Before engaging a builder for any residential or commercial construction project in Victoria, verifying that they hold a current registration is one of the most important steps you can take. In Victoria, building practitioners including builders, building designers and building surveyors are regulated by the Building and Plumbing Commission (BPC), which replaced the Victorian Building Authority on 1 July 2025 and maintains the public register of registered building practitioners in the state.
Checking a builder's registration in Victoria takes only a few minutes and confirms that the person or company you are engaging is legally authorised to carry out building work, holds the appropriate registration category for your project, and is in good standing with the state's building regulator.
This guide explains how to check a builder's registration in Victoria, what the BPC register shows, what different registration categories mean, and what to do if a builder cannot be verified. If you have seen older references to "VBA registration", builders should now be verified through the BPC register.
Search the Building and Plumbing Commission register
From 1 July 2025, the Building and Plumbing Commission (BPC) replaced the VBA as Victoria's building regulator. The practitioner register is still hosted on the VBA website during the BPC transition period.
Open Find a Practitioner SearchVerified Victorian builders coming soon
Be notified when verified builder profiles launch in Victoria. Real projects, full project teams.
Join WaitlistWhat is the BPC and why does it matter?
The Building and Plumbing Commission (BPC) is the state government body responsible for regulating Victoria's building and plumbing industries. It replaced the Victorian Building Authority (VBA) on 1 July 2025 and inherited the practitioner register, complaints handling and disciplinary functions. The BPC registers building practitioners, investigates complaints, takes disciplinary action against practitioners who breach the Building Act 1993, and sets minimum standards for building work carried out in Victoria.
In Victoria, the term used is registration rather than licence - building practitioners must hold a current BPC registration to legally carry out or oversee regulated building work. Engaging an unregistered builder in Victoria exposes homeowners and developers to significant risk, including limited legal recourse if something goes wrong and potential loss of access to domestic building insurance protections.
How to check a builder's registration in Victoria.
The BPC practitioner register is free and publicly accessible online. Use the BPC practitioner search to find a registered building practitioner.
Step-by-step process
- Visit the BPC website and use the practitioner search
- Navigate to the practitioner search tool - found under the "Find a Practitioner" or "Check a Registration" section
- Enter the builder's name, company name or registration number
- Review the results to confirm registration status, category and any conditions or restrictions
The search can be conducted using an individual's name, a company or business name, or a BPC registration number if the builder has provided one. For a national overview of how to verify builders in other states, see the BUILTLY guide on how to check a builder's licence in Australia.
What the BPC register shows.
The BPC practitioner register provides the following information for each registered building practitioner:
Always confirm that the registration is current and that the registration category covers the type of work you are commissioning.
BPC registration categories explained.
The BPC registers building practitioners across several categories (the same framework inherited from the former VBA). The most relevant categories for residential construction in Victoria include:
Domestic Builder - Unlimited
Domestic Builder - Unlimited authorises domestic building work within the scope and conditions of the registration. This is the registration category held by builders delivering custom homes, luxury residential projects and complex renovations.
Domestic Builder - Limited
Authorises the holder to carry out specific classes of domestic building work as defined by the conditions of their registration. Limited registrations are issued for specific work types such as additions, alterations or specific construction methods.
Domestic Builder - Manager
Authorises the holder to manage and arrange domestic building work but not to carry out the physical work themselves. A builder registered in this category contracts out all physical work to other registered practitioners.
Commercial Builder
Authorises the holder to carry out commercial building work. Commercial builder registrations are categorised by the class of building and the value of work the practitioner is authorised to undertake.
Building Practitioner - Other Categories
The BPC also registers building designers, building surveyors, engineers and other building practitioners. These registrations are separate from builder registrations and cover different scopes of work.
For residential construction projects in Victoria, confirm that your builder holds a current registration whose category and conditions cover the proposed work. Domestic Builder - Unlimited is not a universal minimum.
Domestic building insurance in Victoria.
One of the key protections available to homeowners commissioning residential building work in Victoria is Domestic Building Insurance (DBI). From 1 July 2026 the new Victorian Home Warranty scheme, administered by the BPC, applies to eligible contracts over $20,000. Legacy Domestic Building Insurance (DBI) continues for earlier contracts. Check which scheme applies to your contract.
Home warranty cover under the new scheme or legacy DBI can provide cover for homeowners in the event that a builder:
- Fails to complete the work
- Carries out defective work covered by the applicable scheme and claim conditions
- Becomes insolvent, dies or disappears
For DBI to apply, the builder must hold a current BPC registration at the time the contract is signed and the insurance is obtained. Engaging an unregistered builder means this protection does not apply.
Before signing a contract, confirm that your builder has obtained DBI for your project and request a copy of the certificate of insurance. For more detail on builder insurance protections, refer to the BUILTLY guide on builder warranties in Australia.
Owner builder registration in Victoria.
In Victoria, owner builders - individuals who carry out or arrange domestic building work on their own property without engaging a registered builder - must obtain an owner builder certificate of consent from the BPC for projects valued above $20,000.
Owner builder registration has specific requirements and limitations in Victoria, including restrictions on the frequency with which an owner builder certificate can be obtained and requirements for disclosure when selling a property where owner builder work was carried out within a defined period.
