Advice

Restumping and underpinning cost in Australia

Last updated: October 2026 ·

Restumping and underpinning are the two main ways an existing Australian home is brought back to a stable, level footing after the ground beneath it has moved or the original supports have failed. They are different trades solving the same underlying problem, and they are among the most expensive repairs a homeowner will ever authorise.

Restumping, also called reblocking in Victoria, means replacing the stumps that carry a suspended timber floor. Underpinning means extending or strengthening the footings beneath a slab, a masonry wall or a strip footing so that the load is transferred to more stable ground below.

This guide is about remediation of an existing home where movement has already been observed. It is not a design guide for new construction. If you are planning a new build on clay or reactive ground, footing design and site classification are a separate subject and belong with the design team before construction starts.

For the broader context on how Australian homes are built, and where footings and floor systems sit within that process, refer to the BUILTLY complete guide to building a house in Australia.

Recognising the signs of foundation movement

Foundation movement rarely announces itself. It shows up as a collection of small annoyances that a household adjusts to over years before someone connects them. The usual signs are:

  • Floors that slope noticeably, or that bounce and creak in one part of the house
  • Internal doors that swing open or closed on their own, or that stick and need to be planed
  • Windows that will not shut cleanly, or sashes that bind in the frame
  • Stair-stepped cracking through mortar joints in external brickwork
  • Cracked cornices, particularly where a ceiling meets an internal wall
  • Gaps opening between skirting boards and the floor, or between architraves and the wall lining
  • A visible dip or hump when a straight edge or a level is laid across the floor

One of these on its own is often harmless. Several appearing together, in the same part of the house, and getting worse over successive seasons, is the pattern that points to movement in the supporting structure rather than ordinary timber shrinkage or seasonal expansion.

Distinguishing normal settlement cracking from structural cracking matters, because it determines whether you are looking at a cosmetic repair or a five figure remediation. The BUILTLY guide on cracking in new builds in Australia sets out how crack width, direction and rate of change are read, and much of that reading applies equally to an older home.

Restumping vs underpinning: what is the difference

These two terms are used interchangeably in conversation, and they should not be. They apply to different construction types and involve different trades, different equipment and very different price structures.

Restumping and reblocking

Restumping applies to a house with a suspended timber floor sitting on individual stumps or piers, with a subfloor void underneath. The original stumps may be hardwood timber, precast concrete or, in more recent work, galvanised steel with an adjustable head.

The process involves supporting the bearers on temporary jacks, removing the failed stump, excavating a new footing hole, placing the new stump on a concrete footing pad, and lowering the structure back onto it at the correct level. On most jobs the levels are corrected at the same time, which is why restumping is often the moment a house that has been out of level for decades comes back to true.

Partial versus full restumping

A partial restump replaces only the stumps that have failed. It is cheaper, but it can leave a house with a mix of old and new supports settling at different rates, and it often means a second mobilisation cost within a few years. A full restump costs more up front and resets the whole floor at once. Where more than about a third of the stumps are failing, most contractors will recommend doing the lot.

Underpinning

Underpinning applies to a house on a concrete slab, a strip footing or a masonry base, where there is no subfloor void to work in and the footing itself has moved. Rather than replacing supports, underpinning extends the existing footing downwards or sideways so the load reaches soil with adequate bearing capacity.

Common underpinning methods

  • Mass concrete underpinning - sections of soil beneath the footing are excavated in a controlled sequence and backfilled with concrete, forming a deeper footing
  • Bored or screw piers - piles are installed adjacent to the footing and connected with a needle beam or bracket, transferring load to deeper strata
  • Resin injection - an expanding structural resin is injected into the soil to densify it and lift the slab, used where movement is moderate and access is tight

The practical distinction is simple. If the house has a subfloor you can crawl into, you are almost certainly talking about restumping. If it sits on a slab or solid masonry base, you are talking about underpinning, and the engineering involvement steps up accordingly.

What causes the need for restumping or underpinning

Remediation is a symptom. Getting the cause right before the work is priced is what separates a repair that holds from one that fails again in five years.

Reactive and moving soil

Much of Australia sits on clay soils that swell when wet and shrink when dry. That seasonal cycle lifts and drops parts of a footing, and over years the differential movement shows up in the structure above. Reactive soil is a leading cause of the movement that leads to underpinning, particularly in Adelaide, Melbourne and parts of south east Queensland.

Reactive soil is a large subject in its own right, covering site classification, footing design and moisture management for new construction. That material is covered separately in the BUILTLY guide on slab heave and reactive soil in Australia, which deals with the design and prevention side. For the purposes of this guide, reactive soil is simply one of several causes to identify and manage before remediation is designed.

