What Does a Bricklayer Do in a Residential Construction Project in Australia

•Last updated: October 2026

Bricklaying is one of Australia's most enduring construction trades - and one of the most technically demanding when executed to a high standard. A bricklayer in residential construction is responsible for the masonry elements of the building - the external brick veneer or full brick walls, the internal brick features, the piers, the retaining walls and any other masonry construction specified in the design. Their work is among the most visible in any completed project - the brickwork is the face of the building that the street sees every day - and their craft is immediately distinguishable by an informed eye. Consistent mortar joints, correctly aligned courses, adequate weep holes, proper cavity ties and clean brickwork free of mortar staining are the marks of a skilled bricklayer. Understanding what a bricklayer does, what their scope covers, what the structural requirements are and what quality brickwork looks like in a completed home is practical knowledge for any homeowner building in Australia.

What does a bricklayer do?

A bricklayer in residential construction lays masonry units - clay bricks, concrete blocks, natural stone or other masonry products - in mortar to construct walls, piers, features and other masonry elements specified in the design. Their primary scope in standard residential construction is the external brick veneer - a single leaf of brickwork tied to the structural timber or steel frame - which provides the external cladding and the aesthetic face of the building.

The bricklayer's work follows the concrete slab or footing construction and the erection of the structural frame. They work from the footing or slab edge upward - laying each course of bricks in mortar at the specified joint thickness, maintaining consistent alignment and level and installing the cavity ties, lintels, weep holes and other built-in components specified by the structural engineer and the architect.

In residential construction the bricklayer is typically engaged by the builder as a specialist subcontractor. Their work sequence is closely coordinated with the frame - the brick veneer is laid against the outside face of the frame, tied to it with wall ties at specified spacings. The cavity between the brick veneer and the frame - typically 50mm - must be kept clean and free of mortar droppings that could bridge the cavity and allow moisture to transfer to the frame.

Bricklaying scope by application

The bricklayer's scope varies by application - from the primary external brick veneer to internal feature walls, structural piers and retaining walls.

ApplicationWhat the bricklayer constructsStructural requirementsKey quality considerations
Brick veneer - external wallsSingle leaf of brickwork tied to the structural frame - provides the external cladding and aesthetic faceWall ties to structural frame at specified spacings - lintels over all openings - weep holes at baseConsistent joint width and profile - clean cavity free of mortar droppings - correct weep hole placement
Full brick - double leafTwo leaves of brickwork with a cavity - the inner leaf is structural - the outer leaf is the faceInner leaf carries structural loads - engineer design required - damp proof course criticalBoth leaves correctly aligned - cavity clean - weep holes at all damp proof course locations
Internal feature wallsSingle or double leaf brick feature - typically internal - for architectural effectNon-structural in most applications - confirm with engineer if load-bearingConsistent joints - clean brickwork - mortar colour consistent
Piers and columnsMasonry piers supporting beams, pergolas, carports or other structuresEngineer design typically required for structural piersPlumb and square - mortar joints consistent - correct coursing height
Retaining walls - masonryMasonry retaining wall using concrete blocks or bricksEngineer design required for walls above 1000mm - drainage behind wall criticalPlumb and level - weep holes installed - drainage correctly installed behind wall
Garden walls and feature wallsLow masonry walls for landscaping - not structuralNo structural engineer required for low non-structural walls - check local council requirementsConsistent joints - capping course correctly bedded - drainage considered
Chimneys and fireplacesMasonry chimney and fireplace constructionStructural engineer design for masonry chimney above roofline - flashing critical at roof junctionPlumb and square - flashing correctly integrated - mortar joints weathertight

Brick veneer construction - how it works

Brick veneer is the most common bricklaying application in Australian residential construction. Understanding how brick veneer works - what it is and is not - is important context for assessing brickwork quality.

What brick veneer is

Brick veneer is a non-structural single leaf of brickwork - typically one brick thick, 110mm - that is attached to the structural timber or steel frame by metal wall ties. The brick veneer provides the external cladding and the aesthetic face of the building. It carries its own self-weight down to the footing but does not carry the structural loads of the building - that is the frame's job.

