How to Check a Builder's Licence in Australia: A State-by-State Guide

·Last updated: October 2026

Find your state

Building a home or undertaking a major renovation is one of the largest financial commitments most Australians will make. Verifying that a builder holds a current, appropriate licence before signing a contract is one of the most basic protections available - and one that takes less than five minutes using free government online tools. This guide explains how to check a builder's licence in every Australian state, what the licence registers show, and what to do with what you find. For the broader project context, see the complete guide to building a house in Australia.

In Australia a builder's licence is also referred to as a builder registration in some states - particularly Victoria where the Building and Plumbing Commission - BPC - registers builders rather than issuing licences. Checking whether a builder is registered uses the same process as a licence check - search the state register using the builder's name or company name and confirm the registration is current and of the correct class.

Find your state's official register

Builder registers are managed by each state and territory

Use the links below to search the official builder licence register in your state. Each register is maintained by the relevant state regulator.

Or join the BUILTLY waitlist

Be the first to know when verified builder profiles launch in your state.

Join Waitlist

Why checking a builder's licence matters

In Australia, residential building work above certain value thresholds requires the builder to hold a current licence or registration issued by the relevant state authority. A licence confirms that the builder has met the qualification, experience and financial requirements set by the regulator and is legally authorised to contract for and supervise building work.

Building with an unlicensed contractor creates serious practical and legal risks including no access to home warranty insurance, no access to state dispute resolution processes, potential complications with council sign-off and occupancy certificates, and limited legal recourse if work is defective or incomplete.

Importantly, the licence register in most states shows more than just current status. It also shows licence class, any conditions placed on the licence, past suspensions, disciplinary actions and infringement notices. Reading the full record - not just confirming the licence is active - is the complete check.

A licence is a regulatory minimum. It confirms the builder is authorised to operate. It does not by itself confirm the quality of their work, their financial stability or their project history. Those checks require additional steps covered in the companion guides How to Check a Builder's ABN and Company History Australia and How to Verify Who Actually Built a Property Australia.

State-by-state licence check reference

State / TerritoryRegulatorSearch toolThreshold for licence
QueenslandQBCC - Queensland Building and Construction CommissionQBCC Licensee Search at qbcc.qld.gov.au$3,300 for residential work
New South WalesBuilding Commission NSWService NSW licence check at service.nsw.gov.au$5,000 for residential work
VictoriaBuilding and Plumbing Commission (BPC)BPC practitioner search$10,000 for domestic building work
Western AustraliaBuilding and Energy WAContractor Register at buildingcommission.wa.gov.auGenerally required for building work over $20,000 in prescribed areas, subject to exemptions
South AustraliaConsumer and Business Services (CBS)Licence search at cbs.sa.gov.auBuilding work contractor licence required
ACTAccess CanberraLicence search at accesscanberra.act.gov.auBuilder licence required
TasmaniaConsumer, Building and Occupational Services (CBOS)Licence search at cbos.tas.gov.auBuilding work above threshold
Northern TerritoryNT Building Advisory ServicesLicence search at nt.gov.auBuilder registration required

Note: Licence thresholds and regulatory names change periodically. Always confirm current requirements with the relevant state authority before engaging a builder.

What licence registers show

InformationQLD (QBCC)NSW (Fair Trading)VIC (BPC)WA (Building and Energy)
Current licence status✓✓✓✓
Licence class and scope✓✓✓✓
Conditions on licence✓✓✓✓
Disciplinary actions✓✓Separate disciplinary register✓
Infringement notices✓✓Via disciplinary register✓
Demerit points✓ - - -
Cancellations and suspensions✓✓✓✓
Home warranty insurance claims✓ - - -
Financial category✓ - - -

The most comprehensive public record is the QBCC register in Queensland, which shows demerit points, infringement notices, directions to rectify work, home warranty scheme claims and disciplinary actions - all on a single searchable record.

How to check a builder's licence in Queensland

The regulator

In Queensland, builder licensing is managed by the Queensland Building and Construction Commission (QBCC). The QBCC Licensee Register is free to search and shows the full licence record including conditions, disciplinary history, demerit points and infringement notices. See also QBCC Licence Check: How to Verify a Builder's Licence in Queensland for a detailed guide.