Deteriorated timber stumps

In older housing stock, the most common cause is simply age. Hardwood stumps set directly into the ground rot at the soil line where moisture and oxygen meet. Termite attack accelerates the process, and poor subfloor airflow keeps the void damp year round. Where the subfloor is chronically damp, restumping alone will not solve the underlying condition, and the BUILTLY guide on subfloor ventilation requirements in Australia explains the airflow rules and the mechanical options that keep a repaired subfloor dry.

Poor original construction

Undersized footing pads, stumps set on nothing but compacted soil, excessive spans between supports, and unapproved owner alterations that removed load bearing elements all show up decades later as sagging floors. Extensions added to an original dwelling are a frequent trouble spot, because the new footings often behave differently to the old ones and the junction between them cracks.

Trees, drainage and water

Large trees close to a footing draw moisture out of clay soil and cause localised shrinkage. Conversely, a leaking stormwater line, a downpipe discharging at the base of a wall, or a failed sewer connection saturates one zone of soil and softens it. Water management is often the cheapest part of the fix and the part most frequently skipped. Any competent remediation scope deals with drainage and vegetation before, or at the same time as, the structural work.

Cost drivers

The figures below are general Australian market indications for planning purposes. Real pricing depends entirely on site conditions and must come from an inspection.

Restumping: cost per stump

Restumping is quoted per stump, and the rate typically sits between about $60 and $120 per stump for supply and install where access is reasonable. Adjustable galvanised steel stumps cost more per unit than concrete but allow later releveling without re-excavating.

  • Stump count - a small cottage may need 40 stumps, a large Queenslander well over 100
  • Subfloor clearance - a crawl space under about 600mm forces hand excavation and slows everything down
  • Stump height - tall stumps on a sloping site need larger footings and bracing
  • Wall and roof weight - a tiled roof over brick veneer loads the bearers far more than weatherboard under sheet metal
  • Levelling - bringing a badly out of level house back to true causes cracking in plaster and cornices that has to be made good

Most full restumping jobs on a standard timber floored home land somewhere between about $5,000 and $20,000, with larger or difficult properties exceeding that. Making good the internal finishes afterwards is a separate cost that is easy to underestimate.

Underpinning: cost per pier

Underpinning is quoted per pier. Mass concrete piers commonly run between about $1,500 and $3,500 each, with piled solutions higher where founding depth is significant. The drivers are:

  • Number of piers - set by the engineer based on wall length, load and the extent of movement
  • Founding depth - deeper stable strata means more excavation, more concrete and more time per pier
  • Access - a rear corner reachable only through a narrow side path means everything is barrowed by hand
  • Structure weight - double brick and two storey construction requires heavier temporary support
  • Soil conditions - groundwater, fill or unstable material requires shoring and can change the method entirely
  • Design and monitoring - engineering fees, level monitoring and certification are additional to the construction rate

A localised underpin to one corner may total $10,000 to $25,000. A full perimeter underpin on a larger masonry home can exceed $50,000 once design, excavation, reinstatement of paving and internal repairs are included. Because these numbers are substantial, homeowners should record every quotation, scope and inspection report as they go, so the eventual works package can be published to future buyers and insurers as a complete history.

When a structural engineer is required

There is a threshold at which this work stops being a routine trade task and becomes an engineered remediation. Crossing it without a design is how homeowners end up paying twice.

Engage a structural engineer where any of the following apply:

  • The house is on a slab or masonry footing and underpinning is being considered at all
  • Cracking is wider than about 5mm, is stair-stepped through brickwork, or is still opening
  • Floor levels vary by more than a nominal amount across a single room
  • The cause of the movement has not been identified with confidence
  • Loads are being redistributed, walls removed, or levels significantly changed as part of the work
  • Two contractors have proposed materially different remedies for the same problem
  • A building permit, insurance claim or dispute requires certified documentation

The engineer's role is to inspect, establish the cause, specify the remedy in a drawing and specification, and certify the completed work. That certificate is what a certifier, an insurer or a future purchaser will ask for. Paying for independent engineering advice before you accept a quote also gives you a scope that multiple contractors can price on the same basis.

The BUILTLY guide on structural engineers in Australia covers registration requirements by state, what an inspection typically includes and how engineering fees are usually structured.

Permits and inspection requirements

Restumping and underpinning alter the structural support of a dwelling, so in most Australian jurisdictions they are building work requiring approval rather than maintenance. In practice that means a building permit or development approval issued by a council or a private building surveyor or certifier, supported by the engineer's design where one is required.

