Advice

First Home Owner Grants in Australia: a state-by-state guide.

Last updated: October 2026 ·

The First Home Owner Grant in Australia is not a single national scheme but eight separate state and territory schemes, each administered by the relevant state revenue office, each with its own eligibility framework, value caps, payment amounts and application pathway. Sitting alongside the state schemes are several federal programs (the Home Guarantee Scheme, Help to Buy, the First Home Super Saver Scheme) that change the deposit and equity position rather than providing cash, and a layer of state stamp duty concessions that often deliver more financial benefit than the cash grant itself. This guide explains how the system works, how the schemes interact, what each state and territory offers in structural terms, and where to verify the current amounts before relying on them in the affordability plan.

First Home Owner Grants in Australia: how the system works

The First Home Owner Grant (FHOG) is administered by state and territory revenue offices, not by the federal government. The original framework was introduced in 2000 to offset the impact of the GST on housing affordability, with each state legislating its own scheme under broadly aligned principles. Over the two and a half decades since, the schemes have diverged significantly: each state now sets its own grant amount, its own eligibility framework, its own property value cap, its own treatment of new builds versus established homes, and its own application and payment process. The result is that two first home buyers purchasing equivalent properties in different states can receive substantially different total support packages, and the answer to "what does the FHOG provide?" depends entirely on which state the property is in.

Most state schemes share a common eligibility spine: the applicant must be an Australian citizen or permanent resident, must be at least eighteen years old, must not have previously owned residential property as a principal place of residence anywhere in Australia, must intend to occupy the new property as their principal place of residence within a prescribed period after settlement or completion, and must remain in occupation for a minimum continuous period. Beyond this common spine, the variation is substantial: some states extend the grant to established homes, others limit it strictly to new builds; some apply income tests, others do not; some have property value caps that bite at relatively modest price points, others have no cap at all on certain build types.

The honest framing for any guide on this topic is that the specific dollar amounts change with state budgets, often annually and sometimes mid-year. A guide that publishes specific FHOG figures as authoritative will be wrong within twelve months of publication for at least one state. The structural framework changes more slowly than the amounts, which is what this guide focuses on; the amounts themselves should always be verified at the relevant state revenue office before being relied on in the affordability calculation. The authoritative URLs are listed in each state section below: Revenue NSW (revenue.nsw.gov.au), State Revenue Office Victoria (sro.vic.gov.au), Queensland Revenue Office (qro.qld.gov.au), RevenueWA (wa.gov.au), RevenueSA (revenuesa.sa.gov.au), State Revenue Office Tasmania (sro.tas.gov.au), Territory Revenue Office (nt.gov.au) and the ACT Revenue Office (revenue.act.gov.au). For the build-side context that the grant sits within, the BUILTLY guides on the first home buyer building guide and how construction loans work in Australia cover the broader pathway.

Federal schemes that interact with state grants

Three federal schemes sit alongside the state First Home Owner Grants and interact with them in the typical first home buyer's affordability plan. None of the three replaces the state grant; they operate on different mechanisms and address different parts of the deposit and finance position. Eligible first home buyers can usually combine one or more federal schemes with the relevant state grant, with the combined effect being meaningfully larger than any single scheme in isolation.

The Home Guarantee Scheme is administered by Housing Australia and provides a federal government guarantee on the deposit shortfall for eligible buyers, allowing them to purchase with a deposit as low as 5% without paying Lenders Mortgage Insurance. The scheme operates through participating lenders rather than directly with the buyer, with the lender confirming HGS eligibility as part of the loan assessment alongside the construction loan structure covered in the BUILTLY guide on how construction loans work in Australia. There are several streams: the First Home Guarantee for first home buyers generally (which was previously known as the First Home Loan Deposit Scheme, a renaming worth noting because older content still refers to the previous name), the Regional First Home Buyer Guarantee for first home buyers in regional areas with adjusted property price caps, and the Family Home Guarantee for single parents with at least one dependent child (which permits prior home ownership and is therefore a different eligibility pool). Property price caps vary by region; verify current parameters at housingaustralia.gov.au and confirm the lender is a participating lender. Where the grant is being combined with a 5% deposit on a new build, the BUILTLY guide on building on a 5% deposit covers what to verify before signing the building contract.

Help to Buy is a more recent federal scheme that operates on a shared equity basis: the federal government takes an equity stake in the property in exchange for reducing the buyer's loan requirement. The scheme has its own eligibility tests including income caps and property price caps, and the equity-share mechanism means the buyer's eventual capital position is different from a standard mortgage purchase. The First Home Super Saver Scheme is administered by the ATO and allows eligible first home buyers to release voluntary super contributions and associated earnings to use as part of the deposit on a first home, including a home being built. The FHSS has its own contribution caps, withdrawal caps and timing rules; verify the current parameters at ato.gov.au and engage a registered tax agent if the contribution position is material to the deposit plan.

