Advice

Who Is Responsible for Landscaping in a Construction Project

Last updated: October 2026

Landscaping responsibility is one of the most consistently misunderstood aspects of residential construction in Australia. Most homeowners assume the builder will handle landscaping as part of the construction contract. Most builders include only the minimum landscaping required for the occupancy certificate - typically a basic grass seed or turf strip at the front boundary and nothing else. The gap between what homeowners expect and what builders deliver in landscaping is one of the most common sources of disappointment at handover. Understanding who is responsible for what, what is typically included in a building contract, what must be arranged separately and how to coordinate the full landscape scope is essential before construction commences.

The core landscaping responsibility question

In most Australian residential construction contracts, the builder is responsible for a defined and typically minimal scope of landscaping - usually whatever is required to obtain the occupancy certificate and comply with the development approval conditions. Everything beyond that minimum scope is the homeowner's responsibility to arrange separately.

The specific landscaping included in any building contract depends entirely on what is documented in that contract. There is no standard - landscaping inclusions vary significantly between volume builders, custom builders and design-and-construct arrangements. The only reliable way to know what landscaping your builder is responsible for is to read the contract and ask for a written inclusions schedule that specifically lists every landscaping item.

The practical consequence of this is that most homeowners take possession of a completed home with a bare soil site - or at best a minimal turf strip at the front - and must then arrange and fund the full landscape development themselves, typically at a cost of $20,000 to $100,000 or more depending on the site size and specification.

Who is responsible for what in landscaping

Landscaping elementBuilder's responsibilityHomeowner's responsibilityNotes
Site clearing and levelling during constructionYes - part of site preparationNoBuilder clears and levels the building pad as part of construction
Retaining walls - required for buildingYes - if required for structural or drainage reasons related to the buildingShared - decorative or landscape retaining walls are homeowner's scopeConfirm which retaining walls are in the building contract
Drainage - site drainage tied to buildingYes - stormwater drainage connected to the buildingShared - garden drainage beyond the building connection pointConfirm drainage scope in the contract
DrivewaySometimes - depends on contractOften - especially in custom homesVolume builders often include a basic concrete driveway - custom builders often exclude
PathwaysRarely - front entry path sometimes includedUsually - all other pathwaysConfirm front entry path inclusion explicitly
Front boundary fencingRarely - sometimes included in volume builder contractsUsually - homeowner arrangesCheck the development approval conditions for fencing requirements
Side and rear fencingAlmost neverYes - homeowner arrangesFencing agreements with neighbours may be required
Turf or lawnMinimal - front strip or development approval requirement onlyYes - full gardenVolume builders may include a basic turf allowance - confirm extent
Garden beds and plantingNeverYes - homeowner arrangesNo builder includes planting in a standard residential contract
Irrigation systemNeverYes - homeowner arrangesMust be installed before turf and garden beds are established
Garden lightingNever - conduit sometimes includedYes - homeowner arrangesElectrical conduit for garden lighting should be pulled during construction
PoolOnly if specifically included in the building contractUsually - homeowner arranges separatelyPool construction timing must be coordinated with the builder
LetterboxSometimes - basic letterbox in volume builder contractsUsually - homeowner selects and installsConfirm inclusion explicitly
ClotheslineSometimes - basic clothesline in volume builder contractsUsually - homeowner selects and installsSome development approvals require a clothesline
External bin storageNeverYes - homeowner arrangesSome councils require screened bin storage - check development approval

Landscaping scope by contract type

Contract typeTypical inclusionsAlmost always excludedNotes
Volume builder - house and land packageBasic concrete driveway, front turf strip, letterbox, clothesline, front boundary pathAll garden beds, side and rear lawn, planting, irrigation, pool, fencing, garden lightingInclusions described in marketing do not always match contract inclusions - confirm in writing
Volume builder - standard contractBasic driveway, minimal front turf, letterboxMost landscaping - garden, fencing, irrigation, lighting, poolRead inclusions schedule carefully - standard inclusions vary by builder
Custom home builderOften excluded entirely except site clearing and basic drainageAll landscaping - driveway, paths, fencing, lawn, planting, irrigation, lighting, poolCustom builders typically price construction only - landscape is a separate engagement
Design and constructDepends on the contract scope - confirm explicitlyVaries - some D&C contracts include full landscape design and construction, others excludeD&C contracts can include landscape if specified at contract stage
Duplex or multi-residential developmentCommon areas drainage and basic hardscaping may be includedIndividual lot landscaping - each dwelling's garden is typically excludedStrata plan landscaping obligations may differ from individual lot obligations

What the development approval may require

Development approval conditions often include landscape requirements that must be met before the occupancy certificate is issued. These are not optional - they are conditions of the approval and the building certifier will check them before issuing the occupancy permit.

