A builder's portfolio is a curated marketing document, not an independently verified record of what they have actually built. The projects shown are selected by the builder. The photographs are professionally taken at the best possible moment. The descriptions are written to emphasise achievements and omit problems. There is no independent verification that the projects shown were built by the builder claiming them, that they were completed on time and to specification or that the clients were satisfied with the outcome. For a homeowner or developer making one of the largest financial commitments of their life based on a builder's claimed track record, this absence of verification is a significant problem. This guide explains exactly how to verify a builder's past projects using public records, what records are available, what each confirms, how to use them and what the independent verification process looks like from first search to confirmed evidence.
Why builder portfolio verification matters
The residential construction industry in Australia has no centralised verified project database, no equivalent of the medical register that confirms a doctor's qualifications and practice history, or the legal register that confirms a solicitor's admitted status and practice record. A builder can claim to have built any project on their portfolio without independent verification. A builder can include projects built under a different company name, projects where they were a subcontractor rather than the principal contractor, projects built by their employees before those employees joined their current business or projects they had minimal involvement with.
This absence of verified project records is the problem BUILTLY was built to solve, and it is the reason that independent verification of builder project claims using public records is one of the most practically important research steps available to any homeowner before signing a building contract. Understanding what evidence actually proves a builder completed a project is the foundation of this process.
The good news is that public records do exist, title records, building permit records, council DA records, ASIC company records and state builder licence registers, that allow a diligent homeowner to independently verify many of a builder's project claims. For NSW projects the NSW builder licence check guide covers the full Service NSW process. They require time and some knowledge of where to look. But they are available and they are free or very low cost. Be aware of the red flags when choosing a property developer and review what to look for in a property developer's past projects if your project involves a development. If concerns arise during verification, the guide to builder complaints and disputes explains the formal resolution pathways available.
Public records by type
Understanding what each public record source confirms, and what it does not, is the foundation of an effective builder research process.
| Record type | What it confirms | Where to access it | Cost | Limitation |
|---|---|---|---|---|
| Certificate of Title, land title search | Who owns the property, encumbrances, easements, registered interests | State land titles office, online portal | $15 to $30 per search | Does not confirm who built the building, only who owns the land |
| Building permit records, council | Building permit issued for the project, permit holder, builder named on permit | Local council, freedom of information or development enquiry | Free to low cost, may require FOI request | Not all councils make permit records easily accessible, older records may not be digitised |
| Development application records, council DA | DA lodged for the project, applicant, architect, project description | Council DA tracking portal, most councils publish DA registers online | Free, publicly accessible | DA records confirm planning approval, not completion |
| Occupation certificate records | Occupancy certificate issued, confirms building was completed to the point of occupation | Building certifier or council, may require direct enquiry | Free to low cost | Private certifier records may not be publicly accessible, some states have more accessible records than others |
| ASIC company search | Builder's company, director history, insolvency history, related entities | ASIC Connect, connectonline.asic.gov.au | Free for basic search, $9 for full extract | Confirms company structure, not project history |
| State builder licence register | Builder's current licence status, licence class, any conditions or disciplinary history | State building regulator, QBCC Qld, Service NSW, BPC Vic | Free, publicly accessible online | Confirms licence status, not project history |
| QBCC completed project records, Queensland | In Queensland QBCC maintains records of notified building work, contractor details | QBCC, buildersregister.qbcc.qld.gov.au | Free | Queensland only, limited project detail |
| Court and tribunal records | Disputes, VCAT NCAT QCAT decisions involving the builder | Tribunal websites, some decisions publicly published | Free, online search | Not all decisions are published, only formal tribunal outcomes |
How to verify specific builder claims
Different builder claims require different verification methods. The following table maps common builder claims to the most effective verification approach for each, and shows what confirmed versus unverified evidence looks like in practice. Use the comparison section below to assess the evidence consistently across shortlisted builders.