How to search

Go to qbcc.qld.gov.au and navigate to the licence search tool. Search by the builder's name, company name or licence number. The licence number should appear on any quote, contract or advertising material - QBCC licensees are required to display their licence number on all business materials. Searching by licence number is the most accurate method.

What the Queensland register shows

The QBCC register shows significantly more than most other states. Click through to the full licence record rather than stopping at the status confirmation. A complete QBCC record shows:

  • Licence status - current, suspended, cancelled or expired
  • Licence class - the category of building work the licence authorises, including the financial category which limits the maximum annual turnover of work the licensee can undertake
  • Conditions - any restrictions placed on the licence
  • Demerit points - accumulated from specific offences under the QBCC Act and Domestic Building Contracts Act. A licensee who accumulates 30 demerit points over three years can face a three-year industry ban
  • Infringement notices - formal penalties for specific offences. Records of paid infringement notices remain on the register for five years
  • Directions to rectify - formal orders issued by QBCC to rectify or complete building work. Shows whether the licensee has complied
  • Disciplinary actions - formal disciplinary proceedings including the outcome
  • Home Warranty Scheme claims - whether any claims have been approved under the Queensland Home Warranty Scheme for work done by this licensee

A builder with a clean QBCC record and an active licence in the appropriate class is confirmed as current and has no recorded regulatory issues. A builder with demerit points, infringement notices or rectification directions warrants careful consideration and further investigation before signing.

Licence classes in Queensland

QBCC licence classes are structured by building type and scale. For residential construction, confirm the builder holds a licence class that covers Class 1a buildings (detached dwellings) and the relevant scale of project. The financial category shown on the licence limits the maximum annual value of building work the licensee can undertake. A builder with a financial category insufficient for your project value is a red flag.

How to check a builder's licence in New South Wales

The regulator

In New South Wales, builder licensing is regulated by Building Commission NSW under the Home Building Act 1989. NSW Fair Trading remains a contact for building complaints and dispute resolution. Licence searches are conducted through Service NSW. See also How to Check a Builder's Licence in NSW for a detailed guide.

How to search

Go to service.nsw.gov.au and use the Check a Builder or Tradesperson Licence tool. Search by the builder's name, licence number or ABN. The search is free.

What the NSW register shows

The Service NSW licence check shows:

  • Current licence status - active, suspended or cancelled
  • Licence type - contractor licence or supervisor certificate
  • Licence class - the categories of work authorised
  • Any conditions endorsed on the licence
  • Details of any cancellation or suspension under the Home Building Act 1989 or the Fair Trading Act 1987
  • Details of any public warnings issued regarding the licence holder
  • Formal cautions, penalty infringement notices and any instances of non-compliance with a related tribunal order

In NSW, residential building work over $5,000 requires a licensed contractor. Confirm the builder holds a contractor licence - not just a supervisor certificate - if they are contracting directly with you.

How to check a builder's licence in Victoria

The regulator - important 2025 update

Victoria's building regulator is now the Building and Plumbing Commission (BPC), which commenced on 1 July 2025. The BPC replaced the Victorian Building Authority (VBA) and absorbed the functions of the VBA, Domestic Building Dispute Resolution Victoria and the domestic building insurance arm of the Victorian Managed Insurance Authority.

Use the current BPC practitioner search to check registration and the separate BPC Compliance and Enforcement Register to check disciplinary history. Any reference to the VBA as Victoria's current regulator in older materials is outdated - the current regulator is the BPC. See also How to Check a Builder's Registration in Victoria for a detailed guide.

How to search

Use the BPC website's practitioner search. Search by the builder's name or registration number. Also search the BPC Compliance and Enforcement Register as a separate step - disciplinary history in Victoria is recorded on a separate register from the practitioner directory.

What the Victoria registers show

The Find a Practitioner directory confirms:

  • Current registration status
  • Registration class and category
  • Whether registration is current, expired or cancelled

The BPC Compliance and Enforcement Register shows:

  • All disciplinary proceedings since April 2019 for individuals and July 2018 for companies
  • Contraventions of the Building Act, Building Regulations and Domestic Building Contracts Act
  • Entries remain on the register for five years after they are imposed or cease to have effect

In Victoria, domestic building work over $10,000 requires a registered building practitioner. From 1 July 2026 the new Victorian Home Warranty scheme, administered by the BPC, applies to eligible contracts over $20,000, while legacy Domestic Building Insurance continues for earlier contracts. Check which scheme and trigger applies to your contract.

