Landscaping is consistently one of the most underbudgeted items in a residential build or renovation. It is typically the last major expenditure, scheduled after the house is finished and the budget is stretched, and it is the item most commonly deferred, reduced or regretted. A well-executed landscape transforms a property. A rushed or underfunded one is visible from the street for decades. This guide covers what landscaping realistically costs in Australia in 2026, how to budget intelligently, what design fees look like, and what the difference is between a $15,000 and a $150,000 landscape. For the wider build budget context, see the complete guide to building a house in Australia.
Prices reviewed October 2026. Indicative ranges, not quotes: location, site conditions, specification and GST all affect your price.
The retained landscape budgets are indicative scope allowances, not verified national averages. Their GST basis is not established; ask each supplier to state GST and exclusions before comparing quotes.
How Much Does Landscaping Cost in Australia?
Landscaping costs in Australia range from around $5,000 for a simple new home garden with turf, basic planting and a paved path, through to $250,000 or more for a full luxury landscape with pool, outdoor kitchen, feature lighting, automated irrigation and high-end stone paving. Agree who is responsible for landscaping before pricing site preparation, drainage and final levels. For a sloping site, review the implications of building on a sloped block before fixing the retaining and access budget.
The indicative tiers are $5,000 to $15,000 for a basic garden, $15,000 to $40,000 for a standard suburban landscape and $40,000 to $80,000 for a mid-range full landscape. Premium work is $80,000 to $150,000 and luxury scope starts at $150,000.
A commonly used benchmark is to allocate 5 to 10 percent of your home's value to landscaping. For a $700,000 home, that suggests a landscaping budget of $35,000 to $70,000. For a $1.2 million home, $60,000 to $120,000. These figures include hardscaping elements such as paving, retaining walls, driveways and decking as well as softscaping including turf, planting, garden beds and irrigation.
| Project type | Typical total cost | What is included |
|---|---|---|
| Basic new home garden | $5,000 - $15,000 | Turf, basic planting, simple paved path |
| Standard suburban landscape | $15,000 - $40,000 | Turf, garden beds, paving, basic retaining, irrigation |
| Mid-range full landscape | $40,000 - $80,000 | Paving, decking, retaining walls, planting, lighting, irrigation |
| Premium landscape | $80,000 - $150,000 | High-end paving, feature planting, outdoor entertaining, feature lighting, automated irrigation |
| Luxury landscape | $150,000+ | Pool, outdoor kitchen, premium stone, bespoke design, full automation |
All figures are indicative for 2026 and vary significantly by state, site conditions and material choices. Sloped blocks, difficult access and complex sites will increase costs.
Indicative cost: Mid-range full landscape - $40,000 to $80,000 depending on scope and finish
Landscape Design Fees
Before any construction begins, most significant landscaping projects benefit from a professional landscape design. Engaging a landscape designer or landscape architect before the build - ideally during the architectural design phase - means landscaping is planned into the site rather than squeezed around the building afterwards.
Landscape Designer vs Landscape Architect
A landscape designer creates garden and outdoor space designs for residential and commercial clients. They typically hold qualifications in horticulture, landscape design or a related field.
A landscape architect holds a professional degree in landscape architecture and is typically accredited by the Australian Institute of Landscape Architects (AILA). Landscape architects are engaged on more complex projects involving site planning, drainage, engineering coordination, heritage considerations or council approvals. For more on the distinction between design professionals refer to the BUILTLY guide on structural engineer vs architect.
For most residential projects, a landscape designer is appropriate. Landscape architects are more commonly engaged for architecturally significant homes, large acreage projects, development sites or projects requiring council-managed design input.
Design Fee Ranges
- Initial consultation: $240 to $800 depending on duration and the professional's seniority
- Design fees depend on the practitioner and scope; obtain a written hourly or fixed-fee proposal, including documentation and revisions.
- Basic concept plan (small courtyard or garden): $500 to $2,000
- Full residential design package (suburban home, front and back): $3,500 to $7,000
- Complex or large site design package: $7,000 to $15,000+
- Percentage-of-construction approach for large projects: typically 5 to 10 percent of the total landscaping construction budget
Indicative cost: Full residential landscape design package - $3,500 to $7,000 for a standard suburban home
Why Design Fees Are Worth It
A professional landscape design is a construction document, not just a mood board. It defines materials, levels, drainage, plant species, irrigation zones and construction sequence. Without it, construction teams make assumptions and homeowners make expensive changes mid-project. The design fee is typically recovered many times over in avoided rework, better material decisions and a more coherent finished result.
Engaging a designer during the architectural phase - rather than after the house is complete - also allows the landscape to be considered in site orientation, retaining wall locations, stormwater connections and driveway design.
