A new driveway is one of the most visible upgrades you can make to your home. It improves curb appeal, increases property value and adds daily functionality - but the cost varies significantly depending on the material you choose, the size of the driveway and the condition of your site.
This guide covers all the major driveway types used in Australia, what they cost per square metre in 2026, what influences your final price and what to look for when choosing a contractor. For a complete framework on budgeting your total project cost refer to the Builtly guide on Renovation Budget Australia.
Prices reviewed October 2026. Indicative ranges, not quotes: location, site conditions, specification and GST all affect your price.
How Much Does a Driveway Cost in Australia?
The cost of a new driveway in Australia typically ranges from $1,500 for a small basic gravel driveway up to $25,000 or more for a large decorative paver or exposed aggregate installation. For most standard residential driveways, the majority of homeowners spend between $3,000 and $12,000 depending on material and size.
| Material | Cost per m² | Typical total (50m²) | Lifespan | Maintenance |
|---|---|---|---|---|
| Gravel / crushed rock | $20 - $45 | $1,000 - $2,250 | 5-15 years | High |
| Asphalt / bitumen | $40 - $110 | $2,000 - $5,500 | 15-25 years | Low-medium |
| Plain concrete | $105 - $125 | $5,250 - $6,250 | 25-40 years | Low |
| Coloured concrete | $120 - $152 | $6,000 - $7,600 | 25-40 years | Low |
| Exposed aggregate | $145 - $180 | $7,250 - $9,000 | 25-40 years | Low |
| Concrete pavers | $80 - $150 | $4,000 - $7,500 | 20-30 years | Medium |
| Brick pavers | $100 - $200 | $5,000 - $10,000 | 30-50 years | Medium |
| Natural stone | $150 - $300+ | $7,500 - $15,000+ | 30-50+ years | Medium-high |
Concrete rates use Archicentre Australia CostGuide 2026 for a 100mm reinforced driveway, including GST. Other material ranges are retained indicative allowances with an unverified GST basis. Confirm preparation, removal, drainage and crossover inclusions in your quote.
2026 Driveway Pricing: What Has Changed
Driveway pricing in Australia has shifted noticeably between 2024 and 2026. Concrete costs have continued to climb, driven by cement input prices and labour rate increases across residential construction. Coloured and decorative concrete finishes have moved up a similar percentage to plain concrete because pigment and finishing labour both feed off the same supply chain.
Paver pricing has been comparatively stable. Concrete pavers benefit from established Australian manufacturing capacity, and brick pavers continue to track close to long-run averages. Natural stone remains volatile because most product is imported and freight, exchange rates and quarry availability all affect landed cost.
Asphalt pricing remains the most volatile of the common driveway materials because bitumen is a refined petroleum product and tracks crude oil. Quotes obtained more than three months apart from the same contractor can show meaningful variation. Most contractors now hold quotes for shorter periods than they did pre-2024, and many will only honour written quotes for 14 to 30 days.
Labour costs have risen across the board. Civil and concreting trades have absorbed wage increases consistent with the broader construction sector, which flows through to per-square-metre installation rates rather than material rates. Council requirements have also tightened in several local government areas, particularly around stormwater integration and crossing permits - both of which can add line items that older quotes did not include. For broader context on how project costs have shifted across new builds, refer to the Builtly guide on most expensive mistakes building a house in Australia.
Where the driveway is part of a new build or major renovation funded with construction finance, the lender's progress payment schedule will dictate when the driveway scope is paid for. The Builtly guide on construction loans in Australia explains how external works including driveways sit within the standard payment stages. Prices throughout this guide are indicative ranges for 2026 - confirm current pricing with at least three quoted contractors before committing.
Driveway Types and Costs Explained
Gravel and Crushed Rock Driveways
Gravel is the most affordable driveway option in Australia and suits rural properties, acreage and homes where a natural aesthetic fits the landscape. Crushed rock is a step up from standard gravel - the angular fragments compact well and provide a more stable surface.