How to check a builder's licence in Western Australia

The regulator

In Western Australia, building contractor registration is managed through the Building Services Board, the statutory authority, supported by Building and Energy within the Department of Local Government, Industry Regulation and Safety (LGIRS). See also How to Check a Builder's Registration in Western Australia for a detailed guide.

How to search

Go to buildingcommission.wa.gov.au and use the contractor register search. Search by the contractor's name, business name or registration number.

What the WA register shows

The WA contractor register confirms current registration status, registration class and any conditions or restrictions. Registration is generally required for building work over $20,000 in prescribed areas, subject to exemptions. Confirm the registration class covers the type and scale of work proposed.

How to check a builder's licence in South Australia

The regulator

In South Australia, building work contractor licensing is managed by Consumer and Business Services (CBS). See also How to Check a Builder's Licence in South Australia for a detailed guide.

How to search

Go to cbs.sa.gov.au and use the licence search tool. Search by business name or licence number.

What the SA register shows

The CBS licence register confirms whether the contractor licence is current and the class of work authorised. A building work contractor licence is required for residential construction in South Australia.

How to check a builder's licence in the ACT

The regulator

In the Australian Capital Territory, builder licensing is managed by Access Canberra. See also How to Check a Builder's Licence in the ACT for a detailed guide.

How to search

Go to accesscanberra.act.gov.au and use the licence and registration search. Search by name or licence number.

What the ACT register shows

The Access Canberra register confirms current licence status and class. A builder licence is required for residential building work in the ACT. Confirm the class covers the scope of your project.

How to check a builder's licence in Tasmania

In Tasmania, building practitioner licensing is managed by Consumer, Building and Occupational Services (CBOS). Search the licence register at cbos.tas.gov.au by name or licence number, and confirm the class covers the work proposed. See How to Check a Builder's Licence in Tasmania for the detailed guide.

How to check a builder's registration in the Northern Territory

In the Northern Territory, builders are registered through NT Building Advisory Services. Search the practitioner register at nt.gov.au and confirm the registration is current and of the correct class. See How to Check a Builder's Registration in the Northern Territory for the detailed guide.

How to read a licence record - what to look for

Status

The licence must be current and active. Expired, suspended or cancelled means the builder is not currently authorised to contract for building work. Do not proceed with any builder whose licence is not active.

Licence class

Confirm the licence class covers the type of work proposed. A builder registered for commercial construction may not hold a residential licence class. A builder with a licence restricted to renovation work may not be authorised for new construction. In Queensland, confirm the financial category is appropriate for the project value.

Conditions

Any conditions on a licence restrict what the builder can do or how they must operate. Conditions may require supervision, restrict the type or value of work, or impose reporting requirements. Understand what any condition means before proceeding.

Disciplinary history

In Queensland, all disciplinary information appears on the main licence record. In Victoria, check the separate Compliance and Enforcement Register on the BPC website in addition to the practitioner directory. In NSW, disciplinary information appears on the Service NSW licence check.

A single minor infringement from several years ago is different from a pattern of disciplinary actions, multiple rectification orders or recent licence suspension. Read the full record and assess the pattern rather than just noting whether anything exists.

Red flags when checking a licence

Warning signs

  • Licence is expired, suspended or cancelled - do not proceed
  • Builder cannot or will not provide a licence number before contract signing
  • Licence class does not cover the type or scale of work proposed
  • Financial category (Queensland) is insufficient for the project value
  • Multiple demerit points or infringement notices on the Queensland record
  • Directions to rectify on the Queensland record that have not been marked as complied
  • Disciplinary proceedings on the NSW or Victoria registers within the past five years
  • The name on the licence does not match the name on the quote or contract
  • The licence was issued very recently despite claims of long experience - check ABN registration date as a companion check
  • Builder claims to operate under a company but cannot provide the company's QBCC or BPC registration separately from the individual licence

If a register shows the builder has been suspended or disqualified, see what a suspended or disqualified builder means before taking further steps.