Hardscaping Costs
Hardscaping covers all the built elements of a landscape - paving, decking, retaining walls, driveways, paths, pergolas and outdoor structures. It typically accounts for 50 to 70 percent of a total landscaping budget.
| Element | Cost range | Notes |
|---|---|---|
| Concrete paving | $60 - $100 per m² | Plain concrete, standard residential |
| Exposed aggregate paving | $100 - $160 per m² | Popular for outdoor entertaining areas |
| Natural stone paving | $150 - $350+ per m² | Sandstone, bluestone, granite |
| Porcelain pavers | $120 - $250 per m² | Premium finish, popular in contemporary designs |
| Timber decking - treated pine | $200 - $280 per m² | Entry-level deck option |
| Timber decking - hardwood | $280 - $400 per m² | Merbau and similar hardwoods |
| Composite decking | $350 - $600 per m² | Low maintenance, premium look |
| Retaining walls - timber | $250 - $450 per m² | Treated pine sleepers, lower heights |
| Retaining walls - concrete block | $350 - $650 per m² | Standard residential heights |
| Retaining walls - natural stone | $500 - $1,200+ per m² | Feature retaining, engineered heights |
| Pergola - steel | $15,000 - $40,000 | Freestanding, standard residential |
| Pergola - timber | $10,000 - $30,000 | Hardwood or treated pine |
| Outdoor kitchen - basic | $5,000 - $15,000 | Built-in BBQ, benchtop, storage |
| Outdoor kitchen - premium | $20,000 - $60,000+ | Full catering kitchen, pizza oven, refrigeration |
| Garden lighting | $1,500 - $8,000+ | Path, accent and feature lighting installed |
| Irrigation system | $2,500 - $8,000 | Automated pop-up system, standard suburban block |
| Garden drainage | $1,500 - $5,000+ | Channel drains, stormwater connections |
All prices are indicative for 2026 and include labour and materials. Complex sites, difficult access or sloped blocks will increase costs.
Indicative cost: Hardscaping typically accounts for 50 to 70 percent of a total landscaping budget
Softscaping Costs
Softscaping covers all the living elements of a landscape: turf, planting, garden beds, trees, mulch and soil preparation. It typically accounts for 20 to 40 percent of a total landscaping budget, with the remainder covering design, project management and site preparation.
Turf
Instant turf supply and lay: $15 to $35 per m² depending on turf variety and site preparation required. Buffalo, couch and kikuyu are common choices, and buffalo varieties such as Sir Walter are popular in Queensland and NSW for shade tolerance. For 200m², turf at these rates is $3,000 to $7,000 before additional soil preparation or site works. Where irrigation, shade or maintenance rules out natural lawn, compare the whole-of-life figures in the artificial turf cost guide.
Indicative cost: Instant turf supply and lay - $15 to $35 per m² installed
Garden Beds and Planting
Garden bed preparation including soil, edging and mulch: $30 to $60 per m². Planting costs vary enormously by plant size and species - allow $2,000 to $10,000+ for planting on a standard suburban block. Feature trees: $500 to $5,000+ per tree depending on species and size at time of planting. Native species generally cost less to establish and maintain long-term, and are increasingly preferred for their drought tolerance and wildlife value.
Mulch, Soil and Site Preparation
Premium garden soil or growing mix: $80 to $150 per cubic metre delivered and spread. Mulch: $60 to $100 per cubic metre delivered and spread. Site preparation including excavation, grading and debris removal is often the largest hidden cost on a new build site - allow $3,000 to $15,000+ depending on site conditions.
Landscaping a New Home - What to Expect
New home landscaping is a distinct category. Unlike renovating an existing garden, you are typically working with bare fill, stripped topsoil, concrete waste scattered through the yard, builder's rubble and a site that has been compacted by construction traffic. The scope of work required before a blade of grass goes in is substantially more than most new homeowners anticipate. For a complete overview of the new build process refer to the BUILTLY building a house checklist.
Site clean-up and waste removal
Builder's rubble, concrete chunks, excess fill and construction debris must be removed before any landscaping can begin. Allow $1,000 to $5,000+ depending on the volume of material.
Site grading and level establishment
The ground is graded to achieve positive drainage away from the house and to establish finished floor level relationships between the house and garden.
Retaining wall construction
If the block has any slope or level change, retaining walls are typically constructed before any other landscaping proceeds.
Drainage installation
Underground drainage, channel drains and stormwater connections are installed before paving or turf goes in.
Hardscaping construction
Paving, driveways, paths, decking, pergolas and structures are typically completed before any softscaping begins.
Irrigation installation
Automated irrigation is laid before turf and garden beds are established.
Soil preparation
Topsoil and growing mix are brought in and spread to finished levels ready for planting.
Softscaping
Turf is laid, garden beds are planted, mulch is applied and trees are installed.
Lighting installation
Garden lighting is typically the final trade on a landscaping project.
Final clean-up and handover
The landscaper cleans the site and the irrigation and lighting systems are tested and commissioned.
Why Landscaping Is Always the Most Budget-Squeezed Item
By the time a new home or major renovation reaches practical completion, most budgets have been tested. Variations, upgrades, provisional sum overruns and unexpected structural costs have typically absorbed contingency funds. Landscaping, scheduled last, is invariably the item that gets reduced.
This is the most common source of post-build regret in Australian residential construction. Homeowners who spent $900,000 building their home then try to landscape for $15,000 - and live with a substandard result for years.
