Suspension and disqualification require checking the reason, dates, scope and reinstatement status. Suspension can be administrative, including for unpaid renewal fees, and does not always establish serious disciplinary misconduct.
What is builder suspension?
A builder suspension is a temporary regulatory action that prevents a licensed builder from exercising their licence rights for a defined period. During a suspension, the builder cannot legally enter into new building contracts, cannot legally commence new building work and cannot legally supervise building work under their licence.
Suspensions are typically imposed by the relevant state regulator as a consequence of specific regulatory breaches - accumulated demerit points in Queensland, non-compliance with directions to rectify defective work, failure to maintain required insurance, financial failure to meet the regulator's financial requirements or specific disciplinary findings. See our QBCC licence check guide for details on how the Queensland demerit point system works in practice.
A suspension has a defined start and end date. Once the suspension period ends, the licence is reinstated and the builder can operate again - unless the suspension is converted to a cancellation or the builder's licence expires during the suspension period.
What suspension means for homeowners
A builder who is currently suspended cannot legally take on your project. A builder who has previously been suspended has a documented history of regulatory non-compliance serious enough for the regulator to remove their operating rights for a period. Both are significant findings that warrant careful consideration before engaging.
What is builder disqualification?
Disqualification - sometimes called licence cancellation or deregistration depending on the state - is a more serious regulatory outcome than suspension. A disqualified builder has had their licence permanently or indefinitely removed and cannot legally operate as a licensed builder.
Disqualification can result from:
- Check the recorded decision, restrictions and effective dates with the regulator.
- Serious disciplinary findings involving fraud, misrepresentation or repeated non-compliance
- Insolvency or financial failure that results in licence cancellation - see our guide on what happens if a builder goes bankrupt in Australia
- Criminal convictions relevant to the building industry
- Repeated non-compliance with directions to rectify defective work
A person who has been disqualified from holding a builder's licence but continues to operate as a builder - taking on contracts, accepting deposits and supervising construction - is operating illegally. Confirming a builder's current insurance status is another essential check, covered in our guide on how to check if a builder has insurance in Australia. This is not uncommon in the Australian construction market, particularly through phoenix company structures where the same individuals operate under a new company name after their personal licence has been cancelled.
Suspension vs disqualification - the key differences
| Factor | Suspension | Disqualification or cancellation |
|---|---|---|
| Duration | Temporary - defined period | Indefinite, permanent or for a defined ban period |
| Effect on licence | Licence rights suspended - cannot contract or supervise | Licence cancelled - no longer a licensed builder |
| Can operate after? | Yes - once suspension period ends | Only if ban period ends and licence is reapplied for and granted |
| Severity | Serious - regulator has removed operating rights | Very serious - regulator has cancelled the licence |
| Common causes | Demerit point accumulation, non-compliance with directions to rectify, insurance failure | Serious disciplinary findings, fraud, repeated non-compliance, insolvency, excessive demerit points |
| Appears on register? | Yes - on the licence record | Yes - on the licence record and disciplinary register |
| Queensland specific | Check the applicable project and jurisdiction requirements | Check the applicable project and jurisdiction requirements |
| Victoria specific | BPC can suspend registration for non-compliance | BPC can cancel registration - appears on Compliance and Enforcement Register |
| NSW specific | NSW Fair Trading can suspend contractor licence | NSW Fair Trading can cancel contractor licence - appears on Service NSW record |
Where to check for suspension and disqualification by state
| State | Regulator | Where to search | What it shows |
|---|---|---|---|
| Queensland | QBCC | QBCC Licensee Register at qbcc.qld.gov.au | Current licence status - suspended or cancelled shown on main record. Demerit points, disciplinary actions and ban history also shown |
| New South Wales | NSW Fair Trading / Building Commission NSW | Service NSW licence check at service.nsw.gov.au | Licence status - suspended or cancelled. Cancellations, suspensions and public warnings all shown on the full record |
| Victoria | Building and Plumbing Commission (BPC) | Find a Practitioner at vba.vic.gov.au AND Compliance and Enforcement Register at vba.vic.gov.au - two separate searches | Check the recorded decision, restrictions and effective dates with the regulator. |
| Western Australia | Building and Energy WA | Contractor register at buildingcommission.wa.gov.au | Current registration status - suspended or cancelled shown on register |
| South Australia | Consumer and Business Services | Licence search at cbs.sa.gov.au | Current licence status - suspended or cancelled |
| ACT | Access Canberra | Licence search at accesscanberra.act.gov.au | Current licence status |
| Tasmania | Consumer Building and Occupational Services | Licence search at cbos.tas.gov.au | Current licence status |
How to search - what to look for in each state
Queensland - the most detailed public record
The QBCC Licensee Register is the most comprehensive publicly accessible builder record in Australia. A suspended licence shows status as Suspended rather than Current. A cancelled licence shows as Cancelled or Expired.
Beyond current status, click through to the full QBCC record and review:
- Demerit points - any accumulation toward the 30-point ban threshold
- Disciplinary actions - formal proceedings that may have resulted in or preceded suspension
- History of previous suspensions - a builder whose licence was previously suspended and has been reinstated has a documented history of serious non-compliance
In Queensland, the demerit point system is the primary mechanism for suspension and disqualification. A builder who has accumulated 30 demerit points over three years has been banned for three years. If they are now operating under a new licence, their demerit point history before the ban remains relevant context.
