Verification

Builder Licence Check NSW: How to Verify a Builder's Licence Before You Sign

Last updated: October 2026 ·

Checking a builder's licence in NSW takes less than two minutes using the Service NSW licence check at service.nsw.gov.au - but knowing what the result means, what the licence classes cover and what red flags to look for requires more than a simple name search. This guide covers the complete NSW builder licence check process - how to search, what each result means, what conditions and disciplinary history tell you about a builder and what to do if the licence is suspended or cancelled. For broader context on how licence verification fits into a residential build, see the BUILTLY complete guide to building a house in Australia.

Official NSW builder register

Search the Service NSW licence check

NSW Fair Trading licences are searchable through Service NSW. Verify a builder's licence number, status and any conditions in under a minute.

Open Service NSW Licence Check
Or join the waitlist

Verified NSW builders coming soon

Be notified when verified builder profiles launch in New South Wales. Real projects, full project teams.

Join Waitlist

How to check a builder's licence in NSW

To check a builder's licence in NSW search the Service NSW licence check at service.nsw.gov.au - enter the builder's name or company name - confirm the licence is current and of the correct class for the proposed work. A valid NSW contractor licence for residential building work is required for any residential construction project above $5,000. The search result shows the licence status - active, suspended or cancelled - the licence class - which determines what work the builder is licensed to perform - and any conditions attached to the licence.

What is NSW Fair Trading and why does it matter?

Building Commission NSW is the building regulator in New South Wales. Use Service NSW for licence checks. NSW Fair Trading remains a contact for missing licence records, while icare administers the Home Building Compensation Fund.

Under the Home Building Act 1989, it is illegal to carry out residential building work valued above $5,000 - including labour and materials - without holding the appropriate NSW contractor licence issued under Building Commission NSW. Engaging an unlicensed builder in NSW exposes homeowners and developers to significant financial and legal risk, including loss of access to home building compensation cover and limited recourse if the work is defective or incomplete.

Note for 2026: Building Commission NSW is the building regulator. Licence checks are done through Service NSW, and NSW Fair Trading remains a contact if a record cannot be found. Both bodies are referenced throughout this guide where relevant.

How to check a builder's licence in NSW.

Service NSW provides access to a free, publicly accessible online licence register - known as the Licence Check tool - that allows anyone to search for a licensed contractor.

Step-by-step process

  1. Visit Service NSW and use the builder or tradesperson licence check
  2. Navigate to the licence check tool - found under the building and construction section
  3. Enter the builder's name, company name or licence number
  4. Review the results to confirm licence status, class and any conditions or restrictions

The search can be conducted using an individual's name, a company or business name, or an NSW contractor licence number if the builder has provided one. For a national overview, see the BUILTLY guide on how to check a builder's licence in Australia.

What the NSW Fair Trading licence register shows.

The Service NSW licence check provides the following information for each licensed contractor:

Licence holder nameThe individual or company name as licensed under Building Commission NSW
Licence numberThe unique identifier assigned to the licence holder
Licence classThe category of work the licence holder is authorised to carry out
Licence statusWhether the licence is current, suspended, cancelled or expired
Conditions or restrictionsAny limitations placed on the licence holder's authorisation
Licence expiry dateThe date on which the current licence period ends
Insurance detailsWhether the licence holder has current home building compensation cover in place

Always confirm that the licence is current and that the licence class covers the type and value of work you are commissioning.

NSW contractor licence classes explained.

Building Commission NSW regulates different contractor licence classes depending on the type and scope of work a contractor is authorised to undertake. The most relevant classes for residential construction in NSW include:

Building - Contractor Licence

Check a builder's licence in NSW - search the Service NSW register, what the licence classes mean, what to look for and what a suspended licence means.

Swimming Pool and Spa Building - Contractor Licence

Check a builder's licence in NSW - search the Service NSW register, what the licence classes mean, what to look for and what a suspended licence means.

Trade Contractor Licences

Check a builder's licence in NSW - search the Service NSW register, what the licence classes mean, what to look for and what a suspended licence means.

Supervisor Certificate

Check a builder's licence in NSW - search the Service NSW register, what the licence classes mean, what to look for and what a suspended licence means.

For most residential construction projects in NSW, confirm that your builder holds a current building contractor licence - not merely a supervisor certificate.

Home Building Compensation Fund in NSW.