The interaction between the federal and state schemes is generally additive: an eligible first home buyer can use the Home Guarantee Scheme to access the loan with a low deposit, withdraw super under the FHSS to bolster the deposit position, claim the relevant state First Home Owner Grant where the property qualifies, and apply for the state stamp duty concession at settlement. Each scheme has its own eligibility test and its own application process, and approval under one does not guarantee approval under another. Application sequencing matters: the FHSS withdrawal request goes through the ATO before settlement, the HGS eligibility is confirmed at loan application, and the state grant is typically processed at first drawdown or settlement through the lender or directly with the state revenue office.

Common eligibility requirements across all states

While the specifics vary state by state, several eligibility elements appear in substantially the same form across all eight Australian jurisdictions. Understanding the common spine before drilling into the state-specific differences makes it easier to identify which state's variations matter for a given buyer. The personal eligibility tests turn on citizenship status, age, prior ownership and personal capacity to apply. The property eligibility tests turn on owner-occupier status, occupation timing, property type and (in most states) value cap. The co-applicant tests turn on the eligibility of any spouse or partner being assessed alongside the primary applicant.

On personal eligibility, every state requires the applicant to be an Australian citizen or permanent resident at the time of application, to be at least eighteen years old (with limited exceptions where the state revenue office grants a discretionary waiver), and to be applying in their personal capacity rather than through a corporate entity or trust. The prior ownership test is the most consequential and the most commonly misunderstood: the applicant must not have previously owned residential property in Australia as a principal place of residence. Some states extend the disqualifier to include any prior residential ownership including investment property, others draw a distinction between principal-place-of-residence ownership (which disqualifies) and pure investment ownership (which may not). Confirm the specific test for the relevant state.

On property eligibility, the property must be a residential property that the applicant will occupy as their principal place of residence within a prescribed period after settlement or completion (typically six to twelve months) and that they will continue to occupy for a minimum continuous period (commonly six to twelve months again, varying by state). Most states distinguish between new builds and established homes for the cash grant, with many states limiting the FHOG strictly to new builds; the stamp duty concession often applies more broadly. Property value caps apply in most states and are revised periodically with state budgets.

On co-applicant eligibility, where the property is being purchased jointly, all co-applicants must typically meet the eligibility tests in their own right. The most common rejection trigger in practice is a spouse or de facto partner with prior property ownership: in most states the test extends to the partner regardless of whether the partner is on the contract, on the loan or claiming the grant. The reasoning is that the grant is intended for households entering home ownership for the first time, not for households where one party has previously owned. Time-bound considerations also apply: applications must typically be lodged within a prescribed window after contract signing, and grants are generally limited to one per applicant per lifetime across all Australian states.

New build vs established home: how it affects your grant

Most state First Home Owner Grants apply to new builds rather than to established homes. The policy rationale is that the cash grant is designed to stimulate construction sector activity rather than simply to subsidise property purchase generally; directing the grant to new dwellings increases housing supply, supports the construction workforce and aligns with the broader housing policy direction of state and federal governments. The result is that the build pathway typically attracts a larger total scheme package than the established home pathway, even where the headline price of the established home is similar to the build cost.

What counts as a "new build" varies by state but generally includes: a house-and-land package where the dwelling has not previously been occupied; vacant land combined with a new construction contract for a dwelling on that land; an off-the-plan apartment or townhouse where the construction has not been completed at the time of contract; a substantially renovated property in some jurisdictions where the renovation meets defined thresholds; and a knockdown-rebuild on a lot the buyer already owns or is purchasing concurrently. The treatment of substantially renovated properties is the most variable across states, with some jurisdictions accepting them and others excluding them; verify the position with the relevant state revenue office before relying on a renovation as a qualifying new build.

Established homes (previously occupied residential properties) are generally excluded from the cash grant in most states, although some states historically offered a smaller grant for established home purchases under separate legacy schemes. The stamp duty concessions for first home buyers, by contrast, often apply across both new and established categories, with the cap and the structure varying. The practical implication for first home buyers comparing pathways is that the build pathway typically attracts both the cash grant and a (sometimes more generous) stamp duty concession, while the established pathway typically attracts only the stamp duty concession. The combined value gap can be substantial enough to shift the affordability case in favour of building, even after accounting for the time and risk premium of construction.

Trade-offs apply on both sides. The build pathway delivers a larger total scheme package but carries a longer timeline (typically nine to eighteen months on site after a pre-construction phase of two to four months), parallel rent and construction loan interest during the build, and the construction risk position. The established pathway delivers immediate occupancy, a known dwelling and no construction risk, but with a smaller total scheme package and a property that reflects its build-era standards rather than current code. The BUILTLY guide on the new home vs established home comparison covers the broader trade-off in detail.

Stamp duty concessions for first home buyers

Stamp duty (called transfer duty in some states) is the single largest transaction cost in an Australian property purchase outside the price itself, and the first home buyer concessions on stamp duty are often more financially significant than the cash First Home Owner Grant. Every state and territory operates some form of stamp duty concession or exemption for eligible first home buyers, with the structure varying substantially: some states use threshold-based full exemption (no stamp duty payable below a defined value), some use threshold-based phased concession (reduced stamp duty up to a defined value, then standard rate above), some apply different thresholds to new builds versus established homes, and some offer additional concessions for off-the-plan purchases or vacant land for owner-occupier construction.

