Every house in Australia sits on concrete that somebody poured, screeded and cured, usually in a single morning, and almost always before the owner has any real sense of what is happening. The concreter is the trade behind that work, and the slab they pour is the one element of the build that cannot be inspected, corrected or replaced once the trucks leave. This guide explains what a concreter actually does across a residential project, how licensing and qualifications work state by state, which Australian standards govern the work, how the concreter's role differs from the formworker, the builder and the pump operator, the defects that show up when the work goes wrong, and what to verify before you let anyone pour concrete on your site.
Key takeaways
A concreter prepares, pours and finishes all concrete elements, from the structural slab before frame erection to the driveway and paths at the end of the project.
The structural slab is the concreter's most consequential work and is subject to a mandatory slab inspection before the pour.
Waste outlet positions, reinforcement placement and drainage penetrations must be confirmed before the slab pour, because errors cannot be corrected afterwards.
Control joints must be planned for driveways and paths. Concrete without control joints will crack.
Concreting is licensed differently in every state, and the Certificate III in Concreting is the only consistent national qualification reference point.
What does a concreter do?
A concreter in residential construction is a tradesperson who prepares, pours and finishes the concrete elements of a building. That means the structural slab and footing system first and foremost, and then the external concrete work: driveways, paths, patios, alfresco slabs, garage floors and, on many sites, concrete block retaining walls.
The concreter works to two masters. The first is the structural engineer's drawing set, which dictates slab type, thickness, reinforcement size and spacing, edge beam dimensions and concrete strength grade. None of that is negotiable on site. The second is the builder's programme, which requires the slab to land inside a weather window and to be cured before frame erection can start. When those two pressures collide, which they regularly do, shortcuts appear. Understanding what the concreter is supposed to do is the easiest way to notice when the shortcuts are being taken.
The most consequential work is the slab. It is poured only after the mandatory slab stage inspection, at which the building certifier confirms formwork, reinforcement and drainage penetrations are correct. Everything the certifier looks at disappears under concrete an hour later. See building inspections in Australia for the full inspection framework, and the complete guide to building a house in Australia for where the slab sits in the overall sequence.
It is worth naming what a concreter is not. They are not the structural engineer, so they do not design the slab or approve variations to it. They are not the certifier, so their own view that the reinforcement looks right carries no regulatory weight. And on most sites they are not the person who ordered the concrete mix. Those distinctions matter enormously when something goes wrong, because they determine who carries the liability.
Concreting scope by project element
The table below summarises the concreter's scope across each project element: what work is performed, when in the construction programme it occurs, and what the key checks are before the pour. See what happens at each stage of building a home in Australia for the complete stage-by-stage framework.
| Concrete element | What the concreter does | When in programme | Key checks before pour |
|---|---|---|---|
| Structural slab - waffle pod | Sets up formwork and edge profiles, positions waffle pods, installs reinforcement to structural drawings, coordinates with plumber for slab penetrations | Base stage - before frame erection | Slab inspection by building certifier - reinforcement placement, edge beam dimensions, drainage penetrations |
| Structural slab - stiffened raft | Sets up formwork and edge profiles, installs reinforcement and ground beam reinforcement to structural drawings | Base stage - before frame erection | Slab inspection by building certifier - deeper edge beams and heavier reinforcement than waffle slab |
| Driveway - concrete | Prepares sub-base, sets up formwork, pours and finishes concrete - typically exposed aggregate, plain or coloured | After lock-up - or at end of project before landscaping | Sub-base compaction confirmed - drainage fall correct |
| Paths and pathways | Prepares sub-base, sets up formwork, pours and finishes | After lock-up or at end of project | Drainage fall confirmed - setback from boundary correct |
| Patio and alfresco slab | Prepares sub-base, sets formwork and falls, pours and finishes | After lock-up - before or after external cladding depending on programme | Drainage falls correct - step down from internal floor level confirmed |
| Retaining walls - concrete block | Sets foundations, lays block courses to engineer's drawings | During early construction for structural retaining walls | Engineering drawings confirmed - drainage behind wall planned |
| Garage slab - internal | Pours internal garage floor slab - typically after frame stage | During fixing stage - after frame and roof | EV charger conduit and drainage confirmed installed before pour |
The structural slab, step by step
The structural slab is the concreter's most consequential work in any residential project and the work subject to the most rigorous inspection. See waffle slab vs raft slab for a detailed comparison of the two most common slab types in Australian housing.