| Builder claim | How to verify it | What confirmed verification looks like | What unverified looks like |
|---|---|---|---|
| We built this specific project at this address | Title search confirms property exists, council DA search confirms a building permit was issued, compare permit holder to builder's company name | DA or permit records show the builder's current company name as the permit holder or principal contractor | Permit is in a different company name, or no permit found, or builder cannot confirm permit details |
| We completed this project on time | Ask previous clients directly, compare marketed completion date to actual occupation certificate date | Client confirms actual handover date, OC date matches or is close to marketed completion | Builder cannot provide references, or clients report significant delays |
| We have built X number of projects in this area | Council DA register search for builder's company name, confirms number of DAs lodged in the area | DA register shows multiple projects attributed to the builder's company name in the area | Search returns fewer projects than claimed, or projects attributed to different company names |
| We won this industry award for this project | Search the awarding body's website, HIA, MBA, AIA, confirm the award exists and was given to this builder for this project | Award confirmed on awarding body's website with builder's name and project details | Award not found on awarding body's website, or attributed to a different entity |
| Our builder has X years of experience | ASIC search confirms when the builder's current company was registered, licence register confirms when the licence was first issued | Company registration and licence issue dates consistent with claimed experience | Company recently registered despite claims of long experience, licence issued more recently than claimed |
| This project was completed within budget | Ask previous clients directly, no public record confirms budget performance | Client confirms final contract sum was close to original contract price | Builder cannot provide references willing to discuss budget performance |
The council DA register, your first search
The council development application register is the most accessible and most useful public record for verifying builder project claims in Australia. Every council publishes its DA register, the record of all development applications lodged with the council, and most make it searchable online through their planning portal.
What you can find
Search the council DA register for the address of any project the builder claims to have built. The DA record will show the applicant, typically the owner, the architect or designer listed on the DA and in some cases the builder where they are named as the principal contractor. The DA status, approved, under construction, completed, confirms whether the project proceeded.
What the DA register does not confirm
The DA register confirms planning approval and sometimes the builder's name, but it does not confirm that the builder actually completed the construction, that the construction was completed to the specification shown in the DA drawings or that the project was completed on time. The DA is the planning approval, the building permit and occupation certificate records are closer to confirming actual construction.
How to search
In NSW use the NSW Planning Portal at planningportal.nsw.gov.au, the DA tracker is searchable by address. In Victoria use Council's ePathway or planning portal, most Victorian councils have online DA registers. In Queensland use Council's online DA tracking system, Brisbane City Council, Gold Coast City Council and others all publish searchable DA registers. In WA use the council's DA register, most are available through the council website.
The builder licence register, confirm who is licensed
Every Australian state maintains a publicly searchable register of licensed builders. Searching the builder's name and company through the register confirms their current licence status, licence class and any conditions, suspensions or disciplinary actions recorded against the licence.
State licence registers
Queensland, QBCC Licence Search at qbcc.qld.gov.au, search by individual name or company name, confirms licence class, status and any conditions. For the complete QBCC process see the QBCC licence check guide.
New South Wales, Service NSW licence check at service.nsw.gov.au, confirms contractor licence status for the individual or company.
Victoria: see the BPC practitioner register details below.
Western Australia, Building and Energy WA, register search confirms builder registration.
South Australia, Consumer and Business Services SA, builder registration search.
What the licence register tells you
The licence register confirms the builder is currently licensed, an essential baseline check. It also confirms the licence class, which determines what type and scale of work the builder is licensed to perform. A builder licensed for residential construction up to two storeys is not licensed to build a three storey building. The register may also show disciplinary history, conditions imposed on the licence, suspensions or cancellations, which are significant red flags.
What it does not tell you
The licence register confirms current status, it does not confirm what projects the builder has completed, whether they have delivered to programme or specification or how their clients rate the experience.
ASIC company search, confirm the business history
An ASIC company search confirms the registration history of the builder's company, when it was incorporated, who the directors are and whether there is any insolvency history. This is one of the most important verification steps for any significant building contract. For detailed guidance on using ASIC searches see the guide to checking a builder's ABN and company history.