The build-specific concessions are worth understanding because they affect both the timing and the pathway choice. Vacant land purchased for owner-occupier construction is treated concessionally in most states, sometimes with full exemption below defined thresholds. House-and-land packages are typically treated under the standard first home buyer concession, though the calculation may apply only to the land component if the build contract is separately documented. Off-the-plan apartments and townhouses often attract additional concessions where the contract is signed before construction is complete, with the concession sometimes calculated on the value at the time of contract rather than the value at completion (a meaningful saving where construction takes substantial time and the market moves).

The honest framing for stamp duty concessions is the same as for the FHOG: thresholds and structures change with state budgets, often annually and sometimes mid-year, and a guide that publishes specific dollar thresholds will be inaccurate within twelve months for at least one state. The structural categories are stable enough to publish (full exemption, phased concession, off-the-plan treatment, vacant land treatment), but the dollar values should be verified at the relevant state revenue office before being relied on in the affordability calculation. The state revenue office URLs listed in the each-state sections below are the authoritative source.

The application process for stamp duty concessions is generally handled at settlement by the buyer's conveyancer or solicitor, who lodges the relevant declaration and supporting documentation with the state revenue office and applies the concession against the duty payable. The buyer's responsibility is to provide accurate eligibility information (citizenship and residency status, prior ownership history, intended occupation status, partner's circumstances) to the conveyancer in advance of settlement. Inaccurate or incomplete information at settlement can result in the concession being denied at the time and the full duty being payable on settlement, with rectification through a refund process being slower and more involved than getting the application right at first lodgement.

New South Wales: Revenue NSW

New South Wales administers its first home buyer schemes through Revenue NSW (revenue.nsw.gov.au), which is the authoritative source for the current scheme structure, eligibility tests, value caps and application pathway. The active first home buyer schemes in NSW include the First Home Owner Grant (NSW), which is the cash grant typically directed to new builds; the First Home Buyers Assistance Scheme, which provides stamp duty exemption or concession for eligible first home buyers; and the Shared Equity Home Buyer Helper, which is the state-administered shared equity arrangement for eligible buyers (verify current status and eligibility at Revenue NSW because NSW has historically had multiple iterations of shared equity arrangements that have been wound back, modified or replaced).

Eligibility under the NSW schemes follows the common spine: Australian citizenship or permanent residency, eighteen or older, no prior residential ownership in Australia as a principal place of residence, intention to occupy as principal place of residence within the prescribed period and to remain in occupation for the prescribed minimum continuous period. The First Home Owner Grant in NSW is generally available for new builds (house-and-land, vacant land plus new construction contract, off-the-plan, qualifying knockdown-rebuild), while the First Home Buyers Assistance Scheme stamp duty concession applies more broadly across new and (in some structures) established home purchases.

The application pathway for the FHOG in NSW is most commonly through the buyer's approved lender at first drawdown for a build or at settlement for a qualifying purchase, with the lender lodging the application on the buyer's behalf and the grant credited against the loan. Direct application to Revenue NSW is available where the buyer is not using an approved lender or where the timing of the application requires it. The First Home Buyers Assistance Scheme stamp duty concession is claimed at settlement through the buyer's conveyancer or solicitor, who lodges the relevant declaration with Revenue NSW.

Two NSW-specific points are worth noting. First, NSW has historically had a more frequently modified scheme landscape than most other states, with sub-schemes such as the First Home Buyer Choice property tax option having been introduced and subsequently wound back. Buyers relying on legacy information about NSW schemes should verify the current state of any specific scheme at Revenue NSW before relying on it. Second, the property value caps in NSW reflect the higher Sydney market and may bite at different price points to those in other states. Verify current grant amounts, value caps, eligibility details and application requirements at revenue.nsw.gov.au.

Victoria: State Revenue Office Victoria

Victoria administers its first home buyer schemes through the State Revenue Office Victoria (sro.vic.gov.au), which is the authoritative source for the current scheme structure, eligibility tests, value caps and application pathway. The active first home buyer schemes in Victoria include the First Home Owner Grant, which is the cash grant typically directed to new builds; the First Home Buyer Duty Exemption, which provides full stamp duty exemption for eligible first home buyers below a defined value; the First Home Buyer Duty Concession, which provides phased concession above the exemption threshold up to a higher cap; the off-the-plan concession, which is timing-sensitive and applies to qualifying off-the-plan purchases; regional Victoria schemes where applicable; and the Victorian Homebuyer Fund, which is the state-administered shared equity arrangement.

Eligibility under the Victorian schemes follows the common spine of citizenship or permanent residency, age, no prior Australian residential ownership and principal-place-of-residence occupation. The Victorian scheme structure typically favours new builds significantly through both the FHOG and the more generous stamp duty treatment for new construction. The off-the-plan concession is one of the structural features that distinguishes Victoria from some other jurisdictions, with the duty assessment based on the value at the time of contract rather than the value at completion for qualifying off-the-plan purchases (which can be a meaningful saving in a rising market over the construction period).

