The period between finding a builder you are interested in and signing a building contract is the most important window in the entire construction process. Once the contract is signed, your options narrow significantly. Before signing, you have full freedom to investigate, verify, compare and walk away. This guide covers exactly what research to complete in that window - credential verification, company history checks, reference calls, contract review and insurance confirmation - so that when you sign, you do so with confidence based on evidence rather than optimism.
Why pre-signing research matters.
Most construction disputes, cost overruns and builder insolvency events are not unpredictable. The warning signs - a recent company registration despite claims of long experience, a pattern of demerit points or disciplinary actions on the licence register, directors involved in previous company failures, requests for deposits exceeding the legal maximum - are almost always visible in publicly available records before the contract is signed.
The problem is that most homeowners do not look. The sales and presentation process is polished. The display home is impressive. The quote is competitive. By the time the contract is presented, the emotional momentum toward signing is strong. The pre-signing research window is the last opportunity to apply objective scrutiny to a decision that will involve hundreds of thousands of dollars and one to two years of your life.
The research steps in this guide take a total of three to five hours across two to three days. No step requires professional help or cost. All the registers used are free and publicly accessible. The potential cost of skipping them is enormous.
Step 1 - Verify the licence.
The licence check is the baseline - it confirms the builder is legally authorised to contract for building work in your state. But the licence register shows more than current status in most states. Read the full record.
Queensland - QBCC Licensee Register at qbcc.qld.gov.au
Search by name, company name or QBCC licence number. Click through to the full record and check:
- Licence status - must be current
- Licence class - confirm it covers your project type
- Financial category - limits the maximum annual value of work. Confirm it is appropriate for your project value
- Demerit points - confirm none or assess the pattern if any exist
- Infringement notices - check for recent notices
- Directions to rectify - check whether any are marked as not complied
- Disciplinary actions - check for formal proceedings
New South Wales - Service NSW at service.nsw.gov.au
Search for the contractor licence. Check:
- Licence type - contractor licence, not just a supervisor certificate
- Licence status - current, not suspended or cancelled
- Any conditions, cautions, penalty notices or suspensions
For the complete NSW licence check process, see the detailed guide on how to check a builder's licence in NSW.
Victoria - Building and Plumbing Commission (BPC) register at vba.vic.gov.au
The Building and Plumbing Commission (BPC) replaced the VBA on 1 July 2025. At vba.vic.gov.au, search both Find a Practitioner and the separate Compliance and Enforcement Register.
Other states
Building and Energy in WA at buildingcommission.wa.gov.au, CBS in SA at cbs.sa.gov.au, Access Canberra in the ACT.
See the companion guide How to Check a Builder's Licence in Australia for the complete state-by-state process.
Step 2 - Check company history through ASIC.
If the builder operates as a company - a Pty Ltd entity - this step is essential. The ASIC company search reveals information about the builder's corporate history that the licence register does not show.
Australian Business Register - abr.business.gov.au
Search the builder's ABN. Confirm:
- ABN status is Active - cancelled means the entity cannot legally trade
- Entity type matches what the builder has told you
- ABN registration date - a recently registered company claiming decades of experience is a red flag
ASIC Connect - connectonline.asic.gov.au
Search the company name or ACN. Review:
- Company status - must show Registered
- Current directors - note all director names
- Date of registration - compare against claimed experience
- Any appointment of administrators or liquidators
ASIC Published Notices - publishednotices.asic.gov.au
Search the company name, ACN and each director name. Look for:
- Winding-up applications or orders
- Administration appointments
- Liquidation proceedings
- Related entity notices involving the same directors
A director who has been involved in multiple previous construction company failures is a material risk regardless of the current company's apparent stability.
See the companion guide How to Check a Builder's ABN and Company History Australia for the complete process including phoenixing warning signs.
Step 3 - Confirm insurance.
Home warranty insurance - called the Home Warranty Scheme in Queensland, the Home Building Compensation Fund in NSW and Domestic Building Insurance in Victoria - must be in place before any deposit is paid. This is not negotiable.