Formwork
The concreter sets up the formwork, the temporary mould that defines the shape, dimensions and level of the slab. On a waffle slab the formwork defines the perimeter edge beams and any thickened internal beams. Dimensions must match the structural drawings and the whole assembly must be levelled so the finished slab surface lands at the specified floor level. A slab set 30mm low is a problem that follows the build all the way to the front door threshold.
Waffle pod placement
On waffle slab construction the concreter positions the polystyrene pods in the grid pattern shown on the structural drawings. The pods define the internal void spaces between the concrete ribs, so pod position determines rib spacing and rib cross-section. A pod grid that has drifted out of alignment produces ribs that are narrower than designed, which is a structural issue, not a tidiness issue.
Reinforcement placement
Steel reinforcement, both rebar and mesh, is placed on bar chairs that maintain the specified cover between steel and concrete surface. The reinforcement must be the correct bar size, at the correct spacing, at the correct cover. This is precisely what the slab inspection confirms. Incorrect reinforcement cannot be corrected after the pour, and insufficient cover is the root cause of concrete cancer decades later. See who is responsible for structural design in a new build for the accountability chain behind those drawings.
Service penetrations
Before the pour, the plumber sets waste and stormwater penetrations, and the electrician may set conduit for underground supply or an EV charger. The concreter coordinates around that work but is not responsible for its position. This is the single most common source of expensive post-pour rework in Australian housing, and the fix is unglamorous: stand on the slab with the plumbing plan the day before the pour and check every outlet against the room it serves.
The pour
Concrete is delivered by agitator truck and placed into the formwork, usually via a boom or line pump. The concreter works the mix into the forms, consolidates it by vibration to remove air voids, then screeds the surface to level with a screed board or mechanical screeder. Bull floating and, for internal slabs, power trowelling follow once the bleed water has gone. Timing here is judgement, not procedure. Trowelling too early traps bleed water at the surface and causes delamination.
Curing
After the pour the concrete must be cured, meaning kept moist, for a minimum period to allow it to reach design strength. Standard practice is at least 7 days before significant loading. In cold weather, longer. In hot or windy conditions, wet hessian or a sprayed curing compound is required to prevent premature surface drying. Curing is the cheapest step in the whole process and the one most often skipped, because by the time the consequences appear the concreter has been paid and has left the site.
Concreter licensing and qualifications across Australia
Concreting occupies an awkward position in Australian trade regulation. Unlike electrical, plumbing and gas work, where licensing is comprehensive, consistent and personally held, concreting is regulated unevenly. In some states there is a specific licence class. In others, the concreter works under the head builder's licence and holds nothing of their own. The trade qualification is consistent nationally. The licensing is not.
The national trade qualification
The baseline qualification is the Certificate III in Concreting, delivered through registered training organisations and typically completed over a three to four year apprenticeship. It covers site preparation, formwork setting, reinforcement placement, concrete placement and compaction, finishing techniques including exposed aggregate and steel trowelling, curing, and the relevant Australian standards and safety requirements. Many working concreters in Australia do not hold it, having come up through on-site experience instead. That is not automatically a problem, but it means the qualification cannot be assumed and should be asked about directly.
Queensland
Queensland has the clearest position. The Queensland Building and Construction Commission issues licence classes covering concreting work, and building work above the QBCC low-value threshold requires the contractor to hold an appropriate licence. That applies to a slab pour on almost any new build. A Queensland concreter contracting directly to a homeowner for slab work should have a licence number you can check on the QBCC public register at qbcc.qld.gov.au.
New South Wales
NSW Fair Trading administers residential building licensing. Structural landscaping and concreting work carried out under a residential building contract above the NSW threshold requires a licence, either held by the concreter or by the builder engaging them. Where the concreter is a subcontractor to a licensed builder, the builder's licence covers the work and the builder carries the statutory warranty. Verify current requirements at fairtrading.nsw.gov.au.
Victoria
Victoria regulates building practitioners rather than issuing a standalone concreting licence. Concreting subcontractors generally work under the registered builder, who holds the registration and the domestic building insurance obligation. Where a homeowner engages a concreter directly for work above the domestic building contract threshold, the contractor requirements and insurance obligations change. Verify the current arrangement with the Building and Plumbing Commission (BPC) at vba.vic.gov.au.