Common development approval landscape conditions include:

  • Minimum landscaping area. Many councils specify a minimum percentage of the site that must be soft landscaped - covered in lawn, garden beds or other permeable surfaces rather than impermeable paving. Confirm this requirement with the council before finalising the landscape plan.
  • Street tree planting. Some councils require street trees to be planted in the verge as a condition of approval. The species, size and location are typically specified by the council. Confirm with the builder whether street tree planting is included in the contract or is the homeowner's responsibility.
  • Boundary screening. Some development approvals require landscaping along side and rear boundaries to screen the development from neighbouring properties. Confirm whether screening planting is required and who is responsible for providing it.
  • Erosion and sediment control. Some development approvals require that the site is stabilised - with turf, mulch or other cover - before the occupancy certificate is issued. This is typically the builder's responsibility as part of the construction scope.
  • Retaining walls and drainage. Development approvals for sloped sites frequently include conditions about retaining walls and drainage that must be completed before occupancy. Confirm which retaining walls and drainage elements are conditions of approval and confirm they are included in the building contract.

The landscape architect's role

A landscape architect is the professional who designs the landscape - hardscaping and softscaping - as an integrated whole. On custom homes and development projects where the landscape is a significant element of the outcome, engaging a landscape architect is strongly recommended.

When is a landscape architect engaged

On architect-designed custom homes, the landscape architect is often engaged alongside the architect - typically during design development, before the development approval is lodged. The landscape design is coordinated with the architectural design and incorporated into the DA documentation where required. Accurate site level information from a contour survey and a site survey is essential for the landscape architect to design retaining walls and drainage correctly.

On volume builder and standard residential projects, the homeowner typically arranges a landscape architect or landscape designer after practical completion - once the building is complete and the landscape scope can be confirmed. This is later than ideal - a landscape architect engaged before construction commences can influence the builder's site preparation, drainage design and the location of conduit for garden lighting and irrigation. Understanding what happens at each stage of building a home helps clarify where landscaping fits in the construction sequence.

Who engages the landscape architect

On custom homes, the landscape architect is typically engaged by the homeowner directly - sometimes on the architect's recommendation. On development projects, the developer engages the landscape architect as part of the project team. On volume builder projects, the homeowner arranges the landscape architect independently.

The pool coordination problem

Swimming pool construction is one of the most common coordination challenges in residential construction - and one where the responsibility question is most frequently unclear.

Who builds the pool

Most residential building contracts do not include pool construction - the pool is a separate contract between the homeowner and a licensed pool builder. However pool construction must be coordinated with the overall building programme because:

  • The pool shell requires significant earthmoving that must occur before surrounding paving is installed
  • The pool fencing - required before the pool is filled - must be installed and certified before the pool is used
  • Pool filtration and equipment connections require coordination with the electrician and plumber
  • The pool area landscaping cannot be completed until the pool shell and coping are finished

If the pool is not planned and contracted early enough, the builder completes the construction, the surrounding paving is laid and the pool builder then faces significantly higher costs excavating through or around completed hardscaping.

The correct sequence

The pool builder should be engaged and the pool shell constructed during or immediately after the main construction - before surrounding paving is completed. Confirm with both the builder and the pool builder that their programmes are coordinated before construction commences.

See the companion guide Building a Pool in Australia for the full pool planning framework.

The garden lighting coordination problem

Garden lighting is one of the elements where builder responsibility and homeowner responsibility most commonly fail to connect - resulting in expensive retrospective cable installation after the landscape is established.

The builder's electrical subcontractor installs the home's electrical infrastructure during the rough-in stage - before walls and surfaces are finished. If garden lighting conduit is not specified and installed during this stage, all garden lighting cabling must be installed retrospectively - through finished paving, under established lawn and around plant root systems. This retrospective installation is significantly more expensive and more disruptive than installation during construction.

Who is responsible for garden lighting conduit

This depends entirely on the contract. In most standard residential contracts, the builder's scope includes conduit for the home's internal electrical rough-in only - garden lighting conduit is not included unless it is specifically documented in the contract.

If garden lighting is important to the homeowner, the garden lighting design should be completed - at least at a preliminary level - before the electrical rough-in commences, and the required conduit runs should be added to the builder's electrical scope as a variation if not already included.

See the companion guide Garden Lighting Australia: Costs, Types and What to Know for the complete garden lighting planning framework.

