Advice

Softscaping vs Hardscaping: What Each Covers and What to Plan First

Last updated: October 2026

Softscaping and hardscaping are the two fundamental categories of landscape design - together they define everything that happens outside the building envelope of a home. Hardscaping covers the hard built elements - paving, retaining walls, driveways, pergolas, pools and water features. Softscaping covers the living elements - lawn, garden beds, trees, shrubs, groundcovers and planting. Understanding the distinction matters practically because hardscaping and softscaping are designed, budgeted, sequenced and maintained differently - and because getting the sequence wrong is one of the most common and expensive mistakes in residential landscaping. This guide explains what each category covers, what each costs and how to plan them correctly for a new home or renovation.

What is hardscaping?

Hardscaping refers to the hard, non-living structural elements of a landscape - the built infrastructure that defines the form, function and spatial organisation of an outdoor environment. Hardscaping is permanent or semi-permanent, requires structural design and engineering for some elements, and is almost always installed before softscaping commences.

Hardscaping elements in Australian residential projects include:

  • Driveways - concrete, exposed aggregate, asphalt, pavers or gravel
  • Pathways - paved connections between entry points, outdoor spaces and garden areas
  • Patios, terraces and entertaining areas - paved outdoor living surfaces
  • Retaining walls - structural walls that manage level changes and retain soil
  • Garden edging and borders - defining the boundary between paved surfaces and garden beds
  • Steps and level changes - connecting different elevations across the site
  • Pergolas, shade structures and outdoor roofs - structural overhead elements
  • Fencing and boundary walls - perimeter definition and privacy structures
  • Pools and spas - structural water features requiring engineering and compliance
  • Water features - ponds, fountains and water walls
  • Outdoor kitchens and built-in barbecues - permanent outdoor cooking infrastructure
  • Drainage infrastructure - subsoil drainage, surface channels, stormwater management
  • Lighting infrastructure - conduit, cabling and in-ground fittings installed before paving

Hardscaping defines the bones of the landscape - the permanent structural framework within which softscaping is planted and maintained.

What is softscaping?

Softscaping refers to the living, horticultural elements of a landscape - the plants, lawn, mulch and soil that fill and animate the structural framework established by the hardscaping. Softscaping is dynamic - it grows, changes with the seasons and requires ongoing maintenance in a way that hardscaping does not.

Softscaping elements in Australian residential projects include:

  • Lawn - turf or seed-established grass areas
  • Garden beds - planted areas containing shrubs, perennials, groundcovers and annuals
  • Trees - feature trees, shade trees, screening trees and fruit trees
  • Shrubs and hedges - structural planting for privacy, screening and form
  • Groundcovers - low-growing plants covering garden bed surfaces
  • Climbers and vines - plants trained over fences, pergolas and structures
  • Mulch - organic or inorganic ground cover material suppressing weeds and retaining moisture
  • Topsoil and soil amendment - preparing the growing medium for planting
  • Irrigation systems - automated watering infrastructure for lawn and garden beds
  • Planter boxes and raised garden beds - contained growing environments

Softscaping defines the texture, colour, seasonal character and ecological function of the landscape. It is the element that most significantly changes the appearance of the property over time as plants establish and mature.

Softscaping vs hardscaping - head to head

FactorHardscapingSoftscaping
DefinitionHard built structural elements - paving, walls, structures, poolsLiving horticultural elements - plants, lawn, trees, garden beds
PermanencePermanent or semi-permanentDynamic - grows and changes over time
Installation sequenceFirst - hardscaping must be complete before softscaping commencesSecond - installed into the framework established by hardscaping
Structural engineeringRequired for retaining walls, pools, pergolas and major structuresNot required - horticultural knowledge and design skill
Relevant professionalLandscape architect, landscape designer, civil engineer for drainageLandscape architect, landscape designer, horticulturalist
Maintenance requirementLow - periodic cleaning, sealing, inspectionHigh - regular watering, pruning, fertilising, weeding
Cost driversMaterials - paving, stone, structural steel, concrete - and labourPlants, soil preparation, irrigation, ongoing maintenance
Typical cost proportion60 to 70 percent of total landscape budget30 to 40 percent of total landscape budget
Resale impactImmediate - hardscaping is visible and valued at completionLong term - softscaping increases in value as it matures
Coordination with constructionMust be coordinated with builder - drainage, electrical rough-in, structural tie-insMinimal construction coordination - installed after building is complete

Hardscaping elements and costs

ElementTypical cost rangeNotes
Concrete driveway$80 to $150 per m²Exposed aggregate and decorative finishes at higher end
Paver driveway$120 to $250 per m²Depends on paver type - concrete, clay or natural stone
Paved patio or terrace$100 to $300 per m²Depends on material - concrete, porcelain, natural stone
Timber deck$300 to $600 per m²Hardwood at higher end - composite decking similar range
Retaining wall - concrete block$300 to $600 per linear metreDepends on height and engineering requirements
Retaining wall - natural stone$500 to $1,200 per linear metreHighly variable - dry stack or mortared
Pergola - steel$15,000 to $40,000Depends on size, complexity and finish
Pergola - timber$10,000 to $30,000Hardwood at higher end
Pool - concrete$60,000 to $120,000+Excludes fencing, landscaping and equipment
Pool - fibreglass$35,000 to $65,000Excludes fencing, landscaping and equipment
Boundary fencing - colorbond$80 to $150 per linear metreDepends on height and site conditions
Garden steps - poured concrete$500 to $1,500 per stepDepends on width and finish
Subsoil drainage system$3,000 to $15,000Highly variable with site conditions
Outdoor kitchen - built in$15,000 to $50,000+Depends on appliances and finish level

