Advice

How to Check if a Builder Has Insurance in Australia: A Complete Guide

Before signing a building contract, paying a deposit or allowing work to commence on your home, verifying that your builder holds the correct insurance is one of the most important steps you can take. Uninsured building work leaves you exposed to financial loss if the builder becomes insolvent, abandons the project, causes damage to a third party or injures a worker on your property. This guide explains the different types of builder insurance in Australia, how to verify each one and where to check - state by state. Insurance checks are one part of a wider process - see the complete guide to building a house in Australia for how this fits into the whole build sequence.

Last updated: October 2026

What insurance does a builder need in Australia?

There are four main types of insurance relevant to residential building work in Australia:

  1. Home warranty insurance (also called home building compensation or domestic building insurance depending on the state) - mandatory for most residential building contracts above a set value threshold. Protects homeowners if the builder fails to complete the work, becomes insolvent, dies or disappears.
  2. Public liability insurance - covers the builder for damage caused to third parties or third-party property during the course of construction. Minimum $5 million is standard for residential builders. Not typically publicly searchable - verified by requesting a certificate of currency from the builder.
  3. Workers compensation insurance - covers workers who are injured on site during construction. Mandatory for all builders with employees. Not typically publicly searchable - verified by requesting a certificate of currency.
  4. Contract works insurance - covers the building works themselves against damage or loss during construction (fire, storm, theft). Not universally mandatory but standard practice for reputable builders. Verified by requesting a certificate of currency.

Of these four, home warranty insurance is the one homeowners can verify independently through state-based public search tools. The others require the builder to provide documentation directly.

Home warranty insurance - what it is and why it matters

Home warranty insurance is the consumer protection safety net for residential building work in Australia. It is funded by premiums paid by the licensed builder on behalf of the homeowner and attaches to the property - meaning it remains valid even if the property is sold during the coverage period.

Home warranty insurance pays out when:

  • The builder fails to complete the contracted work
  • The builder becomes insolvent, dies, disappears or loses their licence
  • The builder fails to rectify defects and a tribunal order is not complied with (in some states)

It is not a substitute for good builder selection - it is a last resort when things go badly wrong. Coverage limits and conditions vary significantly by state. For more on what happens when a builder becomes insolvent, see our guide on what happens if your builder goes bankrupt.

Home warranty insurance by state - what applies where

Home warranty scheme names, thresholds, cover periods and claim triggers vary by state and contract date. See home warranty insurance in Australia for the state-by-state detail, including Victoria’s Home Warranty and legacy DBI distinction.

How to check home warranty insurance - state by state

Queensland - QBCC insurance search

Queensland has the most consumer-friendly home warranty insurance verification system in Australia. The QBCC provides a free public insurance search tool that allows homeowners, prospective buyers and their legal representatives to confirm whether a residential property is covered by home warranty insurance.

How to check:

  1. Go to the QBCC website at qbcc.qld.gov.au
  2. Navigate to Home Warranty Scheme - Insurance Search
  3. Enter the property address or lot details
  4. The search confirms whether a current policy exists and provides basic coverage information

The Queensland Home Warranty Scheme covers residential building work valued over $3,300 including materials, labour and GST. Coverage lasts for 6 years and 6 months from the contract date or when the premium is paid, whichever is earliest. Maximum coverage is $200,000 per claim.

Your builder is legally required to take out home warranty insurance before requesting a deposit. If your builder requests a deposit for work valued over $3,300 without first arranging insurance, they are in breach of their QBCC obligations.

New South Wales - HBC Check

NSW uses a Home Building Compensation (HBC) scheme administered by the State Insurance Regulatory Authority (SIRA) through icare. The HBC Check tool allows homeowners and buyers to verify whether a property has home building compensation cover.

How to check:

  1. Go to the SIRA website at sira.nsw.gov.au
  2. Navigate to Home Building Compensation - HBC Check
  3. Search by property address
  4. The tool confirms coverage status and basic policy details

NSW uses Home Building Compensation cover. See home warranty insurance in Australia for the threshold, cover periods and claim conditions.

