorisation.
  • Industry association membership - Master Builders Association of Tasmania (MBA Tas) and Housing Industry Association (HIA) Tasmania branch memberships are voluntary and demonstrate the builder has chosen to join an industry body that may impose its own conduct and quality standards. Membership is a positive signal but is not a regulatory authorisation. Refer to the BUILTLY guide on Master Builders Awards Australia for what these memberships mean and how to verify award claims.

A legitimate Tasmanian builder will commonly hold all four: ASIC company registration, ABN, trade qualifications and a current CBOS licence, and may also hold MBA Tas or HIA membership. Only the CBOS licence is required by law to lawfully contract for building work. The others are useful supporting credentials but cannot substitute for licensing.

Beyond the licence check: additional verification steps

The CBOS register confirms a builder's regulatory standing. It does not confirm financial stability, project quality, current capacity or the truthfulness of past-project claims. A complete verification process layers several additional checks on top of the licence search.

  • ASIC company history check - search the builder's company on the ASIC register to confirm the entity is current, who the directors are, when the company was incorporated and whether there have been recent changes of control. Recent incorporation immediately before contracting is a flag.
  • BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
  • References from previous clients - request contact details for at least three to five recent clients of similar project type and speak directly with each. A reluctant referee is more informative than a glowing testimonial.
  • Reviewing past work in person - inspect completed projects on the ground where possible. Photography can be selective; a site visit cannot be staged.
  • Subcontractor and supply chain quality - ask which subcontractors and suppliers the builder uses. A stable, locally embedded subcontractor base is a positive signal in the smaller Tasmanian market.
  • Financial stability indicators - current insurance, bonding capacity, the willingness to accept staged progress payments and the absence of pressure for upfront cash all point to a financially stable operation.
  • Communication style and response timeliness - the way a builder communicates during the quoting stage is a fair predictor of how they will communicate during construction. Vague answers, missed timelines and reluctance to commit anything to writing are flags.
  • Industry association membership - confirm Master Builders Tasmania (MBA Tas) and HIA Tasmania branch memberships directly with the relevant body. Memberships can lapse, and a website logo is not proof of current standing.

BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.

BUILTLY and Tasmanian builder verification

BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.

BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.

Frequently asked questions

How do I find a builder's licence number in Tasmania?

Ask the builder directly for their CBOS licence number. Reputable Tasmanian builders display the number on quotes, contracts, websites, vehicle signage and printed marketing material. If the builder cannot or will not provide the number, search the CBOS Building Practitioner Register at cbos.tas.gov.au by individual name or business name. If no record is returned under any spelling, treat the absence as a strong signal not to proceed.

What if a builder won't share their licence number?

Reluctance to share a licence number is itself a red flag. A current Tasmanian builder licence is a public credential under the Building Act 2016 (Tas) and there is no legitimate reason to withhold it. If a builder declines to provide the number, decline to engage. Lodge a query with CBOS if you suspect the builder is operating without a current licence.

Can a NSW builder work in Tasmania?

As of the current CBOS guidance, builders are not yet covered under Automatic Mutual Recognition (AMR) in Tasmania. A builder licensed in NSW (or any other state) cannot rely on their interstate licence to carry out work in Tasmania that requires registration. They must apply for a Tasmanian builder licence through CBOS, with mutual recognition assessed under the existing interstate and New Zealand applicants framework. Confirm Tasmanian registration on the CBOS register before contracting any interstate builder.

How long does CBOS take to investigate a complaint?

Investigation timeframes depend on the nature and complexity of the complaint. Straightforward licensing breaches can be assessed quickly, while complex defects, contract or financial matters take longer. CBOS publishes complaint procedures at cbos.tas.gov.au. For complaints that proceed beyond CBOS conciliation, the Tasmanian Civil and Administrative Tribunal (TASCAT) hears building disputes and provides a formal determination pathway.

Does a Tasmanian builder need separate insurance for each job?

A licensed Tasmanian builder must hold $5 million public liability cover and Contract Works insurance as conditions of CBOS registration. Under the Residential Building (Home Warranty Insurance Amendments) Act 2023, builders are also required to take out Home Warranty Insurance for each residential building contract exceeding $20,000, with the homeowner as the beneficiary. The two insurance categories operate together: licence-level insurance covers the builder's general business risks, while project-level Home Warranty Insurance covers the homeowner against incomplete or defective work.

What's the difference between a builder and a building surveyor in Tasmania?

A licensed builder contracts to carry out construction work. A licensed building surveyor is the statutory certifier who assesses building work for compliance with the National Construction Code and the Building Act 2016 (Tas), issues building permits and signs occupancy permits. The two roles are separately licensed under different categories and cannot be substituted for each other. Most residential projects involve both a registered builder and an appointed building surveyor.

Related guides