Landscaping coordination checklist

Confirm exactly what landscaping is included in the building contract - request a written inclusions schedule before signing

Confirm what development approval conditions require for landscaping - obtain a copy of the DA conditions before construction commences

Confirm retaining wall scope - which walls are in the building contract and which are the homeowner's responsibility

Confirm drainage scope - what stormwater drainage is in the building contract and what must be arranged separately

Engage a landscape architect or designer before construction commences - so the landscape design can inform the builder's site preparation and drainage decisions

Confirm garden lighting conduit is included in the builder's electrical scope - or add it as a variation before the electrical rough-in commences

Confirm irrigation mainlines are planned before paving is laid - retrospective irrigation installation requires cutting through completed surfaces

Engage a pool builder early if a pool is planned - coordinate the pool programme with the builder's construction programme before paving commences

Confirm the sequence for hardscaping and softscaping - all hardscaping must be complete before softscaping commences

Confirm who is responsible for soil preparation and topsoil - particularly if the site has been heavily disturbed during construction

Do not finalise the landscape budget until the building contract is signed and the full landscape scope is confirmed - the gap between builder inclusions and homeowner expectations is often $30,000 to $80,000

Red flags

Building contract does not include a specific landscaping inclusions schedule - described only as standard inclusions or per plans
Builder describes landscaping inclusions verbally during the sales process without confirming them in the written contract
Development approval landscape conditions have not been reviewed before the building contract is signed - conditions may require landscaping that the builder has not included
Garden lighting conduit is not in the builder's electrical scope and no provision has been made before the electrical rough-in stage
Pool is planned but no pool builder has been engaged and no programme coordination has occurred with the builder
Irrigation system has not been planned before paving commences - retrospective installation will require cutting through completed surfaces
Landscape architect or designer is not engaged until after practical completion - too late to influence builder's site preparation and drainage decisions
Full landscape budget has not been established before signing the building contract - landscape costs are frequently $30,000 to $100,000 or more beyond the builder's inclusions

BUILTLY and lasting project records

BUILTLY is building a record of completed Australian homes that credits the builder, landscape designers and trades behind each one.

BUILTLY is building a record of completed Australian homes that credits the builder, landscape designers and trades behind each one.

BUILTLY is building a record of completed Australian homes that credits the builder, landscape designers and trades behind each one.

Frequently Asked Questions

Is the builder responsible for landscaping in Australia?

In most Australian residential building contracts, the builder is responsible for only a minimal scope of landscaping - typically whatever is required to obtain the occupancy certificate and comply with development approval conditions. This usually means basic site clearing, minimal front turf or lawn, a concrete driveway and sometimes a front boundary path. Everything beyond this minimum - garden beds, full lawn, planting, irrigation, fencing, pool, garden lighting - is the homeowner's responsibility to arrange and fund separately. The only reliable way to confirm what your builder is responsible for is to read the contract and request a written inclusions schedule that lists every landscaping item explicitly.

What landscaping is typically included in a building contract in Australia?

Volume builder contracts typically include a basic concrete driveway, a front turf strip, a letterbox and a clothesline - occasionally a front boundary path. Custom builder contracts typically include only site clearing and basic drainage - most landscaping is excluded entirely. Neither contract type typically includes garden beds, full lawn, planting, irrigation systems, fencing, pool construction or garden lighting. If the marketing materials for a builder show lush landscaping, confirm which specific elements are included in the contract before signing - marketing imagery consistently shows landscaping that is not included in the building contract price.

When should I engage a landscape architect for a new home?

Before construction commences - ideally during the design development stage alongside the architect. A landscape architect engaged early can influence the builder's site preparation decisions, drainage design and the location of conduit for garden lighting and irrigation. These decisions are difficult and expensive to reverse after construction is complete. A landscape architect engaged after practical completion - the most common timing - has no ability to influence these decisions and the homeowner typically pays a significant premium for retrospective installation of garden lighting conduit and irrigation systems.

Who is responsible for the pool in a new home construction project?

In most cases the homeowner - pool construction is almost never included in a standard residential building contract. The pool is typically a separate contract between the homeowner and a licensed pool builder. However pool construction must be coordinated with the builder's construction programme - the pool shell requires significant earthmoving that should occur before surrounding paving is completed. If the pool programme is not coordinated with the builder, the surrounding paving is completed before the pool shell is excavated, creating significantly higher pool construction costs and damage to completed landscaping. Engage the pool builder early and confirm programme coordination with the builder before construction commences.

What landscaping must be completed before the occupancy certificate is issued?

The development approval conditions define what landscaping must be completed before the occupancy certificate is issued - and these conditions vary by council and project. Common conditions include minimum soft landscape coverage - a specified percentage of the site must be permeable surface rather than paving - street tree planting in the verge, boundary screening planting and erosion control coverage of the site. The builder is typically responsible for meeting these conditions as part of the construction contract - but confirm which conditions apply to your project and confirm they are addressed in the building contract before signing. The building certifier checks development approval landscape conditions before issuing the occupancy certificate.