What to search
Search the builder's company name through ASIC Connect at connectonline.asic.gov.au. A free search shows the company's current status, registration date and director names. A full company extract, $9, shows the complete director history including any previous directors and any deregistered related companies.
What to look for
Registration date. A company registered recently despite claims of long experience may indicate the builder has operated under multiple company names, a common pattern in builders who have experienced financial difficulties under previous entities.
Director history. The full extract shows all current and historical directors. Search each director's name to identify any other companies they have been associated with, particularly any that have been deregistered or wound up.
ASIC Published Notices. Search asic.gov.au/published-notices for the builder's company name and each director's name, this search reveals any insolvency notices, wind-up applications or other formal proceedings.
Calling previous clients, the most reliable verification
Public records confirm what was approved and licensed, they do not confirm what was experienced. Calling previous clients of the builder is the most reliable way to verify the quality of their delivery, the actual experience of working with them.
How to get client contacts
Ask the builder directly for contact details of clients from comparable completed projects, similar type, scale and specification to your proposed project. A builder confident in their track record will provide these readily. A builder who can only provide written testimonials, curated by themselves, or who is reluctant to provide direct client contacts is managing what you know about their performance.
What to ask
Was the project completed within the originally agreed timeline, and if not by how much did it run over and what caused the delay?
Was the final contract price close to the original price, or did variations significantly increase the final cost?
How did the builder manage defects after handover, were they responsive during the defects liability period?
Were there any significant quality issues during construction or after handover?
Would you engage this builder again, and would you recommend them to a friend building a comparable project?
Can you confirm the builder's company name on the contract matches the company they are currently trading as?
The right number of references
Call at least three direct references from comparable projects completed in the past two years. Written testimonials provided by the builder carry minimal evidentiary weight, direct calls where you ask specific questions are the reliable verification method. The site meeting checklist covers the running questions to ask once construction is underway, and is a useful reference for the kind of operational detail to ask previous clients about.
State-by-state public records and verification sources
The public record sources useful for builder verification are administered at state and territory level, and the portals, naming conventions and access conditions differ. Verify the current portal URL before relying on any source, because state planning systems are routinely consolidated or rebranded. The summary below identifies the primary records that confirm planning approvals, completed work and builder credentials in each state. Pair these with the national ASIC search and the relevant licence register in every project, regardless of state.
New South Wales
The NSW Planning Portal at planningportal.nsw.gov.au consolidates DA tracking, Complying Development Certificates and Construction Certificates for most NSW councils. Search by property address to confirm whether an approval was issued, who lodged it and the determination date. The Service NSW licence check confirms a contractor's current home building licence status, class and any disciplinary history. The NSW Office of Fair Trading record covers complaint outcomes and tribunal references. For state licence checks, see the NSW builder licence check guide.
Victoria
The Building and Plumbing Commission (BPC) practitioner register at vba.vic.gov.au confirms registration class, status and conditions for Victorian builders. SPEAR (the Surveying and Planning through Electronic Applications and Referrals system) tracks planning permit referrals in Victoria. Most Victorian councils publish DA registers through ePathway or equivalent council planning portals. The BPC assumed the former VBA functions.
Queensland
QBCC at qbcc.qld.gov.au is the most comprehensive single-state register in Australia for builder verification. The QBCC licence search confirms licence class, scope, conditions and complaint history. The QBCC builders register at buildersregister.qbcc.qld.gov.au lists notified building work and contractor associations. Council DA tracking is available through each local council; Brisbane City Council, Gold Coast City Council and Sunshine Coast Council all publish searchable registers. See the QBCC licence check guide for the complete search process.
Western Australia
Building and Energy WA, part of the Department of Energy, Mines, Industry Regulation and Safety, maintains the builder registration search and complaint history records. Local council DA records are accessed through individual council planning portals because WA does not have a single state planning portal. Confirm the registration class against the project type because WA distinguishes between unrestricted builder, restricted builder and other practitioner categories.