What brick veneer is not

Brick veneer is not a structural wall - it is a cladding. This distinction matters when assessing cracks in brickwork - hairline cracking in brick veneer may indicate differential movement between the brick veneer and the frame rather than structural failure. It also matters for insulation - the cavity between the brick veneer and the frame is typically where insulation is installed.

The cavity

The cavity between the brick veneer and the frame - typically 50mm - must be kept clean throughout the bricklaying process. Mortar droppings that fall into the cavity and accumulate on the wall ties or on the cavity closer at the base can bridge the cavity - allowing moisture to transfer from the outer leaf to the frame. A clean cavity is one of the most important quality indicators in brick veneer construction and one of the least visible in a completed project.

Wall ties

Wall ties connect the brick veneer to the structural frame. They must be installed at the specified spacing - typically every second course vertically and at 600mm horizontal spacing, with additional ties at openings and at the top of the wall. Ties that are missing, incorrectly spaced or incorrectly embedded in the mortar joint create a wall that is not adequately connected to the frame - a safety and structural issue. The construction stage is the only time wall tie installation can be inspected before the cavity is permanently sealed.

Brick and mortar types comparison

The selection of brick and mortar type affects the appearance, durability and structural performance of the finished brickwork.

TypeWhat it isTypical applicationKey consideration
Clay brick - standardFired clay unit - most common residential brick in AustraliaExternal brick veneer - full brick walls - feature wallsWide colour and texture range - durability excellent - check consistency of colour within a batch
Clay brick - handmade or artisanHandmade fired clay brick - irregular texture and colour variationPremium residential - heritage - feature applicationsDeliberate variation is part of the aesthetic - confirm the variation is intentional not a quality issue
Concrete block - standardCement and aggregate masonry unit - smooth faceBoundary and retaining walls - garage walls - secondary structuresNot typically used for residential face brickwork - primarily structural and secondary applications
Concrete block - split faceConcrete block with textured split faceFeature walls - boundary walls - lower cost alternative to clay brickLess durable than clay brick in exposed locations - efflorescence risk
Natural stoneGranite, sandstone, bluestone or other natural stonePremium feature walls - heritage restoration - landscape wallsHigh cost - specialist installation - engineer input for structural applications
Mortar - standard cement basedPortland cement, sand and water mixStandard residential bricklayingMortar strength must match the brick strength - mortar stronger than the brick causes the brick to crack rather than the joint
Mortar - colouredStandard mortar with pigment addedWhere mortar colour is specified in the design - feature applicationsColour consistency requires consistent batching - confirm the same pigment mix is used throughout

Weep holes - the most commonly missed detail

Weep holes are small openings left in the mortar bed at the base of brick veneer walls - at the flashing or damp proof course level - that allow any moisture that penetrates the outer leaf or condenses in the cavity to drain out rather than accumulating and damaging the frame.

Why weep holes matter

A brick veneer wall without adequate weep holes creates a sealed cavity - moisture that enters through the outer leaf or condenses against the inner face of the brickwork has nowhere to go. Over time this moisture accumulates, saturates the cavity insulation and eventually reaches the frame - causing timber rot, mould and structural damage that may not be visible for years after the brickwork is complete.

What correct weep hole installation looks like

Weep holes should be installed at every damp proof course location - typically at the base of the wall at the footing level and above all lintels over openings. The weep holes are typically formed by leaving the perpendicular mortar joint open - not filling it with mortar - at regular intervals - typically every third or fourth perpendicular joint. In some specifications a purpose-made plastic weep hole insert is used to prevent insect entry while maintaining drainage.

What to check

Confirm weep holes are present at the base of the wall at the footing level and above all lintels over window and door openings. The weep holes should be visible as open joints at regular intervals. The absence of weep holes - or weep holes that have been filled with mortar - is one of the most common and most consequential bricklaying quality defects in residential construction. This is a key item on any final inspection checklist.

Lintels - structural elements over openings

Every opening in a brick veneer or full brick wall - every window, door and other penetration - must have a structural lintel above it that supports the brickwork above the opening and transfers the load to the jambs on either side.