Pros
- Low upfront cost
- Excellent drainage
- Easy to repair and top up
- Suits large rural driveways
Cons
- Requires ongoing maintenance
- Gravel migrates under vehicle movement
- Not suitable for steep driveways
- Less suited to tight suburban properties
Indicative cost: Gravel driveway - $20 to $45 per m² | Typical 50m² total: $1,000 to $2,250
Asphalt and Bitumen Driveways
Asphalt is one of the most popular driveway materials in Australia, particularly for larger residential properties and acreage. It offers a clean, dark finish, handles Australian heat well and is more affordable than concrete for large areas. Hot mix asphalt is the premium option - manufactured under heat, it provides superior durability and flexibility.
Sloped driveways suit asphalt well up to a 1-in-5 gradient due to its grip. Many asphalt contractors have minimum project sizes - typically 150m² or more - which makes asphalt less practical for small suburban driveways.
Pros
- Cost-effective for large areas
- Handles heat well
- Flexible and resists cracking
- Lower long-term maintenance
Cons
- Minimum project sizes with many contractors
- Less suitable for small driveways
- Requires sealing every two to five years
- Can soften in extreme heat without quality hot mix
Indicative cost: Asphalt driveway - $40 to $110 per m² | Typical 50m² total: $2,000 to $5,500
Plain Concrete Driveways
Plain concrete is the most common driveway surface for suburban Australian homes. It is durable, low maintenance and provides a clean, neutral finish. Standard thickness for a residential driveway is 100mm, increasing to 150mm for heavier vehicles.
A sloped block adds approximately $10 per m² to the cost. Concrete driveways can crack over time, particularly where tree roots are present or sub-base preparation is inadequate. For more on building on sloped sites refer to the Builtly guide on Retaining Wall Cost Australia.
Pros
- Durable and long-lasting (25 to 40 years)
- Low ongoing maintenance
- Wide range of finishes available
- Adds property value
Cons
- Higher upfront cost than gravel or asphalt
- Cracks can be difficult and expensive to repair
- Sloped surfaces require appropriate finish for grip
Indicative cost: Plain concrete driveway - $105 to $125 per m² | Typical 50m² total: $5,250 to $6,250
Coloured Concrete Driveways
Coloured concrete adds aesthetic appeal without a major cost premium over plain concrete. Pigments are mixed through the concrete before pouring, giving a consistent colour throughout. Popular choices include charcoal, sandstone and terracotta tones that complement Australian homes.
Indicative cost: Coloured concrete driveway - $120 to $152 per m² | Typical 50m² total: $6,000 to $7,600
Exposed Aggregate Driveways
Exposed aggregate is one of the most popular premium driveway choices in Australia. The surface is created by washing away the top layer of concrete to reveal the stones, pebbles and aggregates within. The result is a textured, decorative finish with excellent grip - particularly useful on sloped driveways.
Exposed aggregate costs more than plain or coloured concrete because it involves additional labour, specialist timing during the pour and a sealing step. However, it offers superior durability, slip resistance and visual appeal.
Pros
- Attractive finish
- Excellent grip and slip resistance
- Very durable
- Wide range of stone and colour options
- Adds significant property value
Cons
- Higher upfront cost
- Difficult to repair patches seamlessly
- Requires professional sealing
Indicative cost: Exposed aggregate driveway - $145 to $180 per m² | Typical 50m² total: $7,250 to $9,000
Concrete and Brick Paver Driveways
Paver driveways offer a premium, high-end finish and are a popular choice for front driveways where kerb appeal matters. Concrete pavers are the more affordable option; brick pavers and natural stone pavers sit at the upper end of the market.
Pavers are installed individually on a prepared sand or concrete base, which means individual pavers can be lifted and relevelled if the ground shifts over time - a significant advantage over poured concrete.