South Australia
PlanSA at plan.sa.gov.au provides state-wide planning information and DA tracking links for SA councils. Consumer and Business Services SA administers the building work contractor licence register. Verify the licence category covers the proposed work, because SA distinguishes building work contractors from building work supervisors and the supervisor must be named on the contract for the work to be lawfully carried out.
Tasmania
The LIST (Land Information System Tasmania) at thelist.tas.gov.au provides title and property information. CBOS (Consumer, Building and Occupational Services) administers the builder licence register in Tasmania. Council DA records are accessed through each local council. Tasmania has a smaller licensing market and shorter typical builder history records, so reference calls and supplier verification carry proportionally more weight than in larger states.
Australian Capital Territory
Access Canberra administers the builder licence register and DA tracking for the ACT. The single-jurisdiction structure means the licence register and the planning records are easier to cross-reference than in larger states, but the volume of comparable comparable projects is smaller so reference calls remain essential.
Northern Territory
The Building Practitioners Board (BPB) administers builder registration in the NT. Local council records cover DA approvals. The smaller market and longer supply chains make supplier and subcontractor references particularly important for NT builder verification.
Building an evidence framework
A reliable verification outcome rests on four layers of evidence rather than any single source. Treating each verification claim as a question to be answered by more than one independent layer is the most consistent way to identify a builder whose marketing exceeds their delivery.
Physical evidence
The built project itself is the most direct evidence of a builder's work. Visit the address, observe the work from the public footpath where the dwelling is occupied and look for evidence of quality across the visible trades, the roofing alignment, the brickwork coursing, the joinery proportions in window reveals, the consistency of paint finish. Physical evidence cannot be self-curated by the builder and persists long after marketing photographs have been retouched.
Paper trail evidence
Council approvals, building permits, occupation certificates, ASIC company extracts, licence register printouts and the building contract itself form the documentary record. Each piece of paper confirms a specific fact: that an approval existed, that a company was registered at a certain date, that a licence was current. The paper trail rarely confirms quality, but a missing piece of paper (no permit found, no occupation certificate) is a material gap that warrants explanation before the contract is signed.
Third-party verification
Independent parties who interacted with the builder during the project (subcontractors, suppliers, certifiers, structural engineers, neighbours) provide perspectives the builder cannot curate. A structural engineer who has worked with the builder across multiple projects knows whether RFIs are answered promptly. A supplier who has invoiced the builder over years knows whether accounts are paid on time. A neighbour who lived next to the construction site knows whether the build was managed considerately. These third parties are usually willing to share frank observations when asked specifically.
Owner interviews and document corroboration
Calling at least three previous clients of the builder remains the highest-yield verification step. The interview should corroborate the documentary record (was the company name on the contract the same as on the licence) and address the qualitative experience (timeline, variations, defects management). When the owner's account aligns with the paper trail and the physical evidence, the verification is robust. When the accounts diverge, the divergence itself is information about the builder's reliability.
Site visit verification protocol
BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
Pre-visit preparation
Confirm the address, the year of completion and the project specification with the builder before the visit. Print the marketing photographs the builder published of the project. Identify three or four specific features in the published images that you intend to verify in person, the roof material, the cladding profile, the window joinery proportions, the front fence detailing. Arrange the visit with the owner in advance where possible; a footpath inspection of an unannounced address is still informative for the external work.
What to photograph
Photograph the same elevations the builder published, taken from a comparable angle and at a comparable focal length. Photograph the trade boundaries where one material meets another, the brick to cladding junction, the cladding to soffit junction, the gutter to fascia junction. These boundaries are where workmanship failure is most visible. Photograph the front entry threshold and the driveway-to-kerb crossing, both of which reveal concreting and finishing standards.
What to ask the owner
Ask the questions described in the earlier section on calling previous clients in person. Add the address-specific questions: were there any council issues during the build, were there any disputes with neighbours, were there any defects identified at handover that took unusually long to rectify, has the dwelling performed as expected during the first wet season after handover.