Western Australia
In WA the Department of Mines, Industry Regulation and Safety oversees building services registration. Concreting is generally performed under the registered builder rather than under a separate trade registration, but the builder's registration and the home indemnity insurance position are both verifiable. Check at dmirs.wa.gov.au.
South Australia
South Australia administers building work contractor licensing through Consumer and Business Services. Concreting carried out as part of building work above the SA threshold falls within the building work contractor framework, and the licence sits with the contractor holding the building work. Verify at cbs.sa.gov.au.
Tasmania, ACT and the Northern Territory
Tasmania administers building trade licensing through Consumer, Building and Occupational Services (cbos.tas.gov.au), with concreting generally captured under the builder's licence rather than separately. The ACT regulates through Access Canberra (accesscanberra.act.gov.au) under the building practitioner framework. The Northern Territory operates through the Building Practitioners Board and NT WorkSafe (nt.gov.au). In all three, the practical verification target is the builder engaging the concreter rather than the concreter alone.
What to verify regardless of state
Because the licensing picture is inconsistent, the useful verification set is broader than a licence number. Ask for the Certificate III or evidence of equivalent trade background, a current public liability policy at a level appropriate to plant and pump work, current workers compensation cover for any employees, an active ABN, and, where a state licence applies, the licence number checked directly on the regulator's register rather than taken from a quote header.
For the wider pattern of trade verification across states, see how to check a builder's licence in Australia.
Australian standards governing concrete work
Three Australian standards do most of the work in residential concreting, and all three are referenced from the National Construction Code, which gives them effective mandatory status.
AS 2870 - Residential slabs and footings
AS 2870 is the controlling standard for residential slab and footing design in Australia. It links the site classification produced by the geotechnical report (A, S, M, H1, H2, E or P, describing reactive soil movement) to the slab and footing system required to accommodate that movement. Nearly every standard Australian house slab is designed under AS 2870, and the site classification is the input that drives edge beam depth, reinforcement and slab type. See soil testing and classification for how that classification is produced.
AS 3600 - Concrete structures
AS 3600 governs the design and construction of concrete structures generally, including cover to reinforcement, curing requirements, strength grades and durability provisions for different exposure classifications. Where a residential element falls outside the standard AS 2870 approach, such as a suspended slab, a large retaining wall or a heavily loaded footing, AS 3600 becomes the governing document and the element requires specific engineering design.
AS 1379 - Specification and supply of concrete
AS 1379 covers the supply side: how concrete is specified, batched, delivered, sampled and tested. It defines the standard strength grades (20, 25, 32 and 40 MPa are the common residential ones), the slump tolerances, and the documentation that must accompany each delivery. The delivery docket exists because of AS 1379, and it is the only independent evidence of what was actually poured into your slab. Ask for copies.
NCC references
The National Construction Code Volume Two, which covers Class 1 and 10 buildings including houses, references AS 2870 for slabs and footings and picks up AS 3600 for concrete structures generally. NCC provisions also drive the damp-proof membrane under the slab, termite management at penetrations and slab edges, and the finished floor level relative to external ground and flood planning levels. Those are all set at slab stage and all extremely difficult to change afterwards.
Why this matters for homeowners: AS 2870 compliance determines whether the slab can tolerate the soil it sits on, AS 3600 compliance determines durability over decades, and AS 1379 documentation is what proves the delivered concrete matched the specification. See structural engineers in Australia for who signs off on that design.
Concreter vs formworker vs builder vs pump operator
On a small residential site one crew may cover several of these roles, which is exactly why homeowners lose track of who is accountable for what. The distinctions matter most when something has gone wrong. Before any of these trades arrive, the site is shaped by the earthworks crew: see what an excavation contractor does for the stage that precedes formwork, steel fixing and the pour.
The concreter
The concreter places, compacts, screeds, finishes and cures the concrete. On most detached housing they also set the formwork and place the reinforcement, because the scale does not justify separate crews. Their accountability covers placement quality, surface finish, joint cutting and curing.
The formworker
On larger or more complex work, formwork is a separate trade. A formworker builds and props the mould system, sets levels, and is accountable for the form holding its shape and dimensions under the load of wet concrete. Suspended slabs, deep edge beams, complex stepped slabs and multi-level residential work are where dedicated formwork crews appear. Where formwork is a separate contract, a blowout during the pour is a formwork failure, not a concreting failure, and the demarcation should be clear in the contract before anyone starts. See what a formworker does in residential construction for the full scope, the standards involved and how stripping is authorised.