One of the key protections available to homeowners commissioning residential building work in NSW is the Home Building Compensation Fund (HBCF), formerly known as the Home Warranty Insurance Scheme. The HBCF is a last resort cover for eligible residential building work valued at over $20,000. A claim needs a trigger, such as the builder's death, disappearance or insolvency, or a licence suspension for not paying a court or NCAT money order, and only specified losses are covered. Cover is conditional on the applicable claim trigger and policy terms:

  • Specified losses from incomplete work, only where an applicable claim trigger and the policy or scheme conditions are met
  • Specified losses from defective work, only where an applicable claim trigger and the policy or scheme conditions are met
  • Failure or refusal to complete or rectify work alone does not establish cover; check the applicable claim triggers and conditions

The HBCF is administered through icare (Insurance and Care NSW) and is a mandatory requirement for eligible residential building work. Before signing a contract, confirm that your builder has obtained HBCF cover for your project and request a certificate of insurance. For more detail on builder insurance protections, refer to the BUILTLY guide on builder warranties in Australia.

Statutory warranties for residential building work in NSW.

Under the Home Building Act 1989, all residential building work in NSW is covered by statutory warranties regardless of what the building contract says. These warranties provide homeowners with legal protections that extend beyond the contractual defects liability period.

Key statutory warranties in NSW

  • Work will be carried out with due care and skill
  • Materials used will be suitable for the purpose and new unless otherwise agreed
  • Work will be carried out in accordance with the plans and specifications
  • Work will comply with all relevant laws and legal requirements
  • The home will be suitable for occupation upon completion

Statutory warranty periods in NSW

  • Major defects: 6 years from completion
  • Non-major defects: 2 years from completion

A major defect is defined as a defect in a major element of a building that causes or is likely to cause the inability to use the building for its intended purpose, the destruction of the building, or a threat to the health or safety of occupants.

For more detail on defects and warranty protections, refer to the BUILTLY guide on defects liability period in Australian construction.

Deposit and progress payment limits in NSW.

The Home Building Act 1989 sets out specific requirements for deposits and progress payments on residential building contracts in NSW. These protections are designed to limit the financial exposure of homeowners during construction.

Deposit limits

  • For contracts over $20,000: maximum deposit of 10 percent of the contract price
  • For contracts between $5,000 and $20,000: maximum deposit of 10 percent of the contract price

Progress payments

Progress payments must be linked to defined stages of construction completion. Builders cannot request progress payments in advance of completing the stage to which the payment relates.

Never pay a deposit before confirming that HBCF cover has been obtained and the certificate of insurance provided. For more detail on building contracts and payment structures, refer to the BUILTLY guide on building contracts in Australia.

What to do if a builder cannot be verified.

If a builder's licence cannot be found on the Service NSW register, or if the licence is shown as suspended, cancelled or expired, do not proceed with the engagement until the issue is resolved.

Steps to take if verification fails

  • Ask the builder directly - request their NSW contractor licence number and search again using that number specifically
  • Contact NSW Fair Trading - call or email NSW Fair Trading directly to verify the builder's status if the online search does not return a clear result
  • Do not sign a contract - avoid entering into a building contract until licence status is confirmed
  • Do not pay a deposit - never pay a deposit before confirming that the builder is licensed and that HBCF cover has been obtained
  • Seek an alternative builder - if a builder is unable or unwilling to provide verifiable licence details, this is a significant red flag

For further guidance on evaluating builders, refer to the BUILTLY guide on red flags to watch for when choosing a builder.

Warning signs when verifying a NSW builder

  • •Builder claims registration without providing a NSW contractor licence number
  • •Licence number provided does not match the Service NSW Public Register record
  • •Licence status shows as suspended, cancelled or expired
  • •Licence class does not match the work scope (e.g. supervisor certificate only, not a contractor licence)
  • •HBCF certificate of insurance not provided for work valued over $20,000
  • •Pressure to sign a contract or pay a deposit before HBCF cover is confirmed
  • •Multiple licence numbers used across different communications or quotes
  • •Refusal to provide the licence number in writing
  • •Unclear subcontract chain regarding which entity actually holds the licence
  • •Builder claims a Building Commission NSW licensing exemption without a clear or documented basis

BUILTLY and lasting project records

BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.

For the broader context on how licence checks sit alongside contracts, finance, design and handover, see the BUILTLY guide to researching a builder before signing a contract.

Checking disciplinary history in NSW.

The Service NSW licence check tool shows significantly more than current licence status. When you search a builder's licence, the full record includes:

Cancellations and suspensions

Any cancellation or suspension of the licence under the Home Building Act 1989 or the Fair Trading Act 1987 is shown on the record. A current suspension means the builder is not authorised to contract for building work. A past cancellation is a serious flag worth investigating.

Conditions endorsed on the licence

Any conditions restricting the scope, type or value of work the builder is authorised to undertake appear on the record. Confirm you understand what any condition means before proceeding.