The application pathway for the FHOG in Victoria is through the buyer's approved lender at first drawdown or settlement, or directly to the State Revenue Office Victoria where the lender pathway is not used. The stamp duty exemption or concession is claimed at settlement through the buyer's conveyancer, who lodges the eligibility declaration with the State Revenue Office Victoria. The Victorian Homebuyer Fund has its own application process administered through the participating program rather than through the standard FHOG channel.

A Victoria-specific point worth noting is the policy direction on residential gas use: Victoria has progressively moved toward all-electric requirements for new residential builds, with restrictions on new gas connections in new dwellings introduced from January 2024. The policy has implications for design decisions on new builds (electrification of cooking, heating, hot water and pool heating) but does not change FHOG eligibility directly; it does affect the build cost and specification position that the grant is calculated against. Verify current grant amounts, value caps, eligibility details and application requirements at sro.vic.gov.au.

Queensland: Queensland Revenue Office

Queensland administers its first home buyer schemes through the Queensland Revenue Office (qro.qld.gov.au), which is the authoritative source for the current scheme structure, eligibility tests, value caps and application pathway. The active first home buyer schemes in Queensland include the First Home Owner Grant, which is the cash grant typically directed to new builds; and the First Home Concession, which provides stamp duty (transfer duty) concession for eligible first home buyers across a range of property types and values. Regional Queensland eligibility variations may apply for some scheme components.

Eligibility under the Queensland schemes follows the common spine of citizenship or permanent residency, age, no prior Australian residential ownership as a principal place of residence and principal-place-of-residence occupation within the prescribed period after settlement or completion. The First Home Owner Grant in Queensland is generally available for new builds including house-and-land packages, vacant land combined with a new construction contract, off-the-plan apartments and townhouses, and qualifying knockdown-rebuild projects. The First Home Concession on transfer duty applies more broadly to first home buyer purchases, with the concession structure varying by property value bracket.

The application pathway for the FHOG in Queensland is most commonly through the buyer's approved lender at first drawdown for a build or at settlement for a qualifying purchase, with the lender lodging the application on the buyer's behalf and the grant credited against the loan. Direct application to the Queensland Revenue Office is available where the lender pathway is not used or where the application timing requires it. The First Home Concession on transfer duty is claimed at settlement through the buyer's conveyancer, who lodges the declaration with the Queensland Revenue Office.

Queensland operates a particularly active building activity market, with the Queensland Building and Construction Commission (QBCC) responsible for builder licensing, insurance and consumer protection across the state. First home buyers in Queensland should verify their chosen builder's QBCC licence as part of the pre-contract diligence; the BUILTLY guide on the QBCC licence check Queensland covers the verification process, and the guide on how to choose a builder in Brisbane covers the broader market context. Verify current grant amounts, value caps, eligibility details and application requirements at qro.qld.gov.au.

Western Australia: RevenueWA

Western Australia administers its first home buyer schemes through RevenueWA (the relevant pages are accessed via wa.gov.au), which is the authoritative source for the current scheme structure, eligibility tests, value caps and application pathway. The active first home buyer schemes in WA include the First Home Owner Grant, which is the cash grant typically directed to new builds; the First Home Owner Rate of Duty, which provides concessional stamp duty rates for eligible first home buyers across qualifying property types; and Keystart, which is a state-backed lending scheme designed to support eligible buyers who do not qualify for traditional bank finance. Various supplementary WA schemes may also apply at different times.

Eligibility under the WA schemes follows the common spine of citizenship or permanent residency, age, no prior Australian residential ownership as a principal place of residence and principal-place-of-residence occupation. WA-specific residency requirements apply to some scheme components, and these residency tests can be more detailed than in some other jurisdictions; verify the specific residency test for the relevant scheme at RevenueWA before relying on eligibility. The First Home Owner Grant in WA is generally available for new builds, with the standard new-build categories (house-and-land, vacant land plus construction contract, off-the-plan, knockdown-rebuild) recognised. The First Home Owner Rate of Duty applies more broadly to first home buyer purchases.

Keystart is a structurally distinctive feature of the WA market, operating as a state-backed lender for eligible buyers who would not otherwise meet standard bank lending criteria. Keystart loans typically have lower deposit requirements than mainstream lenders and are intended as a stepping-stone product, with the buyer expected to refinance to a mainstream lender once their equity position and serviceability allow. Eligibility for Keystart is income-tested and property-value-tested, and the application process is separate from the FHOG application. Keystart can be combined with the FHOG and the stamp duty concession where the buyer qualifies for each scheme independently.

The application pathway for the FHOG in WA is through the buyer's approved lender at first drawdown for a build or at settlement for a qualifying purchase, or directly through RevenueWA where the lender pathway is not used. The First Home Owner Rate of Duty is applied at settlement through the buyer's conveyancer, who lodges the relevant declaration. Verify current grant amounts, value caps, residency requirements, eligibility details and application requirements at wa.gov.au.