A typical approval pathway involves:

  • Engineering assessment and design documentation of the proposed remedy
  • Application to council or a private certifier, with drawings and specifications
  • Mandatory inspections at set hold points, commonly footing excavation before concrete is placed
  • Final inspection and issue of a completion or occupancy document
  • Engineer's certification that the work was carried out in accordance with the design

Requirements and thresholds differ between states and territories, and some minor like-for-like stump replacement may fall below the trigger. Confirm the position with your council or certifier before the first stump comes out, because retrospective approval is expensive and sometimes unavailable.

Insurance is the other half of this. Confirm the contractor holds current public liability cover and, where the contract value requires it, the relevant statutory home warranty or domestic building insurance for your state. The BUILTLY guide on construction insurance in Australia explains which policies apply to residential work and what each one actually covers.

What to check before hiring a contractor

This is specialised work and general building experience is not a substitute for it. The checks below are the ones that separate a contractor who does this weekly from one who is learning on your house.

Genuine experience with this specific work

Ask how many restumping or underpinning jobs the contractor completed in the last twelve months, on what construction types, and in what suburbs. Ask to see completed examples of similar age, construction and soil conditions to yours, with the engineer's certificate for at least one of them. A contractor who can produce a documented record of comparable work is telling you something a testimonial cannot.

Licensing and registration

Structural remediation generally requires a builder licence or registration in the relevant class, and the licence number should appear on the quote and the contract. Check it against the state regulator's public register rather than taking it on trust. The BUILTLY guide on how to check a builder's licence in Australia lists the register for each state and territory and what the results actually mean.

Engineer sign-off in the scope

Where an engineer is involved, the quote should state clearly who engages the engineer, whether the design fee is included, and that certification of the completed work is part of the deliverable. A quote that omits certification is not comparable with one that includes it.

Warranty and what it covers

Ask for the warranty period in writing and, more importantly, what it covers. A warranty on workmanship is not a warranty against further ground movement. Reputable underpinning contractors will often warrant against further settlement of the underpinned section specifically, while excluding areas not treated. Understand the boundary before you sign.

Scope, exclusions and making good

Confirm in writing whether the price includes removal of spoil, reinstatement of paths, paving and garden beds, patching of internal cracking after releveling, and repainting. These reinstatement items routinely add thousands and are the most common source of dispute at the end of a job. Get at least three quotes on an identical engineered scope so you are comparing the same work.

BUILTLY and lasting project records

Restumping and underpinning are high stakes, high cost decisions made under pressure, usually by a homeowner who has never commissioned structural work before. The single most useful piece of evidence at that moment is a verifiable record of what a contractor has actually completed on comparable buildings.

BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.

Frequently asked questions

How much does restumping a house cost in Australia?

Most Australian restumping work is priced per stump. Typical rates run from roughly $60 to $120 per stump for supply and installation on an accessible site, with concrete stumps generally at the higher end of that band and galvanised steel adjustable stumps higher again. A modest weatherboard cottage may carry 40 to 80 stumps, which puts many full restumping jobs between about $5,000 and $20,000. Restricted subfloor clearance, sloping sites, heavy roof materials and the need for temporary propping all push the rate up. These are general ranges only and any firm figure must come from a site inspection.

How much does underpinning cost per pier?

Underpinning is usually priced per pier rather than per square metre. Mass concrete piers on a straightforward site commonly fall between about $1,500 and $3,500 each, while screw piles or bored piers into deeper founding material can run higher. A localised repair to one corner of a house might involve four to eight piers, while a full perimeter underpin on a larger masonry home can involve twenty or more. Engineering design, monitoring and making good finishes are usually costed separately.

Do I need a structural engineer for restumping or underpinning?

Underpinning almost always requires a structural engineer, because the design depends on founding depth, soil bearing capacity and the load path of the existing structure. Straight replacement of deteriorated stumps on a like-for-like basis is often treated as routine trade work, but as soon as levels are being changed, loads are being redistributed or the movement has an unresolved cause, an engineer should assess the building and specify the remedy in writing.

Do I need a building permit to restump or underpin a house?

In most Australian states, restumping and underpinning are structural works that require a building permit or approval issued by a council or private certifier, along with mandatory inspections at set stages. Requirements vary by state and by the scope of the work, so confirm the position with your local council or certifier before work starts. Work carried out without approval can create problems at sale and can void insurance cover.

How long does restumping take?

A typical full restump on an average sized timber floored home takes about one to two weeks on site once the permit is in place, plus time for inspections and making good. Underpinning is slower because excavation, concrete pours and curing are sequenced pier by pier, and a substantial job can run three to six weeks. Wet weather and difficult access extend both.