Trade-by-trade assessment
Assess each visible trade against the standards documented in the BUILTLY guides on evaluating roofing quality in a completed project, evaluating waterproofing and the related trade-evaluation guides. The objective is not to fail a builder on small imperfections, the objective is to identify systematic workmanship issues that recur across multiple projects, because recurring issues indicate the builder's actual delivery standard.
What to compare against documentation
Cross-reference the site observations with the council DA records and the occupation certificate. Confirm the dwelling matches the approved plans, particularly the front setback, the building height and any approved variations. A dwelling that materially differs from the approved plans without a recorded amendment indicates either an enforcement issue or undisclosed scope creep, both of which warrant explanation.
When a builder has no public project history
Not every builder being considered for a contract has a long verified track record. Newer builders, builders who have recently re-registered under a new company name, builders who have worked principally as subcontractors before starting their own residential business and builders relocating from interstate may all present with limited public history at the point of verification. A thin public record is not automatically disqualifying, but it shifts the verification effort to alternative evidence sources and warrants adjusted commercial terms.
Verification alternatives when records are thin
Subcontractor relationships are the most useful alternative evidence layer. A builder who can nominate three or more subcontractors with whom they have worked across multiple projects has a verifiable delivery network even when the public record is short. Call each subcontractor and ask about payment behaviour, project frequency and the type of work performed. Supplier accounts (timber, plumbing, electrical, steel) produce comparable evidence, suppliers track payment behaviour and project volumes with precision and will usually confirm both when asked. Professional indemnity insurance history is another evidence layer; a builder with a current PI policy and a credible cover amount has been continuously assessed by an underwriter.
Acceptable trade-offs
A builder with limited history may be acceptable on a smaller, simpler project where the consequences of failure are reduced, on a contract structured with tighter progress payment milestones and increased retention, or where an experienced contract administrator is engaged to manage the delivery on behalf of the homeowner. Where the contract structure itself is being chosen, the lump sum vs cost-plus comparison sets out the trade-offs between fixed-price exposure and open-book transparency, and the choice of contract structure interacts with the verification gap, a builder with thin history is poorly suited to a cost-plus structure that relies on builder transparency. Finance structure matters here too, see the construction loans guide for the lender's parallel verification of the builder during the loan approval and drawdown process. A builder with limited history is not acceptable on a high-value, complex or heritage-sensitive project where the gap between marketed capability and demonstrated capability cannot be absorbed if it materialises mid-build.
Honest framing
Some of the best residential builders in Australia started as new entities five or ten years ago. A short verified history is not evidence of poor capability, it is evidence of less verifiable evidence. The framework remains the same: confirm what can be confirmed, weight what cannot be confirmed against the contract value and project complexity, and adjust the commercial terms to reflect the verification gap.
Builder verification checklist
Red flags in builder verification
Warning signs
- Builder's current company was recently registered despite claims of long experience, search for previous companies under the same directors
- Director has been associated with previous development or building companies that were wound up or went into administration
- Builder's licence has conditions, suspensions or disciplinary history recorded against it
- Builder cannot or will not confirm the company name on the building contract matches their trading name and licence entity
- Builder can only provide written testimonials, not direct client contact details for reference calls
- DA records for claimed portfolio projects show a different company name as the permit holder, builder may not have been the principal contractor
- Builder claims industry awards but awards cannot be confirmed on the awarding body's website
- References report significant timeline overruns, large variation cost increases or poor defects management
- Builder is evasive about specific project addresses when asked to confirm the locations of their portfolio projects
BUILTLY and builder verification
BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
First verified builder profiles launch in 2026 alongside the national rollout. Until then, the BUILTLY guide library covers the verification framework homeowners can apply themselves: the pillar complete guide to building a house in Australia sits at the centre of the cluster, with the licence, ASIC and reference-call guides covering each layer of the verification stack.
Compare verified portfolios and check designer references
Once project attribution is checked, compare recent work of a similar type, scale, specification and site complexity. Use the same scorecard for every shortlisted builder, recording a score from 1 to 5 and the evidence behind it for each dimension:
- Relevance of completed projects to your proposed build.
- Construction detail evidence, not just finished-room hero images.