Lintel types

In residential brick veneer construction lintels are typically steel angle lintels - a steel angle section sized by the structural engineer for the opening width and the loads above. For larger openings - above approximately 1800mm - a larger steel section or a reinforced masonry lintel beam may be required.

Lintel installation

The lintel must bear on the brickwork on each side of the opening by a minimum bearing length - typically 150mm each side - to transfer the load adequately. A lintel with insufficient bearing can shift under load - causing cracking in the brickwork above the opening that may indicate a structural issue rather than cosmetic cracking.

Corrosion protection

Steel lintels in external brickwork must be adequately protected against corrosion - typically by galvanising or a protective coating. A lintel that corrodes within the cavity will expand as the rust products form - causing horizontal cracking in the brickwork above the opening. In coastal locations stainless steel lintels are preferred over galvanised steel.

Common bricklaying defects

Understanding common bricklaying defects - what they look like, what causes them and what the consequences are - is essential for assessing brickwork quality during construction and at the defects liability period. Some defects - particularly structural cracking - require specialist assessment.

DefectWhat it looks likeCauseConsequenceRectification
EfflorescenceWhite powder or staining on the face of the brickworkSoluble salts in the brick or mortar leaching to the surface as moisture evaporatesPrimarily aesthetic - may indicate moisture movement through the wallAllow to weather naturally - or specialist efflorescence cleaner - address moisture source if persistent
Mortar stainingMortar smeared on the face of the brickworkMortar dropped or smeared during laying - not cleaned promptlyAesthetic - significant if widespreadAcid wash - specialist brick cleaner - difficult to remove completely once cured
Inconsistent joint widthMortar joints vary in width - courses not levelInsufficient care during laying - incorrect gauge rod useAesthetic - affects the overall quality impression significantlyCannot be corrected without demolishing and relaying - prevention only
Missing or blocked weep holesNo open joints at the base of the wall at damp proof course levelWeep holes not formed during laying - or filled after layingMoisture accumulation in cavity - frame damage over timeDrill or rake out weep holes - address any moisture damage
Diagonal cracking at openingsDiagonal crack from the corner of a window or door openingInadequate lintel bearing - differential foundation movement - lintel failureMay indicate structural movement - requires structural assessmentStructural engineer assessment - rectification depends on cause
Horizontal crackingCrack following a mortar bed jointDifferential movement between the brick veneer and the frame - or lintel corrosion expansionMay be cosmetic movement cracking or structural - requires assessmentStructural engineer assessment if associated with movement - repoint affected joint if cosmetic
Mortar too strong - brick crackingCracks through the face of the brick - not through the mortar jointMortar mix stronger than the brick - mortar cannot flex - brick fails instead of jointStructural and aesthetic - bricks cracking indicates incorrect mortar specificationRepoint with correctly specified mortar - replace cracked bricks
Cavity mortar droppingsNot visible from exterior - only detectable in the cavityMortar droppings from laying accumulating in cavity - bridging cavityMoisture transfer from outer leaf to frame - frame damageAccess cavity - remove mortar droppings - address any moisture damage

Bricklaying quality inspection checklist

Use this checklist to confirm bricklaying quality at key stages of construction - from laying through to practical completion and building inspections.

During bricklaying - inspect the cavity at regular intervals - confirm it is clean and free of mortar droppings - this is the only opportunity to confirm cavity cleanliness before it is permanently sealed

Confirm weep holes are being formed at the base of the wall and above all lintels - check at the completion of each day's work

Confirm wall ties are being installed at the specified spacing - check at the completion of each day's work while ties are still visible

Confirm mortar joint width is consistent throughout - check with a gauge rod or tape measure - standard residential joint is typically 10mm

Confirm the mortar profile - the shape of the finished joint - is consistent throughout - confirm it matches the specified profile - flush, raked or ironed

After bricklaying is complete - inspect all lintel installations - confirm adequate bearing on each side and that the lintel is level

Inspect the face of the brickwork for mortar staining - confirm the bricklayer is cleaning the face as they progress rather than leaving staining to cure

At practical completion - inspect all weep holes - confirm they are open and unobstructed