Indicative cost: Paver driveway - $80 to $200 per m² | Typical 50m² total: $4,000 to $10,000
Natural Stone Driveways
Natural stone including sandstone, granite, limestone and bluestone represents the premium end of the driveway market in Australia. Stone driveways can last 50 years or more with appropriate maintenance and add significant value to luxury properties.
Indicative cost: Natural stone driveway - $150 to $300+ per m² | Typical 50m² total: $7,500 to $15,000+
What Affects Driveway Cost in Australia?
Driveway Size and Shape
Cost is primarily calculated per square metre, so the larger the driveway the higher the total cost. Straight rectangular driveways are the most cost-effective to install. Curved, circular or bespoke shapes require additional cutting, formwork and labour.
Site Preparation and Access
Removing an existing driveway adds $500 to $3,000 depending on material and size. Excavation and levelling on sites with uneven or clay-heavy soil can add significantly to preparation costs. Difficult or restricted site access - narrow blocks, overhead powerlines or tight turning circles - increases labour time and may require smaller equipment.
Slope and Gradient
Sloped driveways cost more across all material types. Concrete on a slope adds approximately $10 per m². Steep driveways require additional sub-base work, drainage solutions and careful surface selection for grip and safety. For more detail on construction on sloped sites refer to the Builtly guide on Retaining Wall Cost Australia.
Drainage
Design drainage to the applicable council and state requirements; do not discharge runoff unlawfully. Installing drainage channels or connecting to existing stormwater infrastructure can add $500 to $2,000 or more to the project.
Permits and Council Requirements
A driveway crossing - the section from the kerb to your property boundary - typically requires a council permit. Kerb and channel work must be completed by a council-approved contractor in most states. Internal driveway works on your own property generally do not require approval, but requirements vary by council. For more detail on permit requirements refer to the Builtly guide on Building Permit in Australia.
Location and State
Labour rates and material transport costs vary significantly across Australia. Metropolitan areas typically attract higher labour costs than regional locations. Queensland and New South Wales generally offer competitive pricing; Victoria and Western Australia can be slightly higher in some areas.
Driveway Sub-base and Drainage: The Hidden Cost
The most common cause of premature driveway failure in Australia is inadequate sub-base preparation. The sub-base is the compacted layer of crushed rock or road base beneath the visible surface, and it is what gives the driveway its structural performance under vehicle loads. On a typical residential project, sub-base preparation accounts for roughly 30 to 40 percent of the total installed cost - yet it is invisible once the job is finished, which makes it the easiest line item for a low-cost contractor to thin out.
A standard residential driveway sub-base is typically 100 to 150mm of compacted road base over excavated and graded ground. Heavier vehicle use, soft ground or reactive clay soils require deeper preparation, sometimes with a geotextile membrane between the sub-grade and the road base. A contractor who skips compaction, skips the geotextile on reactive soils, or lays a 50mm sub-base where 150mm is required is setting up the surface to crack, settle or rut within a few years.
Drainage is the second hidden line item. Specify falls and stormwater connections for the site rather than assuming a national area threshold. Without designed falls, water pools, freezes (in cooler regions) or seeps into the sub-base, eroding the very layer that supports the surface. Where the driveway sits on a slope, additional drainage such as ag-line or surface channels may be required. The Builtly guide on building on a sloped block in Australia covers slope-related drainage and retaining considerations that apply to driveway scope.
Verify the sub-base specification before signing. A legitimate quote will state the road base depth in millimetres, the compaction method (typically vibrating plate or roller depending on area), and whether a geotextile is included. The drainage line should specify falls, channel locations if any, and the stormwater connection point. If the quote says "site preparation" with no detail, ask for the specification in writing.
Common cost-cutting tactics that fail include: laying concrete directly on excavated ground without a road base layer; pouring 75mm concrete where 100mm is the residential minimum; omitting reinforcement mesh on slabs that will carry vehicle loads; and routing surface water onto neighbouring properties rather than into stormwater. Any of these will produce a finished driveway that looks acceptable on day one and develops visible failure within two to five years.