The builder
The builder engages the concreter, coordinates the certifier inspection, orders or approves the concrete supply, and carries statutory warranty for the finished work. If the slab fails, the homeowner's contractual position is almost always with the builder, not with the concreting subcontractor. That is why builder verification matters more than subcontractor verification on a project with a head builder.
The pump operator and the supplier
The concrete pump operator is usually a separate contractor with their own plant, insurance and safety obligations. They are responsible for the pump setup, line safety and placement reach. The batching plant supplies the mix to the specified grade under AS 1379 and is accountable for the mix itself, which is why the delivery docket is the pivot point in any strength dispute. If water was added on site after batching, the supplier's liability for a weak result largely disappears.
Where the handoffs go wrong
Three handoffs cause most residential disputes: plumber to concreter on penetration positions, engineer to concreter on reinforcement detail, and concreter to polisher on internal floor finish quality. In each case both parties assume the other has confirmed the detail. A single pre-pour walk-through with the builder, holding the structural drawings and the plumbing plan, closes all three.
Concrete finish types and applications
Finish selection drives both appearance and cost, and the premium sits on top of the base concreting rate rather than replacing it. The table below sets out the common residential finishes and what each costs relative to plain brushed concrete.
| Finish type | How it is achieved | Typical applications | Cost premium | Notes |
|---|---|---|---|---|
| Plain - brushed or broom finish | Surface is dragged with a broom while still plastic - creates a non-slip texture | Paths, utility areas, garage slabs | Baseline - no premium | Most common utility concrete finish |
| Steel trowel - smooth | Surface is trowelled smooth with a steel float - produces a dense smooth surface | Indoor concrete floors - polished concrete base | Low premium | Requires sealing or polishing for finished appearance |
| Exposed aggregate | Seeding aggregate into the surface or washing the surface before curing to expose the aggregate | Driveways, paths, patios - decorative concrete | $15 to $40 per m² premium | Popular in Australian residential - wide colour and aggregate range |
| Coloured concrete - oxide pigment | Oxide pigment added to the concrete mix before pouring | Driveways, paths, patios - colour-matched to the home | $10 to $30 per m² premium | Colour variation between pours is common - difficult to match repairs |
| Stamped or pattern imprinted | Pattern roller or stamp pressed into the surface while plastic | Decorative paving - mimics stone, tile or brick | $30 to $60 per m² premium | Higher maintenance - sealing required regularly |
| Honed - ground smooth | Surface ground after curing to produce a smooth aggregate-visible finish | Internal polished concrete floors | High premium | Grinding and polishing is separate to the concreter's scope |
Polished and honed concrete: where the concreter's scope ends
Polished concrete floors are one of the most requested internal finishes in Australian housing, and they are also the finish most likely to produce a scope argument. The reason is simple. The floor the homeowner sees is produced by a specialist polishing contractor, but its quality is largely determined by the concreter who poured the slab months earlier.
Inside the concreter's scope is the base slab: a correctly graded mix, careful placement, proper compaction so the aggregate is evenly distributed, tight control of surface flatness, and a steel trowel finish taken to the level of closure the polisher has specified. Curing matters more here than anywhere else, because a slab that has dried unevenly will grind unevenly. Joint layout is also a concreting decision with a permanent visual consequence, since saw cuts remain visible in the finished floor.
Outside the concreter's scope is everything that happens after curing. Grinding, densifying, honing, polishing to the specified gloss level and sealing are all carried out by a polishing contractor using planetary grinders and progressively finer diamond tooling. This is different plant, different consumables and a different trade skill set.
The honed versus polished distinction is worth understanding before you specify. Honed concrete is ground back to a flat matt or low-sheen surface, usually at a lower grit level, and then sealed. It exposes aggregate but does not develop a reflective finish. Polished concrete continues through finer grits with a chemical densifier to close the surface, producing mechanical gloss without a topical coating. Grind depth is the other variable: a cream finish removes almost nothing and shows minimal stone, a salt and pepper finish exposes fine aggregate, and a full exposure finish cuts deep enough to reveal the large stone. Full exposure is the least forgiving of a poorly placed slab, because uneven aggregate distribution becomes the visible pattern of the floor.
The practical instruction is to make the polisher's specification part of the concreter's scope in writing before the slab is poured, including the required flatness tolerance, the trowel finish level, the joint layout and the curing method. See polished concrete floors in Australia for finish levels, cost per square metre and what to check before committing.