At practical completion - inspect all external corners for plumb - use a spirit level

At practical completion - stand back and view the brickwork under raking light - inconsistent joint widths and courses that have wandered from level are most visible from a distance under oblique lighting

Red flags

No weep holes visible at the base of the wall or above window and door lintels - missing weep holes are a consequential defect that is invisible from a completed building until moisture damage appears
Mortar staining on the face of the brickwork that has been allowed to cure - very difficult to remove without damaging the brick face
Cavity is full of mortar droppings - visible through weep holes or any accessible opening - cavity bridges moisture between the outer leaf and the frame
Brickwork courses are visibly unlevel - wandering courses are a permanent aesthetic defect
Diagonal cracking at window or door corners during or shortly after construction - may indicate inadequate lintel bearing or foundation movement
Mortar joints are inconsistent in width - visible variation across the face of the wall
Steel lintels are ungalvanised in an external application - corrosion and horizontal cracking likely within 5 to 15 years
In coastal locations - standard galvanised lintels and ties specified rather than stainless steel - accelerated corrosion likely

BUILTLY and bricklaying quality

Brickwork quality is one of the most immediately assessable quality indicators in any completed residential building - and one of the elements that the street sees every day. Consistent mortar joints, correctly coursed brickwork, clean face brickwork free of staining and correctly positioned weep holes are all visible to an informed observer in an in-person visit to a completed project.

BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.

Frequently Asked Questions

What does a bricklayer do in residential construction in Australia?

A bricklayer lays masonry units - clay bricks, concrete blocks or stone - in mortar to construct the masonry elements of a residential building. In standard Australian residential construction their primary scope is the external brick veneer - a single leaf of brickwork tied to the structural timber frame that provides the external cladding and aesthetic face of the building. They also construct internal brick features, masonry piers, retaining walls and any other masonry elements specified in the design. Their work follows the slab or footing construction and the erection of the structural frame.

What are weep holes in brickwork and why do they matter?

Weep holes are small openings left in the mortar bed at the base of brick veneer walls - at the damp proof course level - and above all lintels over window and door openings. They allow moisture that penetrates the outer leaf or condenses in the cavity to drain out rather than accumulating. A brick veneer wall without adequate weep holes creates a sealed cavity where moisture accumulates - eventually transferring to the timber frame and causing rot and structural damage. Weep holes should be visible as open perpendicular joints at regular intervals - typically every third or fourth joint - at the base of the wall and above all openings.

What is the difference between brick veneer and full brick construction in Australia?

Brick veneer is a non-structural single leaf of brickwork - typically 110mm thick - attached to a structural timber or steel frame by metal wall ties. The frame carries the structural loads. The brick veneer provides the external cladding only. Full brick construction - also called double brick or cavity brick - uses two leaves of brickwork with a cavity between them. The inner leaf is structural and carries the building loads. Full brick construction is heavier, more thermally massive and more expensive than brick veneer but provides better thermal performance and sound insulation.

What causes cracking in brickwork in new Australian homes?

The most common causes are diagonal cracking at window and door openings - caused by inadequate lintel bearing, differential foundation movement or lintel corrosion - horizontal cracking following mortar bed joints - caused by differential movement between the brick veneer and the frame or lintel corrosion expansion - and step cracking in diagonal stair-step patterns - caused by differential foundation movement. Hairline cracking in mortar joints is common in new buildings as the structure settles and is typically cosmetic. Cracks wider than 2mm or cracks associated with visible movement warrant a structural engineer's assessment.

What should I check when assessing brickwork quality in a completed home?

Stand back from the building and view the brickwork under raking light - oblique angle lighting reveals inconsistent courses and joint variations invisible under direct light. Check that mortar joints are consistent in width and profile throughout. Confirm weep holes are present at the base of the wall and above all window and door openings - open perpendicular joints at regular intervals. Check the face of the brickwork for mortar staining - brown or white staining that was not cleaned during laying. Inspect all external corners with a spirit level - brickwork should be plumb. Look for any cracking - particularly diagonal cracking at window and door corners which may indicate structural movement.