Decorative Finishes and Their Cost Impact
Decorative finish costs depend on the technique. Use the Archicentre additions below for coloured concrete and exposed aggregate; other decorative premiums remain indicative, with GST to be confirmed. Most homeowners pursuing a decorative finish are weighing kerb appeal and resale impact against the up-front premium. The lifespan of a decorative concrete finish is broadly the same as plain concrete - the premium pays for appearance, not durability.
Exposed aggregate is the most popular decorative concrete finish in Australia. Archicentre's 2026 allowance adds $40 to $55 per m² to the plain reinforced driveway benchmark, including GST. The finish offers excellent slip resistance on sloping driveways.
Stamped or patterned concrete uses textured mats pressed into the surface during finishing to imitate stone, brick or tile. Cost premium is roughly 30 to 70 percent above plain concrete depending on pattern complexity. The finish is sensitive to installer skill - poorly aligned patterns at joins are visible for the life of the driveway.
Coloured concrete adds $15 to $27 per m² to the plain reinforced driveway benchmark, including GST. Pigment is mixed through the concrete before pouring, so colour goes through the full depth rather than sitting on the surface. Charcoal, sandstone and terracotta tones suit Australian palettes.
Decorative paver patterns - herringbone, basketweave, soldier course borders - add labour cost rather than material cost. Pattern complexity can add 15 to 35 percent to the paver installation rate. Lippage between adjacent units is the primary defect to watch for, the same surface-level issue covered in the Builtly guide on common tiling defects in new builds in Australia.
Stone borders and edge treatments integrate the driveway with surrounding landscape and can add $50 to $200 per linear metre depending on stone type and bedding method. Stone edge treatments are often specified alongside garden bed walls and feature plantings, which sit within the broader landscape scope covered in the Builtly guide on landscaping cost in Australia.
Maintenance considerations differ across finishes. Exposed aggregate and coloured concrete benefit from resealing every three to five years. Stamped concrete may need pattern lines retouched if surface wear is heavy. Decorative pavers need joint sand topped up annually and individual unit replacement when chips occur. Stone borders need occasional re-bedding where settlement occurs.
Average Driveway Sizes and Total Cost Guide
| Driveway type | Approx. size | Plain concrete | Exposed aggregate | Pavers |
|---|---|---|---|---|
| Single car | 15 - 25m² | about $1,600 - $3,150 | about $2,200 - $4,500 | about $1,200 - $5,000 |
| Double car | 30 - 50m² | about $3,150 - $6,250 | about $4,350 - $9,000 | about $2,400 - $10,000 |
| Long access driveway | 60 - 100m² | about $6,300 - $12,500 | about $8,700 - $18,000 | about $4,800 - $20,000 |
| Rural / acreage example | 200m² | about $21,000 - $25,000 | about $29,000 - $36,000 | about $16,000 - $40,000 |
Driveway Installation - What to Expect
Site assessment
The contractor inspects the site, measures the area, assesses slope, drainage and sub-base condition and identifies any access constraints.
Existing surface removal
If required, the old driveway is removed and disposed of.
Excavation and sub-base preparation
The site is excavated to the required depth, graded for drainage and compacted.
Formwork or edge setting
For concrete and paver installations, formwork is set to define the driveway edges and control depth.
Material installation
Concrete is poured and finished, asphalt is laid and compacted, or pavers are laid on a prepared base.
Curing or setting
Concrete requires at least 24 to 48 hours before light foot traffic and seven days before vehicle use. Asphalt can generally be driven on within 24 to 48 hours.
Sealing
Many materials benefit from a sealer applied after curing to protect the surface and enhance appearance.
Council crossing work
If required, the crossing from kerb to property boundary is completed by a council-approved contractor.