South Australia: RevenueSA

South Australia administers its first home buyer schemes through RevenueSA (revenuesa.sa.gov.au), which is the authoritative source for the current scheme structure, eligibility tests, value caps and application pathway. The active first home buyer schemes in SA include the First Home Owner Grant, which is the cash grant typically directed to new builds; various forms of stamp duty relief for eligible first home buyers; and HomeStart Finance, which is the state-administered lending scheme designed to support eligible buyers with lower deposit positions or non-standard income profiles than mainstream bank lending typically accepts.

Eligibility under the SA schemes follows the common spine of citizenship or permanent residency, age, no prior Australian residential ownership as a principal place of residence and principal-place-of-residence occupation. The First Home Owner Grant in SA is generally available for new builds across the standard new-build categories. The stamp duty relief structure in SA has been revised at various points; the current structure may apply to a broader pool of first home buyers than the cash grant, with the concession or exemption calculated against the property value at settlement.

HomeStart Finance is the SA equivalent of the WA Keystart product, operating as a state-backed lender for eligible buyers who would not otherwise meet standard bank lending criteria. HomeStart has its own income tests, property value tests and lending criteria, and applications are processed separately from the FHOG application. HomeStart can be combined with the FHOG and stamp duty relief where the buyer qualifies for each scheme independently, and is worth investigating for buyers who have been declined by mainstream lenders or who are working with a non-standard income profile (self-employed, contract-based, recent migration).

The application pathway for the FHOG in SA is through the buyer's approved lender at first drawdown for a build or at settlement for a qualifying purchase, or directly through RevenueSA where the lender pathway is not used. Stamp duty relief is claimed at settlement through the buyer's conveyancer. The BUILTLY guide on how to choose a builder in Adelaide covers the SA market context for buyers considering the build pathway. Verify current grant amounts, value caps, stamp duty thresholds, eligibility details and application requirements at revenuesa.sa.gov.au.

Tasmania: State Revenue Office Tasmania

Tasmania administers its first home buyer schemes through the State Revenue Office Tasmania (sro.tas.gov.au), which is the authoritative source for the current scheme structure, eligibility tests, value caps and application pathway. The active first home buyer schemes in Tasmania include the First Home Owner Grant, which is the cash grant typically directed to new builds; and the First Home Buyer Duty Concession, which provides stamp duty concession for eligible first home buyers. The Tasmanian FHOG amount has historically been set at a higher level than several mainland states for some periods, reflecting state policy direction toward construction sector activity, but the specific amount changes with state budgets and should be verified at the State Revenue Office Tasmania.

Eligibility under the Tasmanian schemes follows the common spine of citizenship or permanent residency, age, no prior Australian residential ownership as a principal place of residence and principal-place-of-residence occupation. The First Home Owner Grant in Tasmania is generally available for new builds across the standard new-build categories (house-and-land, vacant land plus construction contract, off-the-plan, knockdown-rebuild). The First Home Buyer Duty Concession applies more broadly to first home buyer purchases, with the concession structure varying by property value.

The application pathway for the FHOG in Tasmania is through the buyer's approved lender at first drawdown or settlement, or directly through the State Revenue Office Tasmania where the lender pathway is not used. The duty concession is claimed at settlement through the buyer's conveyancer, who lodges the declaration with the State Revenue Office Tasmania.

Tasmania-specific considerations affect the practical context for the schemes. Bass Strait freight costs add to material delivery costs for new builds in Tasmania compared with mainland equivalents, which affects the per-square-metre build cost and therefore the property value the FHOG is calculated against. The smaller market dynamics also affect builder selection: there are fewer volume builders operating in Tasmania than in the larger mainland states, and buyer diligence on builder credentials is correspondingly important. The BUILTLY guides on how to check a builder's licence in Tasmania and how to choose a builder in Hobart cover the Tasmanian market context. Verify current grant amounts, value caps, eligibility details and application requirements at sro.tas.gov.au.

Northern Territory: Territory Revenue Office

The Northern Territory administers its first home buyer schemes through the Territory Revenue Office (the relevant pages are accessed via nt.gov.au), which is the authoritative source for the current scheme structure, eligibility tests, value caps and application pathway. The NT scheme landscape has changed more frequently than in most southern states, with various supplementary schemes (HomeGrown Territory Grant, BuildBonus and similar territory-specific arrangements) being introduced, modified and replaced over time. Verify the current named schemes at the Territory Revenue Office before relying on legacy information.

The active first home buyer schemes in the NT typically include a territory-specific home owner grant for new builds and a Territory Home Owner Discount or equivalent stamp duty mechanism for qualifying purchases. NT residency requirements apply to several scheme components and can be more detailed than in some southern states, reflecting the territory's policy direction on supporting long-term residents. Eligibility otherwise follows the common spine of citizenship or permanent residency, age and principal-place-of-residence occupation, with the prior-ownership test applied as in other jurisdictions.

The application pathway for NT schemes is through the buyer's approved lender at first drawdown or settlement, or directly through the Territory Revenue Office where the lender pathway is not used. The stamp duty mechanism is applied at settlement through the buyer's conveyancer.