Driveways, paths and what concreting costs
The concreter typically returns during or after lock-up to pour external concrete: driveways, paths and alfresco slabs. This concrete does not carry building loads in the way the slab does, but it still needs correct specification and installation to perform durably, and it is the concrete the owner will look at every day.
Key driveway considerations
- Concrete strength. Residential driveways should be specified at a minimum of 25 MPa to resist vehicle loading, with 32 MPa common where heavier vehicles or poor subgrade are involved.
- Reinforcement. Residential driveways are typically reinforced with F72 or F82 mesh for crack control, positioned on chairs rather than pulled up during the pour.
- Drainage fall. The driveway must drain away from the building, with a minimum 1 in 60 fall toward the street or a nominated drainage point.
- Control joints. Saw-cut or formed joints control cracking. Without them concrete cracks unpredictably. Spacing is typically 3 to 4 metres in each direction.
- Thickness. Standard residential driveways are typically 100mm, thicker under heavy vehicle areas or where ground conditions are poor.
Indicative concreting rates
Rates vary substantially by state, site access, subgrade condition and volume, and the figures below are indicative planning ranges rather than quotes. As a general rule, small pours cost more per square metre than large ones because setup, plant hire and minimum truck loads are fixed costs spread over less area.
- Structural slab, supply and lay. Roughly $90 to $160 per square metre for a standard waffle or raft slab on a straightforward site, covering formwork, pods, mesh, concrete, pump and finish. Site classifications of H1 and above, sloping sites and deep edge beams push this higher.
- Plain brushed driveway or path. Roughly $80 to $130 per square metre including excavation, sub-base preparation, mesh, 100mm of concrete and a broom finish.
- Exposed aggregate driveway. Roughly $110 to $170 per square metre once the finish premium is applied.
- Small pours under about 20 square metres. Expect a premium of 20 to 40 per cent per square metre against the ranges above, or a fixed minimum charge.
- Concrete pump hire. Commonly $800 to $1,600 for a residential pour depending on boom size and duration, and often quoted as a separate line.
Any quote worth comparing states the concrete grade, the mesh grade, the slab thickness, whether the pump is included and whether excavation and spoil removal are included. Two quotes that differ by 30 per cent usually differ on those five lines rather than on labour. See the construction stage explained step by step for where these pours fall in the programme.
Common concrete defects in new builds
Concrete defects tend to surface on a delay. Some appear within days, some within the first summer, and some only once the house has been through a full wet and dry cycle on reactive clay. Knowing what each looks like is the difference between raising a defect inside the warranty period and living with it.
Cracking
Not all cracks are defects. Fine shrinkage cracking is normal in concrete as it dries. What matters is width, pattern and location. Plastic shrinkage cracks appear within hours of the pour as short random surface cracks, usually caused by rapid drying in hot or windy conditions and preventable with proper curing. Drying shrinkage cracking appears over weeks and is largely controlled by joint spacing. Structural cracking, which is wider, progressive, stepped or accompanied by vertical displacement, is a different category and needs engineering assessment rather than a patch.
Delamination and surface failure
Delamination is a thin surface layer separating from the concrete beneath, and it sounds hollow when tapped. It is caused by trowelling before bleed water has escaped, sealing a layer of water under a closed surface. Related failures include dusting, where the surface releases fine powder underfoot because the surface was overworked or water was added late, and scaling, where the surface flakes away. All three are placement and finishing failures rather than mix failures.
Incorrect falls and ponding
External concrete that does not fall away from the building sends water to the base of the wall, into the slab edge and eventually into the frame. Ponding on an alfresco slab or a flat driveway section is the visible symptom. Incorrect step-down between internal floor level and external concrete is the related defect, and it can compromise both weatherproofing and termite inspection access. Falls are set in the formwork, so this is entirely preventable and almost impossible to fix cheaply afterwards.
Curing failures
A slab that was not cured properly has lower surface strength than the design assumed, cracks more, dusts more and takes finishes poorly. There is no visible moment where this goes wrong, which is why it is so common. On a polished floor the consequence appears as uneven grinding and patchy colour. On a driveway it appears as early surface wear.
Honeycombing and cover failures
Honeycombing is visible voiding, usually at slab edges, caused by insufficient vibration or a mix that was too stiff. It looks cosmetic but exposes reinforcement to moisture. Insufficient cover to reinforcement, caused by chairs that were too low or mesh trodden down during the pour, produces the same long term outcome: corroding steel, expansion and spalling concrete, typically fifteen to thirty years later.