Council Crossings and Permit Requirements by State
A driveway crossing is the section of pavement between the kerb and your property boundary. It sits on land controlled by the local council or state road authority rather than on your title, so it is regulated differently to the driveway on your own land. In almost every Australian local government area, a new or upgraded crossing requires a permit, and the construction work itself must be carried out by a contractor on the council's approved list. The crossing fee is almost always quoted as a separate line item from the driveway proper. Before committing to driveway works, check whether a development application is needed separately from road-reserve approval. Confirm who is responsible for landscaping so driveway levels, drainage and handover scope are coordinated.
Permit fees, application timelines and approved-contractor lists vary by council, but the typical pattern is consistent: an application with site plan and crossing detail, an assessment fee, and an inspection at completion. Allow one to three weeks for processing in metropolitan areas and longer in regional councils. Archicentre's 2026 crossover allowance is $4,500 to $7,000 for single-car width and $7,800 to $10,000 for double-car width, including GST. Quote this separately from the private driveway and confirm council fees, kerb works and traffic management inclusions.
New South Wales: Local council application via the relevant LGA. Sydney metro councils generally publish standard crossing drawings and an approved-contractor list. Allow three to six weeks for processing and inspection.
Victoria: Local council vehicle crossing permits. Most metropolitan Melbourne councils maintain a Standard Drawing and an approved-contractor register. Inner-city councils may require traffic management plans for crossings on busy roads.
Queensland: Local government approval. Brisbane City Council, Gold Coast and Sunshine Coast each publish their own standard drawings and processes. Where the crossing connects to a state-controlled road, additional Department of Transport and Main Roads approval may apply.
Western Australia: Local government approval. Crossings onto Main Roads WA-managed roads require additional approval. Perth metro councils typically issue permits within two to four weeks.
South Australia: Local council approval. Adelaide metro councils publish standard crossing details and require council-approved contractors for the kerb and footpath sections.
Tasmania: Local council approval. Hobart, Launceston and surrounding councils each maintain crossing permit processes; allow additional time in regional areas.
Northern Territory: City of Darwin or the relevant local authority. Crossings on territory-controlled arterials require Department of Infrastructure approval.
Australian Capital Territory: Access Canberra administers driveway and crossing approvals. Standard residential crossings are generally a streamlined application.
Always verify current permit requirements, fees and approved-contractor lists directly with the relevant local council before signing any driveway contract. Crossings are the single most common source of programme delay on driveway projects, so resolve the permit pathway before committing to a start date. For broader permit context across new construction, refer to the Builtly guide on building permits in Australia.
How to Choose a Driveway Contractor
- Check the contractor holds a current licence for your state (e.g. QBCC in Queensland, licence search available via state licensing authority)
- Confirm the contractor is insured for public liability and workers compensation
- Get at least three itemised quotes from local contractors - not just a total price
- Ask to see recent completed projects and contact references
- Confirm the quote includes sub-base preparation, formwork, supply and disposal - not materials only
- Check whether the quote includes council crossing works or whether this is separate
- Ask about curing time, traffic restrictions and when the driveway can be driven on
- Confirm the warranty period for the completed work
For more detail on comparing contractor quotes refer to the Builtly guide on How to Compare Quotes From Builders in Australia. To verify a contractor's licence in Queensland refer to the QBCC Licence Check guide. For guidance on whether online reviews are a reliable way to assess contractors, read the Builtly guide on Are Google Reviews Reliable for Builders?
For a comprehensive framework on vetting any contractor before signing refer to the Builtly guide on How to Vet a Builder in Australia.
Red Flags When Reviewing Driveway Quotes
The driveway market includes a wide spread of contractor quality, from established civil and concreting firms to small operators with limited equipment and shorter trading histories. Pricing alone does not separate them - the warning signs are usually visible in the written quote and in how the contractor responds to specific questions. The list below summarises the patterns most commonly associated with substandard outcomes. For broader patterns across builder selection, refer to the Builtly guide on red flags when choosing a builder.
Warning signs in driveway quotes
- Quote missing sub-base specification. Thin or absent sub-base is the single most common cause of premature driveway failure. A legitimate quote states road base depth in millimetres and compaction method.