NT-specific considerations affect the build context substantially. Cyclone construction requirements apply across much of the territory, with the National Construction Code provisions on cyclonic wind loading driving structural design and build cost above mainland equivalents in non-cyclonic regions. The NT building regulator structure also differs from the southern state model, with a smaller pool of registered builders and a market dominated by territory-experienced operators rather than the volume builders that dominate mainland markets. The BUILTLY guides on how to check a builder's registration in the Northern Territory and how to choose a builder in Darwin cover the territory-specific verification framework. Verify current grant amounts, residency requirements, eligibility details and application requirements at nt.gov.au.

Australian Capital Territory: ACT Revenue Office

The Australian Capital Territory administers its first home buyer support through the ACT Revenue Office (revenue.act.gov.au) and Access Canberra. The ACT operates structurally differently from the FHOG model used in the mainland states: rather than a traditional cash First Home Owner Grant, the ACT delivers first home buyer support primarily through the Home Buyer Concession Scheme (HBCS), which is an income-tested stamp duty concession for eligible buyers. The structural difference matters because buyers entering the ACT market with FHOG-style expectations from another state may find the support arrangement is shaped differently than they expect.

Eligibility under the HBCS is income-tested rather than based purely on prior ownership and citizenship. The applicant must be an Australian citizen or permanent resident, must be at least eighteen, must intend to occupy the property as their principal place of residence within the prescribed period and remain in occupation for the prescribed minimum continuous period, must satisfy an income test (with the income cap revised periodically and verified at the ACT Revenue Office), and must not have owned property in the recent past (the look-back period for prior ownership in the ACT differs from the lifetime test used in some other jurisdictions and should be verified). Property value tests also apply.

The HBCS applies broadly to first home buyer purchases in the ACT (subject to the income and property value caps), with the new-build versus established treatment differing from the strict new-build focus of most mainland FHOG schemes. The benefit is delivered as a reduction in (or exemption from) the stamp duty otherwise payable on the purchase, calculated and applied at settlement.

The application pathway is through Access Canberra, with the income verification, property value verification and prior-ownership declaration lodged as part of the application. The buyer's conveyancer typically coordinates the application alongside the settlement process. The income-test structure makes the ACT scheme means-tested in a way that the mainland FHOG schemes generally are not, which is the structural feature most worth understanding before relying on the ACT support package in the affordability plan. The BUILTLY guides on how to check a builder's licence in the ACT and how to choose a builder in Canberra cover the ACT market context for buyers considering the build pathway. Verify current concession structure, income caps, value caps, eligibility details and application requirements at revenue.act.gov.au.

How to apply and avoid common rejections

The application pathway for first home buyer schemes is more often determined by who is handling the buyer's loan and conveyancing than by an active choice the buyer makes. Most First Home Owner Grant applications are lodged by the buyer's approved lender at the time of first drawdown for a build or at settlement for a qualifying purchase, with the lender (or the broker on the buyer's behalf) completing the application form, attaching the required documentation and submitting it to the relevant state revenue office. Direct application to the state revenue office is available where the lender pathway is not used, and is sometimes preferred where the timing of the application requires it. Stamp duty concessions are almost always applied at settlement through the buyer's conveyancer or solicitor, who lodges the eligibility declaration with the state revenue office as part of the settlement transaction.

Documentation typically required across the schemes includes: proof of identity (passport, driver's licence, citizenship or permanent residency documentation as applicable); proof of address; the contract of sale or building contract (the BUILTLY guide on how to read a building contract in Australia covers what the contract should evidence at this point); statutory declarations on prior ownership status, intended occupation and (where relevant) income; spouse or partner information including their prior ownership status; and (for some schemes) income verification through ATO records or payslips. The prior ownership declaration is the most consequential document because misrepresentation or omission can result in the grant being clawed back later (with penalties in some states), even where the omission was inadvertent.

The most common rejection reasons in practice are predictable and largely preventable. Spouse or partner prior ownership being overlooked is the single most frequent reason for grants to be denied at application or clawed back later, particularly in households where one party has previously owned and assumes the other party's first-home status applies to the household. Property value exceeding the cap is the second most common reason, particularly in higher-value markets where the cap bites at price points that are common rather than premium. Failure to satisfy the principal-place-of-residence requirement (either through delayed occupation, interrupted occupation or never genuinely intending to occupy) is the third common reason, often arising where the buyer's circumstances change after settlement. Other reasons include incomplete documentation, missing the application window, multiple applications across different states or for different properties, and construction not meeting the relevant state's "new build" definition.

If a grant is rejected, the rejection letter from the state revenue office typically sets out the specific reason and the pathway for reconsideration or appeal. Procedural rejections (incomplete documentation, missed deadlines that can be cured) are often resolvable through resubmission with the missing information. Substantive rejections (eligibility failure on prior ownership, value cap or occupation) are harder to overturn and may require a formal tribunal pathway in some states. The most important practical point is to confirm grant eligibility before signing the contract rather than after: a buyer who signs a contract assuming a grant approval that does not eventuate can find the affordability position has changed materially. The BUILTLY guides on the first home buyer building guide and construction loans in Australia cover the broader pathway that the grant application sits within.