Also search QCAT decisions at queenslandjudgments.com.au - tribunal decisions involving non-compliance with orders or serious defect findings may precede or accompany suspension. For more on lodging and tracking a complaint, see our guide on builder complaints and disputes in Australia.
New South Wales
The Service NSW licence check shows current licence status including any suspension or cancellation. The full record also shows:
- Past cancellations under the Home Building Act 1989 or Fair Trading Act 1987
- Public warnings issued under section 23 of the Home Building Act - these are serious findings published about specific builders
- Non-compliance with NCAT orders - which can lead to licence suspension
Also search NCAT decisions at ncat.nsw.gov.au for tribunal decisions involving the builder. A pattern of NCAT findings against a builder - particularly involving non-compliance with orders - may precede or accompany licence action.
Victoria
Victoria requires two separate searches. The BPC practitioner search confirms current registration status. Search for the builder's name - if the registration is suspended or cancelled it will show on the record.
The practitioner directory alone does not show the full disciplinary history.
The phoenix company problem
Suspension and disqualification records are attached to individual licences and the entities that hold them. They do not automatically follow a disqualified builder who sets up a new company under a different name with different directors - a practice known as phoenixing.
A builder who has been disqualified from holding a QBCC licence may:
- Set up a new company with a family member or associate as the nominal director
- Continue to operate the business - making decisions, supervising work and accepting contracts - while the nominal director holds the licence
- Present as a legitimately licensed builder while the disqualified individual remains in effective control
This is illegal but not uncommon. Detecting it requires cross-referencing the builder's company history through ASIC with the licence record through the state regulator.
How to identify potential phoenix structures
- Search the builder's company directors through ASIC Connect at connectonline.asic.gov.au
- Search each director's name on the relevant state licence register - confirm each director's individual licence status
- Search ASIC Published Notices at publishednotices.asic.gov.au for insolvency notices against the company or any related entities
- Check whether any director has been involved in previous construction companies that were wound up - search company names associated with each director through ASIC
See the companion guide How to Check a Builder's ABN and Company History Australia for the complete ASIC search process.
What to do if you find a suspension or disqualification record
If the licence is currently suspended - do not engage the builder. A suspended builder cannot legally contract for building work. There is no legitimate reason to proceed with a currently suspended builder regardless of any explanation they offer
If the licence has been cancelled or the builder is disqualified - do not engage. A disqualified builder cannot legally operate as a principal contractor
If the licence shows a previous suspension now lifted - research the specific circumstances. Contact the relevant state regulator to understand what conduct led to the suspension, what the duration was and whether the builder has had any further regulatory issues since reinstatement
If the disciplinary register shows a suspension proceeding but current status appears active - confirm the current status directly with the regulator by phone. Registers can have update lags
Search ASIC for the company and director history - confirm no phoenix structure involving the disqualified individual
If you have already signed a contract with a builder who is subsequently found to be suspended or disqualified - seek legal advice immediately. The contract may be unenforceable and you may have grounds to terminate without penalty
If you have paid a deposit to a suspended or disqualified builder - seek legal advice and contact the relevant state regulator immediately. Home warranty insurance may not apply if the builder was not licensed at the time of contracting
Red flags
BUILTLY and builder verification
BUILTLY is building a record of completed Australian homes that credits the builder, architects, designers and trades behind each one.
Frequently asked questions
How do I check if a builder has been suspended or disqualified in Australia?
Use the relevant state licence or registration register and check the recorded status, conditions and disciplinary decisions. Some detailed extracts may attract fees.
What is the difference between a suspended and a disqualified builder in Australia?
Suspension and disqualification require checking the reason, dates, scope and reinstatement status. Suspension can be administrative, including for unpaid renewal fees, and does not always establish serious disciplinary misconduct.
Can a disqualified builder still operate through a new company in Australia?
Illegally - yes, and it happens. A disqualified builder may set up a new company with a family member or associate as the nominal licence holder while continuing to effectively control the business. This is known as a phoenix company structure. Detecting it requires cross-referencing the builder's company director history through ASIC with the licence record through the state regulator. Search each company director's name on the state licence register and search ASIC for the company's full registration and director history. See the companion guide How to Check a Builder's ABN and Company History Australia for the complete ASIC search process.
What should I do if I discover my builder's licence is suspended after signing a contract?
Seek legal advice immediately. A contract with a suspended builder may be unenforceable under the relevant state building legislation. Depending on the state and the specific circumstances, you may have grounds to terminate the contract without penalty. Contact the relevant state regulator - QBCC, NSW Fair Trading, BPC or Building and Energy WA - to confirm the builder's current status and report the situation. If you have paid a deposit, home warranty insurance may not apply if the builder was not licensed at the time of contracting - confirm this with the insurer directly.
How long do suspension and disqualification records stay on builder registers in Australia?
This varies by state and by the type of record. In Queensland, demerit points and infringement notices remain on the QBCC record for five years. Formal disciplinary actions remain on the register for longer. In Victoria, entries on the Compliance and Enforcement Register remain for five years after they are imposed or cease to have effect. In NSW, cancellations and suspensions under the Home Building Act remain on the Service NSW record. Always search the full disciplinary record - not just current licence status - to identify historical suspension and disqualification events that may no longer show as active but remain relevant to the builder's regulatory history.