- Named contributors and independently checkable project records.
- Consistency across several projects, including the weakest and most recent examples.
- Client evidence about delivery, variations and defect follow-up.
For architect-designed work, ask to speak with the architect or designer on two reference projects. Ask whether RFIs and shop drawings were handled promptly, substitutions were approved, the completed work followed the design intent and they would work with the builder again. Record specific examples alongside the scores; a numerical total is a comparison aid, not proof of construction quality.
Frequently asked questions
How do I verify a builder's past projects in Australia?
Start by searching the council DA register for the address of each major project the builder claims, confirm a building permit was issued and identify the permit holder. Search the builder's company through ASIC Connect to confirm registration history and identify any insolvency risk. Search the state builder licence register to confirm current licence status and any disciplinary history. Ask the builder for direct contact details of at least three clients from comparable projects completed in the past two years and call them with specific questions about timeline, budget and defects management. Together these sources provide the most comprehensive independently verified picture of a builder's actual track record available to an Australian homeowner. BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
What public records can I use to check a builder's history in Australia?
The primary public records available for builder verification are the council DA register, searchable online for most councils, which shows building permits issued and in some cases the builder named as permit holder. The state builder licence register, QBCC in Queensland, Service NSW in NSW, BPC in Victoria, confirms current licence status, licence class and disciplinary history. ASIC Connect at connectonline.asic.gov.au confirms company registration history and director details. ASIC Published Notices confirms any insolvency proceedings. State court and tribunal records show any formal disputes. BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
Can I trust a builder's portfolio as evidence of their past projects?
A builder's portfolio is a curated marketing document, not an independently verified record. The projects shown are selected by the builder, the photographs are taken at their best moment and the descriptions emphasise achievements. There is no independent verification that the projects were built by the builder claiming them, completed on time, delivered to specification or that clients were satisfied. Use the portfolio as a starting point, identify the projects and addresses claimed, and then independently verify each claim using the public records and reference call process described in this guide. The gap between the curated portfolio and the independently verified record is the most practically important information a homeowner can gather before signing a building contract.
How do I search the council DA register to check a builder's projects in Australia?
In NSW search the NSW Planning Portal at planningportal.nsw.gov.au, the DA tracker is searchable by property address. In Victoria search the relevant council's planning portal, most Victorian councils publish searchable DA registers through ePathway or equivalent systems. In Queensland search the relevant council's DA tracking system, Brisbane City Council and Gold Coast City Council both publish searchable registers. Search the address of each project the builder claims to have built, the DA record will show the applicant, the architect and in some cases the builder named as the principal contractor. Compare the company name shown on the DA to the builder's current trading name.
What should I ask when calling a builder's past clients?
Ask whether the project was completed within the originally agreed timeline, and if not by how much it ran over and what caused the delay. Ask whether the final contract price was close to the original price or whether variations significantly increased the cost. Ask how the builder managed defects after handover, were they responsive during the defects liability period. Ask whether there were any significant quality issues during construction or after handover. Ask whether they would engage this builder again and would recommend them to a friend building a comparable project. Ask them to confirm the builder's company name on the contract. Specific questions produce useful answers, general satisfaction questions produce marketing material.
What should I do if a builder has no public project history I can verify?
A builder with limited public project history is not automatically disqualified, but the verification burden shifts to evidence sources outside council and ASIC records. Confirm the licence and any prior trading entities through the state licence register and ASIC company search to identify earlier work under a different company name. Ask the builder to nominate three subcontractor relationships and three supplier accounts and call each one to confirm payment behaviour, project frequency and the type of work being delivered. Request the names of two industry referees, a structural engineer and a building certifier who have worked with the builder, and ask them about delivery quality. Ask for evidence of current professional indemnity and construction works insurance and confirm the certificates of currency with the insurer directly. The combination of subcontractor confirmation, supplier references, professional referees and current insurance reduces the verification gap considerably, but a builder with a thin history should attract a smaller contract value and tighter staged payment terms than a builder with a long verified track record.