Red flags when relying on first home buyer schemes

First home buyer schemes are heavily marketed by builders, developers, brokers and lenders with commercial interests in the buyer's transaction, and the gap between authoritative information from state revenue offices and marketing assertions in the sales process is sometimes substantial. Misreading scheme eligibility sits within the broader category of expensive build decisions covered in the BUILTLY guide on the most expensive mistakes when building a house in Australia. The warning signs below are the most common precursors to grant rejection, scheme misunderstanding or financial harm. Treat any one as a reason to pause and verify directly with the relevant state revenue office; treat two or more as a reason to step back from the transaction. The BUILTLY guide on red flags when choosing a builder covers the broader pattern of warning signs across the build process.

Warning signs

  • Sales staff promising specific grant amounts without paperwork. First Home Owner Grants and stamp duty concessions are administered by state revenue offices, not by builders, developers or brokers. A salesperson asserting a specific grant amount as a confirmed entitlement (particularly without referring the buyer to the relevant revenue office for verification) is either misinformed or misleading. Confirm every scheme assertion with the relevant revenue office before factoring it into the affordability calculation.
  • Outdated grant amounts cited as current. State scheme amounts change with state budgets, often annually and sometimes mid-year. Marketing material that cites a specific grant amount may have been accurate when produced but is not necessarily accurate at the time the buyer reads it. Verify directly at the relevant state revenue office, not against the brochure.
  • Builder offering to "handle the grant for you" with no homeowner involvement. The grant application is lodged in the homeowner's name with the homeowner's statutory declaration, and the homeowner carries personal liability for the accuracy of the declaration. A builder or sales agent who positions the grant as something they will quietly arrange in the background is creating a documentation gap the homeowner is the one exposed to. Verify the application personally.
  • House-and-land packages priced specifically to maximise grant eligibility. Some house-and-land packages are structured to position the contract value just below a value cap or just within a stamp duty concession threshold. The structuring is legitimate but the buyer should understand exactly what has been priced where and confirm that the package as a whole genuinely represents value rather than just optimised eligibility.
  • Sales pressure to sign before grant eligibility is confirmed. Confirming eligibility with the relevant state revenue office is a defensible reason to delay contract execution by a few business days. A salesperson, builder or broker who pressures the buyer to sign before eligibility is confirmed is either uninformed about the timeline or working against the buyer's interest.
  • Stamp duty concession assumed without state-specific verification. Stamp duty concession thresholds and structures vary materially between states, and a concession that exists in one state may have a very different shape (or not exist at all) in another. Do not assume cross-state equivalence; verify the specific concession structure for the state where the property is located.
  • Spouse or partner prior ownership not disclosed in the application. The single most common rejection trigger across all states is the partner's prior ownership being overlooked or omitted from the application. Disclose every relevant prior ownership position (the applicant's, the partner's, jointly held interests, deceased estate inheritances, prior trust ownerships) and let the state revenue office determine eligibility on the full picture rather than relying on a partial disclosure.
  • Application timing not aligned with settlement. Grant applications have prescribed windows within which they must be lodged after contract signing or settlement. An application lodged outside the window is rejected on procedural grounds regardless of substantive eligibility. Coordinate the application timing with the lender or conveyancer in advance of settlement.
  • Multiple applications across states or for multiple properties. The First Home Owner Grant is generally limited to one application per applicant per lifetime across all Australian jurisdictions, and the state revenue offices share information for the purpose of detecting multiple applications. Multiple applications are detected and rejected, and (in some states) attract penalties.
  • FHSS withdrawal without genuine purchase intent. The First Home Super Saver Scheme withdrawal must be applied to a genuine first home purchase within the prescribed period after release. A withdrawal without a credible purchase plan can attract penalties from the ATO including additional tax on the withdrawn amount. Engage a registered tax agent before lodging an FHSS request if the purchase plan is not yet firm.
  • Home Guarantee Scheme assumed available without confirming current allocation. The HGS has a limited number of places per financial year, and allocations can run out before year end, particularly in popular streams. A loan structured around HGS access is exposed if the allocation is exhausted; confirm with the participating lender that an allocation is available before relying on the scheme in the deposit position.
  • Lender pre-approval treated as confirmation of grant approval. A lender's pre-approval relates to the loan, not to the state revenue office's grant approval. The two approvals are independent, and a buyer with strong loan pre-approval can still be rejected for the grant on substantive eligibility grounds. Confirm both approvals separately before treating the affordability position as settled.

BUILTLY and first home buyer verification

BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.

First verified builder profiles launch in 2026 alongside the national rollout. In the meantime, the BUILTLY guide library covers the verification framework first home buyers can apply themselves: the BUILTLY pillar guide on the complete guide to building a house in Australia sits at the centre, the BUILTLY guide on how to vet a builder in Australia covers the diligence framework, the guide on how to read a building contract covers the contract-side review, and the guide on the most expensive mistakes building a house in Australia covers the cost-side risks the grant is intended to offset.