What to do about a suspected defect: photograph it with a scale reference, record the date it appeared, raise it in writing with the builder inside the defects liability period, and ask for the delivery dockets and the engineer's inspection records. See the building a house checklist for the surrounding record-keeping habits.
What to check before and after the concrete pour
These are the checks that actually change outcomes, grouped by when they need to happen. Tick them off as you go.
Before the structural slab pour
Confirm the building certifier has completed the slab inspection - do not allow pouring without this confirmation
Confirm waste outlet positions against the plumbing plan - position errors are permanent after the pour
Photograph the reinforcement before concrete is poured - your own record of what was installed
Confirm the drainage penetrations are in the correct positions
Confirm waffle pod layout matches the structural drawings
Confirm the formwork dimensions match the structural drawings - edge beam width and depth
Confirm the concrete strength grade on the delivery docket matches the engineer's specification
After the structural slab pour
Do not allow machinery traffic on the fresh slab for at least 7 days - premature loading affects strength development
In hot weather confirm curing measures are in place - wet hessian or curing compound
After curing - inspect the slab edge for any visible honeycombing - cavities in the concrete indicating consolidation problems
Ask for the concrete delivery dockets and any test results to be added to your project file
Before driveway and path pours
Confirm sub-base preparation and compaction
Confirm drainage fall direction is away from the building
Confirm control joint positions are marked - or confirm saw-cutting schedule after pour
Confirm the finish type is as specified - and the aggregate type and colour if exposed aggregate
Confirm the slab thickness and mesh grade match the quote before the pour begins
Before you engage the concreter
Confirm the trade qualification or equivalent background, the state licence where one applies, current public liability and workers compensation cover, an active ABN, and references from recent residential slab work rather than commercial or civil projects. Ask which Australian standards apply to your slab and expect AS 2870 to come up without prompting. If it does not, keep looking.
Red flags when hiring a concreter
Concreting is a trade where the window to notice a problem is measured in hours. Once the trucks have left, most of what went wrong is invisible. Anything on this list is a reason to slow down and, in most cases, to engage someone else.
Warning signs
- Concrete poured before the slab inspection. If the certifier has not inspected the reinforcement and formwork, nobody has independently confirmed the most important element of the build. Stop the pour.
- Waste outlet positions not confirmed against the plans. A misplaced penetration is permanent. Confirming positions takes fifteen minutes and saves a jackhammer.
- Pouring in adverse weather without protection. Heavy rain, extreme heat or strong drying wind all damage surface strength. A concreter who shrugs at the forecast is transferring the risk to you.
- No drainage fall away from the building. Flat or reverse-falling external concrete directs water to the base of the wall. It is a weatherproofing problem, not a cosmetic one.
- No control joints planned for driveways or paths. Cracking is predictable without joints. Any concreter who says joints are optional is quoting a driveway that will crack.
- Cannot confirm the concrete strength specification. The engineer specifies a grade. The concreter should be able to state it without checking, and the delivery docket should match it.
- Refusal to provide delivery dockets. Dockets record the mix, the grade, the batch time and the slump. They are the only independent evidence of what was actually poured.
- No licence detail where the state requires one. Where a licence is required for the contract value and work type, an evasive answer is the answer. Verify with the state authority instead.
- No public liability or workers compensation cover. Pump lines, agitator trucks and power float plant carry real risk. Cover is not negotiable on a residential site.
- Water added to the truck on site to make the mix easier. Adding water beyond the design mix reduces strength and increases shrinkage cracking. It is one of the most common causes of a weak surface.
- Cash-only pricing for a substantial pour. No paperwork means no warranty position, no insurance trail and nothing to hand to the next owner.
- No documentation handover at completion. Dockets, inspection records and the engineer's certification should reach you at handover, not months later when a crack has already appeared.
BUILTLY and lasting project records
Concreting is the clearest argument for structured project records in Australian housing. The slab is the single most consequential element of the build, it is inspected once and then buried, and the evidence that it was built correctly exists only as paper: the geotechnical report and its site classification, the engineer's slab design under AS 2870, the certifier's slab inspection record, the concrete delivery dockets showing grade and batch time under AS 1379, and any test results. Every one of those documents matters, and almost none of them survive in a usable form five years after handover.