For more detail on the differences between owner builder and licensed builder arrangements, refer to the BUILTLY guide on owner builder vs licensed builder.
What to do if a builder cannot be verified.
If a builder's registration cannot be found on the BPC register, or if the registration is shown as suspended, cancelled or expired, do not proceed with the engagement until the issue is resolved.
Steps to take if verification fails
- Ask the builder directly - request their BPC registration number and search again using that number specifically
- Contact the BPC - call or email the Building and Plumbing Commission directly to verify the builder's status if the online search does not return a clear result
- Do not sign a contract - avoid entering into a building contract until registration status is confirmed
- Do not pay a deposit - never pay a deposit before confirming that the builder is registered and that DBI has been obtained for your project
- Seek an alternative builder - if a builder is unable or unwilling to provide verifiable registration details, this is a significant red flag
For further guidance on evaluating builders, refer to the BUILTLY guide on red flags to watch for when choosing a builder.
Warning signs when checking a Victorian builder.
Treat any of the following as cause to pause engagement until the registration position is clarified in writing.
- Builder cannot be found on the BPC register or claims registration is pending
- Registration shows as suspended, cancelled or expired but builder still solicits work
- Registration category does not match the type or scale of work proposed
- Builder claims to be VBA registered without acknowledging the BPC transition
- Refusal to provide a BPC registration number in writing on quotes or contracts
- Domestic builder cannot confirm applicable Home Warranty or legacy DBI cover before deposit
- Pressure to sign or pay a deposit before BPC verification can be completed
- Company is registered but the nominated supervisor on your project is not
- Recent BPC registration paired with claims of long industry experience and no project history
- Sub-contract chain is unclear about which registered builder is actually responsible
Checking for complaints and disciplinary action in Victoria.
In addition to verifying registration status, it is worth checking whether a builder has been subject to complaints or disciplinary action through the BPC (or through the former VBA prior to 1 July 2025). The BPC publishes information about disciplinary outcomes including registration suspensions, cancellations and civil penalty orders issued against building practitioners.
This information can be accessed through the BPC Compliance and Enforcement Register and provides additional context when evaluating a builder's track record and professional conduct history. For a comprehensive overview, see the BUILTLY guide on builder complaints and disputes in Australia.
If you are planning to research a builder before signing a contract, checking the complaints register is a valuable step in the due diligence process.
Key differences between Victoria and other states.
Building regulation in Australia is administered at the state and territory level, meaning the registration framework, terminology and processes differ between jurisdictions. The most important distinctions for Victorian homeowners and developers to be aware of are:
- Victoria uses the term registration rather than licence - the BPC (which replaced the VBA on 1 July 2025) registers building practitioners rather than licensing them
- Victorian Home Warranty for eligible contracts over $20,000 from 1 July 2026 is administered by the BPC, with legacy DBI continuing for earlier contracts
- The BPC registers individual practitioners as well as companies - always confirm the registration of the individual who will be supervising your project, not only the company name
- Victoria's Domestic Building Contracts Act 1995 governs residential building contracts and sets out specific requirements for contract content, deposit limits and progress payment structures
For a national overview of builder licence and registration requirements across all states and territories, refer to the BUILTLY guide on how to check a builder's licence in Australia. For state-specific requirements, see the guides on the QBCC licence check in Queensland and how to check a builder's licence in NSW.
Registration verification checklist.
Before engaging a builder in Victoria, confirm the following:
Builder's BPC registration is current and not expired
Registration category covers the type and scale of work required
No active suspensions or conditions restrict the scope of work
Builder has obtained Home Warranty or legacy DBI cover where required for your project
Applicable Home Warranty or legacy DBI cover has been confirmed before any deposit is paid
Registration is held by the individual or company entering the contract
Registration number matches the details provided by the builder
BUILTLY and lasting project records
BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
For the full step-by-step on commissioning a new build in Australia, see the BUILTLY complete guide to building a house in Australia.
Frequently asked questions.
Is it illegal to carry out domestic building work without BPC registration in Victoria?
Yes. Carrying out or managing domestic building work above the prescribed threshold without holding a current Building and Plumbing Commission (BPC) registration is illegal in Victoria and can result in significant penalties. Homeowners who engage unregistered builders may also lose access to Domestic Building Insurance protections.
Can I check a builder's registration before requesting a quote?
Yes. The BPC practitioner register is publicly accessible and free to use at any stage of the engagement process, including before requesting a quote or entering into any preliminary discussions.
What if a builder's registration expired recently?
An expired registration means the builder is not currently authorised to carry out regulated building work in Victoria. Do not proceed until the builder confirms their registration has been renewed and the BPC register shows a current status.
Does a company registration cover all employees of that company?
No. In Victoria, individual building practitioners must hold their own BPC registration. A company may hold a registration, but the individual supervising the work on your project should also hold a current and appropriate registration. Confirm both the company and the nominated site supervisor are registered.
What is the deposit limit for residential building contracts in Victoria?
Under the Domestic Building Contracts Act 1995, the maximum deposit a builder can charge before commencing work is five percent of the contract price for contracts over $20,000. Confirm your contract complies with this requirement and never pay a deposit before applicable Home Warranty or legacy DBI cover has been obtained and the certificate provided to you.