Frequently asked questions

Can I get the First Home Owner Grant for a knockdown rebuild on land I already own?

In most states the First Home Owner Grant is available for knockdown-rebuild projects on land already owned by the applicant, provided the resulting dwelling qualifies as a new home, the applicant has not previously owned residential property as their principal place of residence, and the relevant occupation requirements are met. The treatment varies by state, with some jurisdictions distinguishing between rebuilding on a long-held lot and rebuilding on a recently purchased lot, and some applying value caps to the new dwelling rather than to the combined land-and-build position. The eligibility test for prior ownership can also be more nuanced for landowners than for new buyers because owning vacant land does not generally count as prior residential ownership, but owning a previous dwelling on the lot would. Confirm the position with the relevant state revenue office before commencing demolition, because the application timing and the documentation required (demolition permit, building approval, contract evidence) are typically prescribed.

Does my spouse's prior property ownership disqualify me from the FHOG?

In most states, yes. The First Home Owner Grant is generally administered as a household-level test rather than an individual test, with the spouse or de facto partner's prior ownership disqualifying the applicant even where the applicant has never owned property in their own name. The reasoning is that the grant is intended for households entering home ownership for the first time, not for households where one party has previously owned and is purchasing again with a partner who is technically a first home buyer. The disqualification typically applies regardless of whether the spouse is on the new contract, although the specifics vary by state. There are some exceptions in some jurisdictions for spousal ownership that occurred before the relationship began or for ownership of investment property only (rather than a principal place of residence), but these exceptions are narrow and state-specific. This is the single most common reason for grant rejection in practice; verify the position carefully with the relevant state revenue office before relying on the grant in the affordability plan.

Can I claim the FHOG in one state and live in another?

No. The First Home Owner Grant is administered by the state where the property is located, and the eligibility framework requires the applicant to occupy the property as their principal place of residence within a prescribed period after settlement or completion (typically six to twelve months, varying by state) and to remain in occupation for a minimum continuous period (commonly six to twelve months, again varying). An application for a property in one state where the applicant intends to live in another state would not satisfy the principal-place-of-residence test and would be rejected at application or clawed back at audit. The grant is also generally limited to one application per applicant per lifetime across all Australian states and territories, so multiple applications in different states for different properties are automatically detected and rejected. The grant follows the property and the applicant's actual occupation, not the applicant's preference about where to claim.

What's the difference between the First Home Guarantee and the First Home Owner Grant?

The First Home Guarantee is a federal scheme administered by Housing Australia that provides eligible first home buyers with a government guarantee on the deposit shortfall, allowing them to purchase with a deposit as low as 5% without paying Lenders Mortgage Insurance. The scheme does not provide cash to the buyer; the benefit is structural (avoided LMI premium and access to a smaller deposit position than standard lender policy would otherwise allow). The First Home Owner Grant is a state-administered scheme that provides a cash payment to eligible first home buyers, typically credited against the loan at first drawdown for a new build or at settlement for a qualifying purchase. The two schemes are administered by different bodies, have different eligibility tests, and apply to different property types in different ways, but they are generally stackable: an eligible first home buyer can use the First Home Guarantee to access the loan with a low deposit and also receive the state First Home Owner Grant where the property qualifies. Verify both eligibilities separately with the relevant administering body before relying on either in the affordability calculation.

Can I use the First Home Super Saver Scheme together with the First Home Owner Grant?

Yes. The First Home Super Saver Scheme (administered by the ATO) and the First Home Owner Grant (administered by the relevant state revenue office) are independent schemes with independent eligibility tests, and an applicant who qualifies for both can use them together. The FHSS allows eligible first home buyers to release voluntary super contributions and associated earnings to use as part of the deposit, while the FHOG provides a cash payment toward the purchase or build. The two schemes interact in practice through the deposit and settlement process: the FHSS withdrawal is typically released to the applicant within a defined window after the ATO determination, the FHOG is typically credited at first drawdown or settlement, and both can be reflected in the lender's view of the deposit position at loan approval. The eligibility tests differ in detail (the FHSS allows release for first home purchase including in cases where some types of prior property interaction may not disqualify), so confirm the FHSS position separately at ato.gov.au and the FHOG position with the relevant state revenue office.

What happens to my FHOG if I move out of the property before the required occupation period ends?

Moving out of the property before completing the required minimum occupation period typically triggers a clawback of the grant by the state revenue office. The minimum continuous occupation requirement varies by state but commonly sits in the range of six to twelve months from the date the applicant first occupies the property as their principal place of residence. Where occupation is interrupted within that period for legitimate reasons (work relocation, serious illness, family breakdown), some states accept variation requests with supporting evidence; where occupation is interrupted for choice or convenience, the grant is generally repayable in full plus (in some states) interest from the date of payment. The applicant has an obligation to notify the state revenue office of any change in occupation status during the qualifying period; failure to notify can result in penalties in addition to the clawback. Plan the build and the move with the occupation requirement in mind, and confirm the specific requirement with the relevant state revenue office before signing the contract.

Related guides