What that costs is real. A homeowner who notices cracking in year six has no way to demonstrate what strength was poured or whether the slab matched the site classification. A buyer inspecting the house cannot tell whether the slab was designed for H2 reactive clay or for the sandy site the vendor describes. And a concreter with twenty years of sound slabs behind them has no way to point at that record, because the work is invisible by design and the paperwork sits in someone else's filing.
BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
For homeowners, the same record works in the other direction. The slab documentation stays with the property, alongside the geotechnical, structural and inspection records, so the next conversation about a crack starts with evidence rather than recollection. BUILTLY is heading toward a 2026 launch. Until then, the guide library, including the complete guide to building a house in Australia, is the active value for anyone navigating a build right now.
Frequently asked questions
What does a concreter do in residential construction in Australia?
A concreter in residential construction prepares, pours and finishes all concrete elements of the project, primarily the structural slab and footing system that the building sits on, but also external elements including the driveway, paths, alfresco slabs and any concrete retaining walls. The structural slab is the concreter's most consequential work. It is poured only after the mandatory slab inspection by the building certifier, who confirms the formwork, reinforcement placement and drainage penetrations are correct before concrete arrives on site.
Do concreters need a licence in Australia?
It depends on the state and on the contract value. Concreting is not licensed as a standalone trade in the same comprehensive way as electrical or plumbing work. In Queensland, the QBCC issues concreting-related licence classes and work above the low-value threshold requires a licence. In New South Wales, structural concreting carried out under a residential building contract above the NSW Fair Trading threshold requires a licence or must be performed under a licensed builder. Victoria, South Australia, Tasmania, the ACT and the Northern Territory generally regulate the head builder rather than the concreting subcontractor, and Western Australia regulates through the building services registration framework. The consistent national reference point is the Certificate III in Concreting.
What happens at the slab inspection before the concrete pour?
The building certifier or inspector visits the site before concrete is poured and confirms that reinforcement placement, bar sizes and spacing match the structural drawings, that formwork dimensions and excavation depth match the structural specification, that drainage penetrations are in the correct positions and that the waffle pod layout, on waffle slab construction, matches the structural drawings. No concrete should be poured without this inspection being completed. The slab inspection is the last opportunity to identify and correct errors before they are permanently buried in the slab.
What concrete finish should I choose for my driveway?
Exposed aggregate is the most popular residential driveway finish in Australia, because it is durable, non-slip and available in a wide range of aggregate types and colours. It carries a $15 to $40 per square metre premium over plain brushed concrete. Plain brushed concrete is the most economical option, functional and durable but less decorative. Coloured concrete with oxide pigment sits in the middle at a $10 to $30 per square metre premium. Stamped or pattern imprinted concrete is the most decorative option but requires regular sealing and carries a higher long term maintenance requirement.
How long does concrete need to cure before it can be used?
Standard residential concrete requires a minimum of 7 days of curing, meaning the surface is kept moist, before any significant loading is applied. For the structural slab this typically means frame erection cannot commence for at least 7 days after the pour. In cold weather, longer curing may be required to achieve design strength. In hot weather, additional curing measures such as wet hessian or a curing compound are required to prevent the surface drying too quickly, which reduces surface strength and increases cracking risk. For driveways, light foot traffic can typically commence after 24 to 48 hours but vehicle traffic should be avoided for at least 7 days.
Is polishing a concrete floor part of the concreter's scope?
Usually not. The concreter pours and steel trowels the base slab to the flatness and finish quality the polisher needs, and that base work sits squarely inside the concreting scope. The grinding, honing, densifying and polishing that produce the final floor are carried out by a specialist concrete polishing contractor with different plant and a different skill set. The practical risk is the handover between the two. If the base slab is poured without the polisher's requirements written into the specification, the finished floor may show trowel marks, uneven aggregate exposure or joint locations in the wrong place.
What are control joints in a concrete driveway and why do they matter?
Control joints are saw-cut or formed grooves in the concrete surface, typically 25mm to 30mm deep, that create a deliberate weak plane in the slab. Concrete shrinks as it cures and moves with temperature change. If it cannot crack at a controlled location it will crack unpredictably. Control joints direct cracking to the joint lines rather than allowing random cracking across the surface. For a residential driveway, control joints should be spaced at 3 to 4 metre intervals in both directions. A driveway without control joints will crack, typically within the first 12 to 24 months.