What to confirm
- The builder is eligible for home warranty insurance in your state - eligibility is assessed by the insurer or regulator and builders who are not financially viable cannot obtain it
- A certificate of insurance will be provided before any deposit is paid - not after
- The certificate covers your specific project, address and contract value
How to verify
Do not accept a certificate provided by the builder without verifying it directly with the insurer. In Queensland contact QBCC, in NSW contact icare, in Victoria contact the BPC.
A builder who cannot obtain home warranty insurance eligibility is a builder the insurer has assessed as financially unviable. This is the most serious single warning sign available at the pre-signing stage.
See the companion guide How to Check if a Builder Has Insurance Australia.
Step 4 - Call references directly.
Reference calls are the most consistently underinvested part of pre-signing research. Ask the builder for direct contact details for at least two clients from comparable projects completed within the past 18 months. Call them - do not accept written references as a substitute. See also our guide to questions to ask about the team before signing.
What to ask
- Did the builder deliver the project within the quoted price? If not, what drove the cost increase?
- Did the builder deliver the project within the quoted programme? If not, what caused the delay?
- How did the builder communicate during construction - proactively or reactively?
- Were defects identified during the defects liability period addressed promptly?
- Was there anything about the experience you wish you had known before signing?
- Would you engage this builder again?
Also call the architect
If the project is architect-designed, call the architect credited on reference projects. Ask specifically:
- How did the builder manage the construction documentation?
- Were material substitutions made without architect approval?
- Would you specify this builder on a future project?
Step 5 - Visit completed projects.
Ask the builder for the addresses of at least two comparable completed projects and visit them in person before signing. This is not optional for any project of significant value.
What to look at during the visit
- External detail - cladding junctions, window reveals, external flashings, gutter connections
- Internal joinery - door and drawer gap consistency, hardware quality, reveal precision
- Wet areas - tile alignment, grout joint consistency, waterproofing at junctions
- Window and door operation - smooth function, weatherstripping quality
- Overall finish consistency - paintwork, skirting boards, ceiling finish
The detail work is where construction quality is actually visible and where the difference between a capable builder and an excellent one becomes plain.
See How to Evaluate a Builder's Past Projects for a detailed framework.
Step 6 - Review the contract.
Do not sign a building contract you have not read in full and do not understand. For contracts above $100,000, engaging a construction lawyer to review the contract before signing is strongly recommended. See What Is a Building Contract in Australia for a detailed guide.
What to look for when reviewing the contract
The contract price matches the quoted figure and all inclusions are documented - no verbal inclusions
All provisional sums and prime cost items are identified and based on current market pricing - not optimistic allowances
The payment schedule ties progress payments to defined and verifiable construction milestones - not dates or the builder's requests
The deposit does not exceed the legal maximum in your state - 10 percent in most states, 6.5 percent in WA
The contract includes a baseline construction programme with a defined practical completion date
The variation procedure is clearly documented - how variations are initiated, priced and approved
Liquidated damages provisions are included for builder-caused delay
The defects liability period and process are clearly defined
Home warranty insurance is confirmed as a condition of the contract
The builder's licence number and entity details are correctly stated
There is an order of precedence clause defining which document takes priority in case of contradiction
What is not negotiable
The deposit amount. The home warranty insurance requirement. The progress payment structure tied to milestones. These are legal minimums in most states - any contract that varies them in the builder's favour should be reviewed by a construction lawyer before signing.
Step 7 - Confirm the deposit and payment structure.
Confirm the deposit amount before signing. The legal maximum deposit in most Australian states is:
- Queensland: no specific cap - confirm with QBCC, but $1,000 is typical for project homes
- New South Wales: 10 percent of contract price for contracts above $20,000
- Victoria: no statutory cap but confirm the deposit is reasonable and that DBI is in place first
- Western Australia: 6.5 percent of contract price for contracts above $7,500
- South Australia: 5 percent of contract price
Never pay a deposit before the home warranty insurance certificate is provided. A builder who requests a deposit before providing the certificate is either unaware of the legal requirement or is seeking to collect money before their insurance status is clarified. Neither is acceptable.