Three approaches to avoid this outcome:
Budget landscaping as a separate line item from day one. Allocate 5 to 10 percent of your home's value to landscaping before construction starts - not after.
Stage the landscaping deliberately rather than cutting scope. A staged approach where hardscaping and drainage are completed first, with planting completed in year two or three, delivers a better outcome than a rushed, underfunded full installation.
Engage a landscape designer before construction begins. A designer engaged during the architectural phase can identify retaining wall requirements, drainage connections and outdoor living areas early - when changes are cheap - rather than after the slab is poured.
How Landscaping Adds Value to Your Property
BUILTLY is building a record of completed Australian homes that credits the builder, landscape designers and trades behind each one.
The return on investment is strongest when:
- The landscaping is consistent with the architectural character of the house
- The outdoor space adds functional living area - an outdoor entertaining area extends usable square metrage
- Mature planting and established gardens are in place at the time of sale
- Lighting, irrigation and low-maintenance plant selection reduce ongoing maintenance burden for buyers
How to Choose a Landscaper
- Check that the landscaper holds the appropriate licence for your state - landscaping contractor licensing requirements vary by state and territory
- Confirm the landscaper carries public liability insurance and workers compensation
- Ask to see completed projects and speak to previous clients - photos are helpful but site visits to completed work are more valuable
- Confirm the quote is fully itemised - materials, labour, site preparation, disposal, drainage and irrigation should all be listed separately
- Confirm whether landscape design is included in the quote or is a separate engagement
- Ask how variations are managed - if site conditions reveal unexpected costs mid-project, what is the process?
- Confirm the construction sequence and timeline before signing - particularly which trades the landscaper is responsible for coordinating
- Confirm what is included in the defects liability period and how warranty claims are managed
- Get at least three quotes for any project over $15,000
- If engaging a landscape architect or designer separately from the builder, confirm who is responsible for coordinating between the design and construction scopes
For more detail on comparing quotes refer to the BUILTLY guide on how to compare quotes from builders. For guidance on whether online reviews are a reliable way to assess contractors, read the BUILTLY guide on are Google reviews reliable for builders?
Landscaping and the Building Contract
If you are building a new home, landscaping is almost never included in the builder's standard contract. It is typically treated as a separate scope engaged directly by the homeowner after practical completion.
There are exceptions - some volume builders offer landscaping packages as an upgrade or inclusion - but the scope is typically minimal and the quality is variable. Most architecturally designed new homes treat landscaping as a completely separate engagement.
Key considerations when building new:
- Retaining walls required for structural or council compliance reasons may be included in the builder's contract - confirm this before signing
- Stormwater connections to the council kerb are typically the builder's scope - confirm the point of connection before landscaping construction begins
- The builder's contract should specify finished ground levels adjacent to the house - this is critical for drainage and retaining wall design
- Driveway and front path are sometimes included in the builder's contract as a provisional sum - confirm the scope and allowance
Landscaping and BUILTLY
BUILTLY is building a record of completed Australian homes that credits the builder, landscape designers and trades behind each one.
Frequently asked questions
How much does landscaping cost for a new home in Australia?
Use the project tiers in this guide rather than one average for every garden. A basic garden with turf, planting and a simple path has an indicative budget of $5,000 to $15,000. A standard suburban landscape is $15,000 to $40,000; a mid-range full landscape with paving, retaining walls, decking, irrigation and planting is $40,000 to $80,000. Luxury landscapes including pools, outdoor kitchens and premium stone can exceed $150,000.
How much should I budget for landscaping as a percentage of my home's value?
The commonly used benchmark in Australia is 5 to 10 percent of your home's value. For a $700,000 home this suggests a landscaping budget of $35,000 to $70,000. This figure includes all hardscaping and softscaping but typically excludes pools, which are usually budgeted separately. The 5 percent figure tends to cover functional landscaping with clean design. The 10 percent figure allows for a premium result with quality materials and detailed planting.
How much do landscape designers charge in Australia?
Design fees depend on the practitioner and scope; obtain a written hourly or fixed-fee proposal, including documentation and revisions. Any package allowances in this guide are indicative, not a national fee schedule.
What is the difference between a landscape designer and a landscape architect?
A landscape designer creates garden and outdoor space designs for residential and commercial clients and typically holds qualifications in horticulture or landscape design. A landscape architect holds a professional degree in landscape architecture and is accredited by the Australian Institute of Landscape Architects (AILA). Landscape architects are engaged on more complex projects involving drainage engineering, council approvals, heritage considerations or site planning on larger or architecturally significant properties. For most residential new builds and renovations, a landscape designer is appropriate.
When should I engage a landscaper for a new home build?
Ideally during the design phase - before the building contract is signed. A landscape designer engaged at the same time as your architect can identify retaining wall requirements, drainage connections, outdoor living areas and driveway design early, when changes are inexpensive. Waiting until practical completion to think about landscaping is the single most common cause of cost blowout and disappointment in the landscaping budget. At minimum, obtain a landscaping budget estimate before your building contract is signed so you know the true total cost of your project.