- No council crossing as a separate line item. Reputable quotes show the crossing permit and works as a distinct line item with the council fee called out. A single lump-sum number with no crossing detail usually means the contractor has not engaged with the permit process.
- No fall or drainage specification. Water pooling causes premature surface failure and can flow onto neighbouring properties. A correct quote specifies a fall (typically around 1 in 100) and the stormwater connection.
- Concrete thickness below industry standard for the vehicle load. Residential driveways are typically a 100mm minimum, increasing to 125 to 150mm where heavier vehicles or commercial use are expected. Any specification below 100mm warrants a hard explanation.
- No reinforcement specified for concrete driveways. Mesh or reinforcement bar is required for crack control on residential slabs carrying vehicle loads. "Plain unreinforced concrete" on a driveway specification is a red flag.
- Cash-only deposit demands. Documentation matters for warranty and dispute resolution. A contractor refusing to accept bank transfer or insisting on cash for the deposit is removing the paper trail you may rely on later.
- Quote significantly below market without a stated reason. If three quotes return $7,500, $8,200 and $4,800, the outlier is usually cutting sub-base, thickness, reinforcement or drainage. Ask the low quoter to specify exactly which line item explains the difference.
- No curing schedule discussion. Concrete needs at least 24 to 48 hours before foot traffic and around seven days before vehicle use. A contractor unwilling to commit to a curing schedule is one to walk away from.
- Refusal to provide insurance certificates. Public liability insurance is non-negotiable for any contractor working on your property. Workers compensation is required where the contractor employs labour. Both certificates of currency should be provided on request.
- Pressure to start without a written quote and contract. Legitimate contractors document scope, price, programme and payment terms in writing before commencement. Verbal-only arrangements remove the basis for any later dispute.
- Unable to explain the council crossing permit pathway. A driveway contractor who cannot articulate the local council's crossing permit process has likely not engaged with that council recently and may delay the project waiting for approvals.
- No warranty offered, or warranty under five years. Reputable concreting and paving contractors typically warrant workmanship for five to ten years and material defects in line with manufacturer terms. A short or absent warranty is a signal about how the contractor expects the work to perform.
Maintenance Lifecycle and When to Replace vs Reseal
Driveway lifespan varies significantly by material and maintenance. Plain and coloured concrete typically lasts 25 to 40 years before structural replacement is warranted. Exposed aggregate and decorative concrete sit in the same range when properly sealed. Concrete and brick pavers can last 30 to 50 years because individual units can be lifted and re-levelled or replaced rather than requiring full replacement. Asphalt and bitumen typically last 15 to 25 years and benefit from a reseal every two to five years to extend life.
The decision between reseal, repair and full replacement depends on the underlying condition. A surface showing fading, light surface wear or minor stains is a reseal candidate. A surface with isolated cracks, settled pavers or small areas of failure is a repair candidate - repaired sections rarely match the surrounding surface visually but extend life cost-effectively. A driveway with widespread structural cracking, significant settlement, sub-base failure or vehicle-damaging defects is a replacement candidate.
Resealing costs typically run 10 to 20 percent of the original installation cost, depending on material and surface area. Spot repair pricing is highly variable and often quoted as a minimum call-out plus per-unit or per-square-metre rate. Full replacement involves removal and disposal of the existing surface - typically $500 to $3,000 - plus the installed cost of the new driveway.
Watch for material-specific warning signs. Concrete surfaces show hairline cracks first, then alignment cracks across the slab, then settlement at the perimeter. Pavers show jointing sand loss, then individual unit movement, then settled or rocking pavers. Asphalt surfaces show colour fading, then surface stripping, then potholes. Where any of these signs cover more than approximately 20 percent of the surface, replacement is usually more cost-effective than ongoing repair.