Formal cautions

Formal cautions issued by NSW Fair Trading appear on the licence record. A caution is a regulatory warning that a specific conduct or practice was found to be in breach of requirements.

Penalty infringement notices

Penalty notices issued for specific offences appear on the record.

Non-compliance with tribunal orders

If the builder has been found by a tribunal to be non-compliant with an order - for example, failing to carry out ordered rectification work - this appears on the record.

Public warnings

NSW Fair Trading can issue public warnings about a licence holder under section 23 of the Home Building Act 1989. These warnings appear on the licence record.

NCAT decisions

The NSW Civil and Administrative Tribunal hears home building matters and its decisions are publicly available. Searching the builder's name in the NCAT decisions register provides additional context on any disputes that have proceeded to tribunal. This is a separate search from the Service NSW licence check.

How to read what you find

Do not stop at confirming the licence is current. Review the full record including conditions, cautions, penalty notices and any non-compliance with tribunal orders. A pattern of disciplinary history is more significant than a single isolated matter. Read the pattern, not just the existence of a record.

For more detail on researching builder complaints, refer to the BUILTLY guide on builder complaints and disputes in Australia. If you are planning to research a builder before signing a contract, checking the full disciplinary record is a valuable step in the due diligence process.

Key differences between NSW and other states.

Building regulation in Australia is administered at the state and territory level, meaning the licensing framework, terminology and processes differ between jurisdictions. The most important distinctions for NSW homeowners and developers to be aware of include:

  • •NSW uses the term contractor licence - not registration as in Victoria or licence class as in Queensland
  • •The home building compensation scheme in NSW is administered through icare rather than a state government authority as in Queensland
  • •NSW has a specific supervisor certificate class that is separate from a contractor licence - always confirm your builder holds a contractor licence, not only a supervisor certificate
  • •The Home Building Act 1989 governs residential building contracts in NSW and sets out specific requirements for contract content, deposit limits and statutory warranties
  • •NSW statutory warranties provide 6 years of protection for major defects - one of the longer statutory warranty periods in Australia

For a national overview of builder licence and registration requirements, refer to the BUILTLY guide on how to check a builder's licence in Australia. For state-specific requirements, see the guides on checking a builder's licence in Queensland and checking a builder's registration in Victoria.

Licence verification checklist.

Before engaging a builder in NSW, confirm the following:

Builder holds a current NSW contractor licence issued under Building Commission NSW - not only a supervisor certificate

Licence class covers the type and scope of work required

No active suspensions or conditions restrict the scope of work

Builder has obtained HBCF cover for your project before any deposit is paid

Certificate of insurance has been provided and reviewed

Licence is held by the individual or company entering the contract

Licence number matches the details provided by the builder

No significant disciplinary history through Building Commission NSW or NCAT

Full Service NSW licence record reviewed beyond current status - conditions, cautions, penalty notices and any tribunal non-compliance all checked

Frequently asked questions

How do I check a builder's licence in NSW?

To check a builder's licence in NSW visit service.nsw.gov.au and use the licence check tool - enter the builder's individual name or company name and confirm the result shows a active licence of the correct class for residential building work. A contractor licence for residential building is required for work above $5,000. Confirm the licence status is active - not suspended or cancelled - and check whether any conditions are attached to the licence. The search is free and takes less than two minutes.

What is the minimum value of work that requires a contractor licence in NSW?

Under the Home Building Act 1989, any residential building work valued at over $5,000 - including labour and materials - requires a contractor licence. For work valued at over $20,000, Home Building Compensation Fund cover is also required before work commences or a deposit is taken.

Can I check a builder's licence before requesting a quote in NSW?

Yes. The Service NSW licence check tool is publicly accessible and free to use at any stage of the engagement process, including before requesting a quote or entering into any preliminary discussions with a builder.

What if a builder's licence has recently expired?

An expired licence means the builder is not currently authorised to carry out regulated building work in NSW. Do not proceed until the builder confirms their licence has been renewed and the Service NSW register shows a current status.

Does a company licence cover all employees of that company in NSW?

In NSW, a contractor licence can be held by an individual or a company. Where a company holds the licence, the work must be carried out under the supervision of a nominated qualified supervisor who holds a current supervisor certificate. Always confirm both the company licence and the nominated supervisor certificate are current.

What should I do if I have a dispute with a builder in NSW?

If a dispute arises during or after construction, the first step is to attempt to resolve the matter directly with the builder in writing. If the dispute cannot be resolved, NSW Fair Trading offers a free dispute resolution service. For unresolved disputes, the NSW Civil and Administrative Tribunal (NCAT) hears home building matters.