Pre-signing research checklist.
Licence verified through the relevant state register - full record reviewed, not just current status
Victoria: both practitioner directory and Compliance and Enforcement Register searched
ABN confirmed active on the Australian Business Register
ASIC Connect searched for company registration history and director details
ASIC Published Notices searched for insolvency notices against company and directors
Home warranty insurance eligibility confirmed - certificate to be provided before deposit
Direct reference calls completed with at least two clients from comparable recent projects
Architect or building designer from at least one reference project called
At least two comparable completed projects visited in person
Building contract read in full - all inclusions, provisional sums, payment schedule and variation procedure reviewed
Deposit amount confirmed within the legal maximum for your state
Construction lawyer engaged to review the contract if the value warrants it
All verbal promises confirmed in writing - either in the contract or as a written amendment
Red flags that should delay or prevent signing.
BUILTLY and pre-signing research.
BUILTLY is building a record of completed Australian homes that credits the builder, architects, designers and trades behind each one.
BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
For a broader framework, see How to Choose a Builder for Your Home and Building a House Checklist Australia. For a structured shortlisting framework before requesting quotes, see How to Shortlist Builders in Australia: A Complete Framework. To compare pricing across multiple builders, see How to Compare Quotes From Builders in Australia. For understanding warranty protections after construction, see Builder Warranties Australia. For stage inspection requirements, see Building Inspections Australia.
Frequently asked questions.
What should I check before signing a building contract in Australia?
Complete seven steps before signing any building contract: verify the builder's licence through the relevant state register and read the full record - not just current status. Check the builder's ABN and company history through ASIC Connect and ASIC Published Notices. Confirm home warranty insurance eligibility and that a certificate will be provided before deposit. Call direct references from recent comparable projects. Visit comparable completed projects in person. Read the building contract in full and confirm deposit amounts are within the legal maximum. Engage a construction lawyer to review the contract for any project of significant value.
How do I check if a builder is licensed in Australia?
Each state has its own licensing authority and register. In Queensland search the QBCC Licensee Register at qbcc.qld.gov.au. In NSW use the Service NSW licence check. In Victoria use the Find a Practitioner directory at vba.vic.gov.au - Victoria's regulator is now the BPC as of 1 July 2025, also search the Compliance and Enforcement Register separately. In WA use the Building and Energy contractor register. See the companion guide How to Check a Builder's Licence in Australia for the complete state-by-state process.
What is home warranty insurance and why must it be confirmed before signing?
Home warranty insurance - the Home Warranty Scheme in Queensland, the Home Building Compensation Fund in NSW and Domestic Building Insurance in Victoria - protects homeowners if the builder becomes insolvent, dies or disappears before completing the work. It is mandatory above defined thresholds in most states. A builder must obtain it before the contract is executed and before any deposit is paid. A builder who cannot obtain home warranty insurance eligibility has been assessed by the insurer or regulator as financially unviable. Never pay a deposit before the home warranty insurance certificate is provided.
How many references should I call before signing with a builder?
At minimum two direct reference calls from clients of comparable projects completed within the past 18 months. Call them directly - do not accept written references as a substitute. For architect-designed projects, also call the architect from at least one reference project. Ask specifically about cost management, programme delivery, variation handling and defect rectification during the defects liability period. Ask whether they would engage the builder again. The answer to the last question is consistently the most revealing.
Should I get a lawyer to review a building contract before signing?
For any residential building contract above $200,000, engaging a construction lawyer to review the contract before signing is strongly recommended. Construction lawyers identify unfair provisions, missing protections, inadequate variation procedures and payment schedule structures that expose homeowners to unnecessary risk. The cost of a contract review - typically $500 to $2,000 depending on complexity - is negligible relative to the contract value and the potential cost of a disputed contract. For contracts above $500,000, it is effectively essential.