Driveway Materials Compared - Which Is Best for Your Property?
| Material | Best for | Not ideal for |
|---|---|---|
| Gravel | Acreage, rural, budget installs | Steep driveways, tight suburban blocks |
| Asphalt | Large driveways, acreage, budget-conscious | Small suburban driveways (minimum size restrictions) |
| Plain concrete | Most suburban homes, functional finish | Luxury presentation |
| Exposed aggregate | Mid to high-end homes, grip needed, kerb appeal | Tight repair budgets |
| Pavers | High kerb appeal, premium finish, heritage homes | Large rural driveways |
| Natural stone | Luxury homes, statement entry | Most budgets |
Driveways are often part of a broader outdoor project. For related outdoor costs refer to the Builtly guides on Outdoor Living Cost Australia and Fencing Cost Australia. If you are building a new home, the Building a House Checklist covers all the items to plan for including external works like driveways. For a companion guide on garage door types, materials and costs refer to the guide on garage door types in Australia. Where the driveway needs to support an EV charging pathway from the street or garage, the Builtly guide on all-electric new homes in Australia covers cable routing, conduit and electrical scope that should be coordinated with the driveway pour.
BUILTLY and Driveway Contractor Verification
A residential driveway is typically a $5,000 to $50,000 project, with the upper end reached on long acreage driveways, premium paver installations and natural stone surfaces. The cost is high enough to warrant the same due diligence a homeowner would apply to any other substantial trade engagement, and the defect risk if the work is poorly installed is substantial - sub-base failure, drainage failure and surface cracking are all expensive to remediate after the fact.
Driveway contractors also operate at the intersection of several other trades and regulatory pathways. The council crossing permit involves a local government approved-contractor list. The drainage scope intersects with stormwater and, on some sites, with landscape design and retaining walls. The finished surface needs to coordinate with fencing returns, gate openings and any EV charger conduit. Verifying a contractor's record across that scope is harder than verifying a single-trade reference.
BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
To stay informed about the launch or to discuss verification for your driveway project, get in touch.
Frequently asked questions
How much does a concrete driveway cost in Australia?
Archicentre's 2026 benchmark for a 100mm reinforced plain concrete driveway is $105 to $125 per m² including GST. At 15 to 25m², the single-car example is about $1,600 - $3,150. At 30 to 50m², the double-car example is about $3,150 - $6,250. These area-times-rate examples exclude separately quoted crossovers and unusual site works.
Is concrete or asphalt cheaper for a driveway?
The retained indicative asphalt range is $40 to $110 per m², compared with the plain concrete benchmark of $105 to $125 including GST. The ranges overlap and asphalt's GST basis is not verified. Compare quotes on the same GST, preparation and area basis; minimum charges can change the result.
Do I need council approval to build a driveway in Australia?
The driveway on your own property generally does not require council approval, but the driveway crossing - from the kerb to your property boundary - typically does require a crossing permit. Kerb and channel work must be completed by a council-approved contractor in most states. Requirements vary by council so it is always worth checking with your local council before starting work.
How long does a driveway last in Australia?
Lifespan varies significantly by material. Plain and decorative concrete typically lasts 25 to 40 years. Exposed aggregate and paver driveways can last 25 to 50 years with appropriate maintenance. Asphalt and bitumen driveways typically last 15 to 25 years and benefit from sealing every two to five years. Gravel driveways require ongoing top-ups but the base can last 10 to 15 years before major work is needed.
What is the cheapest driveway option in Australia?
Gravel has the lowest retained indicative rate at $20 to $45 per m². Its GST basis needs confirmation in the quote. The calculator compares the same area across materials but minimum charges, preparation and access may change the ranking.
How long does it take to install a typical residential driveway?
A standard residential driveway installation typically takes between three and seven working days from site arrival to completion, depending on material, site condition and weather. Concrete driveways generally take two to three days for excavation, formwork and pouring, followed by a curing period of at least seven days before vehicle use. Paver driveways often take four to seven days because each unit is laid by hand on a prepared base. Asphalt driveways can be completed in one to two days for the laying itself, with traffic permitted within 24 to 48 hours. Add one to three weeks at the front of the programme for the council crossing permit if a new or upgraded crossing is required.