Victoria

Victoria’s applicable cover depends on the contract date and whether Home Warranty or legacy DBI applies. Request the Notice of Cover or policy certificate and confirm missing documentation with the BPC; see home warranty insurance in Australia for scheme details.

What to request from a Victorian builder:

  • The Home Warranty Notice of Cover or legacy DBI certificate confirming the property address, contract value and coverage period
  • Confirmation of the applicable scheme and premium payment timing; for legacy DBI, the policy and certificate before paying a deposit

BPC Home Warranty applies to eligible new contracts signed on or after 1 July 2026 for work over $20,000. It may cover major defects for up to 6 years and other defects or non-compliant work for up to 2 years after completion. Legacy DBI continues under its policy terms. Home Warranty may assist where a builder is unable or unwilling to complete or fix eligible incomplete, defective or non-compliant work, subject to eligibility, limits and exclusions. Legacy DBI remains subject to its own claim triggers; the change of administrator does not change those policy terms. For more on checking a builder's licence in Victoria, see our guide on how to check a builder's licence in Victoria.

Western Australia

Western Australia's Home Indemnity Insurance scheme operates through private insurers approved by the Building Commission WA. There is no public search tool. Homeowners must verify cover directly with the builder.

WA requires home indemnity insurance for residential contracts over $20,000. Request a copy of the Home Indemnity Insurance certificate and confirm the policy was issued before any deposit was requested.

South Australia, ACT, Northern Territory

These states and territories operate home warranty insurance through private insurers with a minimum contract value threshold of $12,000. There are no public search tools. Homeowners must request a copy of the insurance certificate directly from the builder before paying any deposit.

Tasmania

Tasmania does not have a state-mandated home warranty insurance scheme. Homeowners in Tasmania should:

  • Place greater emphasis on thorough builder licence verification
  • Use a detailed building contract with strong defect and dispute provisions
  • Consider whether the builder carries voluntary insurance products that provide similar protection
  • Engage a solicitor to review the building contract before signing

How to verify public liability insurance

Public liability insurance is not publicly searchable in any Australian state. The only way to verify it is to request a certificate of currency directly from the builder.

What is a certificate of currency?

A certificate of currency is a document issued by an insurance company confirming that a specific policy is current and active. It shows the policy holder's name, the type of cover, the coverage amount and the policy expiry date. It is the standard verification document used across the construction industry.

A reputable builder will provide a certificate of currency for their public liability insurance on request and without hesitation. If a builder is reluctant to provide this document, treat it as a significant warning sign. For more on identifying dodgy builders, see our dedicated guide.

What to check on a public liability certificate of currency:

  • The policy holder's name matches the builder's business name and ABN
  • The coverage amount is at least $5 million - $10 million or $20 million is preferable
  • The policy expiry date is current - not lapsed
  • The insuring company is a recognised Australian insurer

You can verify that the insurance company is authorised to operate in Australia by checking ASIC's Financial Services Register at search.asic.gov.au.

How to verify workers compensation insurance

Workers compensation insurance is mandatory for all builders with employees in Australia. Like public liability, it is not publicly searchable in most states. Request a certificate of currency from the builder.

In NSW, icare provides an Employer Lookup tool at icare.nsw.gov.au that allows basic confirmation of whether a business holds current workers compensation cover. This is a quick check but does not show policy details.

Important: Workers on your site who are injured without the builder holding valid workers compensation insurance can potentially pursue a claim against you as the property owner in some circumstances. This is a serious exposure that makes verification important.

The four checks to make before signing a building contract

Before signing any building contract or paying a deposit, complete these four insurance and licence checks. For a comprehensive pre-contract process, see our guide on how to vet a builder in Australia.