What a licence check does not cover

A licence check confirms regulatory authorisation. It does not tell you:

  • Whether the builder is financially stable or at risk of insolvency
  • Whether the builder has been involved in previous company failures under different entity names
  • Whether the builder has the specific experience relevant to your project type
  • Whether the builder's completed projects demonstrate the quality you expect

These additional checks are covered in companion guides. The How to Check a Builder's ABN and Company History Australia guide covers company registration, director track record and insolvency history through the Australian Business Register and ASIC. The How to Verify Who Actually Built a Property Australia guide covers project verification through BUILTLY. See also How to Check if a Builder Has Insurance in Australia and How to Vet a Builder in Australia.

Complete pre-contract licence verification checklist

  • Ask the builder for their licence number before any other step - it should be on their quote and any advertising material
  • Search the licence on the relevant state register and confirm status is active and current
  • Confirm the licence class covers the type and scale of work proposed
  • In Queensland, click through to the full QBCC record and review demerit points, infringement notices and directions to rectify
  • In Victoria, search the BPC Compliance and Enforcement Register separately from the practitioner directory
  • In NSW, review the full Service NSW record including any cancellations, suspensions, conditions and infringement notices
  • Confirm the name on the licence matches the name on the quote and the entity you are contracting with
  • In Queensland, confirm the financial category is sufficient for the project value
  • Note any conditions on the licence and confirm you understand what they mean
  • Cross-check the company name and ABN against the Australian Business Register to confirm the entity is active and the registration date is consistent with claimed experience
  • Do not sign any contract or pay any deposit until the licence check is complete and satisfactory

BUILTLY and builder verification

BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.

Frequently asked questions

How do I check a builder's licence in Australia?

Each state has its own licensing authority and search tool. In Queensland, search the QBCC Licensee Register at qbcc.qld.gov.au. In NSW, use the Service NSW licence check tool. In Victoria, use the BPC practitioner search - Victoria's regulator is now the Building and Plumbing Commission (BPC) as of 1 July 2025. In Western Australia, use the Building and Energy contractor register. All searches are free. You need the builder's name, licence number or ABN to search.

What does a builder's licence register show?

At minimum, a licence register shows current licence status, licence class and any conditions. In Queensland the QBCC register also shows demerit points, infringement notices, directions to rectify building work, disciplinary actions and home warranty scheme claims - the most comprehensive public record of any state. In Victoria, disciplinary history is recorded on a separate Compliance and Enforcement Register and must be searched in addition to the main practitioner directory. In NSW, the Service NSW licence check shows cancellations, suspensions, conditions, public warnings and infringement notices.

Is the Victorian Building Authority (VBA) still the regulator?

No. The VBA was replaced by the Building and Plumbing Commission (BPC), which commenced on 1 July 2025. The BPC took over all VBA functions including practitioner registration, compliance, dispute resolution and domestic building insurance. Use the BPC practitioner search and Compliance and Enforcement Register. From 1 July 2026 a new Victorian Home Warranty scheme administered by the BPC applies to eligible contracts over $20,000, with legacy Domestic Building Insurance continuing for earlier contracts.

Does a builder's licence guarantee quality?

No. A licence confirms that a builder has met the qualification, experience and financial requirements to be authorised to contract for building work. It does not guarantee construction quality, project management capability or financial stability. A licensed builder can still produce defective work or become insolvent. Licence verification is the starting point for due diligence, not the endpoint. Companion checks covering company history, insolvency risk and verified project records provide a more complete picture.

What should I do if a builder refuses to give me their licence number?

Do not engage them. Builder licence numbers must appear on all quotes, contracts and advertising material in most states. A builder who is reluctant to provide their licence number before signing is either unlicensed or has something they do not want you to find on the register. Both are serious red flags. Always confirm a licence number and verify it independently before signing any contract or paying any deposit.

How do I check if a builder is registered in Australia?

Builder registration and builder licensing refer to the same requirement in most Australian states - a licensed or registered builder holds a current approval from the state building regulator to perform residential construction work. To check whether a builder is registered, search the applicable state register - Service NSW in NSW, QBCC in Queensland, BPC in Victoria, Building and Energy in WA. Enter the builder's name or company name and confirm the registration is current and of the correct class for your proposed work.