Licence check - verify the builder's current licence status directly with the relevant state licensing authority. In Queensland use the QBCC licence search. In NSW use the NSW Fair Trading licence check. In Victoria use the Building and Plumbing Commission (BPC) practitioner search

Home warranty insurance check - in Queensland use the QBCC insurance search. In NSW use the HBC Check. In other states request a copy of the insurance certificate from the builder before paying any deposit

Public liability certificate of currency - request this directly from the builder. Confirm minimum $5 million coverage, current expiry date and that the insurer is ASIC-authorised

Workers compensation certificate of currency - request this directly from the builder. In NSW you can also use the icare Employer Lookup for a quick basic confirmation

Do not pay a deposit until you have confirmed home warranty insurance is in place. In Queensland and NSW the builder is legally prohibited from requesting a deposit before home warranty insurance has been arranged.

When home warranty insurance does NOT apply

Understanding the limits of home warranty insurance is as important as knowing how to check for it.

Home warranty insurance typically does not cover:

  • Buildings of more than three storeys above a car park (apartment buildings above the threshold are not covered under residential schemes)
  • Commercial building work
  • Work carried out by an unlicensed contractor
  • Cosmetic defects or general workmanship issues that do not constitute a major structural defect
  • Loss of rent or consequential losses in most states
  • Projects in Tasmania (no scheme exists)

Many home warranty policies require a specified trigger such as insolvency, death, disappearance or failure to comply with a tribunal order. Victorian BPC Home Warranty for eligible new contracts from 1 July 2026 may also assist where the builder is unable or unwilling to complete or fix eligible work; legacy DBI retains its existing triggers. It does not operate as a general defect liability scheme. The builder's statutory warranty obligations and the building contract's defect provisions are your primary protection during the construction period and the defects liability period. Whether insurance is last-resort cover depends on the applicable scheme and policy.

How BUILTLY helps

BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.

Frequently asked questions

How do I check if a builder has home warranty insurance in Australia?

In Queensland, use the free QBCC insurance search tool at qbcc.qld.gov.au to confirm whether a property has active home warranty insurance. In NSW, use the HBC Check tool at sira.nsw.gov.au. In Victoria, Western Australia, South Australia, ACT and the Northern Territory, there are no public search tools - request a copy of the insurance certificate directly from the builder before paying any deposit. Tasmania does not have a mandatory home warranty insurance scheme.

Can a builder ask for a deposit before taking out home warranty insurance?

No. In Queensland and NSW, builders are legally prohibited from requesting a deposit for residential building work above the threshold value before home warranty insurance has been arranged. In Queensland the threshold is $3,300 and in NSW it is $20,000. If a builder requests a deposit before providing evidence of home warranty insurance, this is a serious warning sign and a potential breach of their licensing obligations.

What is a certificate of currency and how do I get one from a builder?

A certificate of currency is a document issued by an insurance company confirming that a specific insurance policy is current and active. It shows the policy holder's name, coverage type, coverage amount and expiry date. To verify a builder's public liability or workers compensation insurance, ask the builder directly for a certificate of currency for each policy. A reputable builder will provide this without hesitation. If the builder is reluctant, treat it as a warning sign.

What is the difference between home warranty insurance and public liability insurance for builders?

Home warranty insurance protects the homeowner if the builder fails to complete the work, becomes insolvent, dies or disappears. It is mandatory for most residential contracts above a threshold value and is arranged by the builder on behalf of the homeowner. Public liability insurance covers the builder for damage or injury caused to third parties during construction. It protects you if the builder damages a neighbouring property or a visitor is injured on site during construction. Both are required - they cover different risks.

What happens if my builder has no insurance?

If a builder has no home warranty insurance for work that requires it, the homeowner has no safety net if the builder becomes insolvent or abandons the project. If the builder has no public liability insurance and causes damage to a neighbouring property, you may face exposure. If the builder has no workers compensation insurance and a worker is injured on site, there is potential exposure to the property owner in some circumstances. Never allow work to commence without first confirming that all required insurance is in place.