Softscaping elements and costs

ElementTypical cost rangeNotes
Turf supply and lay - standard$15 to $30 per m²Depends on turf variety and site preparation required
Turf supply and lay - premium$25 to $50 per m²Sir Walter, Kikuyu or similar premium varieties
Garden bed preparation$30 to $80 per m²Topsoil, soil amendment, weed matting and mulch
Feature tree - advanced$500 to $5,000+ per treeDepends on species, pot size and crane requirements for large specimens
Shrubs and hedging plants$20 to $200 per plantDepends on species and pot size
Groundcovers$8 to $30 per plantDepends on species and coverage
Mulch supply and spread$80 to $150 per m³ installedOrganic or inorganic mulch
Irrigation system - residential$3,000 to $12,000Depends on property size and system complexity
Planter boxes - built in$500 to $3,000 per boxDepends on material, size and drainage requirements
Full garden design and planting - standard$8,000 to $25,000Design, soil preparation, plants, mulch and irrigation
Full garden design and planting - large$25,000 to $80,000+Large sites, complex topography, premium plant species

The planning sequence - what to do first

The single most important practical principle in residential landscaping is sequence - hardscaping must be planned and largely completed before softscaping commences. Getting this sequence wrong is the most common and expensive landscaping mistake.

Why hardscaping comes first: Hardscaping installation is disruptive - it involves earthmoving, concrete pours, heavy materials delivery and machinery access. Installing hardscaping into an established softscape destroys lawn, damages plants and compacts soil. Soil compaction from machinery in an established garden bed can damage root systems and kill plants that took years to establish.

Hardscaping also requires infrastructure that must be installed before paving is laid - drainage, electrical conduit for garden lighting, irrigation mainlines and any below-surface services. These cannot be retrospectively installed without breaking up completed paving surfaces.

The correct landscaping sequence for a new home:

Confirm hardscaping design is complete before construction commences - drainage, electrical conduit for garden lighting, pool structural design and retaining wall design should all be resolved during the design phase

Coordinate hardscaping infrastructure with the builder during construction - electrical conduit for garden lighting pulled before concrete is poured, subsoil drainage tied into the site drainage system, pool shell constructed during or immediately after main construction

Complete all hardscaping - paving, retaining walls, pergola, pool fencing, boundary fencing, steps and paths - before any softscaping commences

Install irrigation mainlines and sublines before turf and garden beds are established - not after

Prepare soil before planting - topsoil, soil amendment and weed matting installed before plants go in

Install feature trees first - they require the most space, the most soil preparation and the longest establishment period

Install shrubs and structural planting second - the framework planting that defines garden bed structure

Install groundcovers and lawn last - they fill in around the established structural planting

Install garden lighting fittings last - into conduit already installed during construction or hardscaping

How hardscaping and softscaping work together

Good landscape design integrates hardscaping and softscaping as a coherent whole - not as two separate projects completed in sequence with no design relationship between them.

The proportions matter. A landscape that is predominantly hardscaping - large paved areas with minimal planting - feels hot, hard and unwelcoming in the Australian climate. A landscape that is predominantly softscaping with minimal structure - large lawn areas with informal planting - lacks the spatial definition that makes outdoor living areas function well. The most successful residential landscapes balance hardscaping structure with softscaping softness.

The materials should be coordinated. The stone or paving selected for the hardscaping should relate to the materials used in the building - complementing the cladding, the flooring visible through glazing and the architectural language of the home. Similarly the plant palette should be selected to complement the hardscaping materials - warm-toned stone suits warm-toned planting, cool grey pavers suit a more restrained green and white palette.

The views from inside matter as much as the experience outside. The landscape is experienced from inside the home as much as from within it - particularly in Australian homes where large glazing systems connect interior and exterior spaces. The primary garden beds, feature trees and structural planting should be positioned to compose well from the key interior vantage points - the kitchen, the living room, the main bedroom.

Coastal landscaping considerations

For homes within the coastal corrosion zones - within one kilometre of the ocean or tidal water - both hardscaping materials and softscaping plant selections require specific consideration.

Hardscaping in coastal environments: All metal elements in a coastal landscape - pergola steel, garden light fittings, pool fencing hardware, gate hardware - require marine-grade specification. Standard steel corrodes rapidly in salt air environments. Stainless steel grade 316, powder-coated aluminium with marine-grade coating and hot-dipped galvanised steel with appropriate coating systems are the appropriate specifications. See the companion guide Coastal Home Australia for the complete coastal material specification framework.

Softscaping in coastal environments: Plant selection for coastal gardens must account for salt spray, high wind exposure and sandy or low-nutrient soils common in coastal locations. Salt-tolerant species - native coastal plants, succulents, ornamental grasses - perform significantly better than species selected for inland gardens. A landscape architect or horticulturalist with specific coastal garden experience is worth engaging for planting design in direct coastal exposure zones.

Red flags in landscaping planning

Warning signs to watch for

  • Softscaping commenced before hardscaping is complete - machinery access will damage established plants and lawn
  • Garden lighting conduit not installed before paving - retrospective installation requires breaking up completed surfaces
  • Irrigation mainlines not installed before turf and garden beds - retrospective installation is disruptive and expensive
  • No drainage plan prepared before hardscaping commences - poor drainage causes waterlogging, paving movement and plant death
  • Retaining walls built without engineering certification where required - walls above one metre typically require engineering sign-off
  • Pool construction commenced after surrounding paving is complete - pool shell construction requires significant earthmoving that damages completed paving
  • Standard steel specified for pergola, garden lighting or pool fencing on a coastal site - will corrode within two to three years in direct coastal exposure
  • Hardscaping and softscaping planned independently with no coordination - materials and plant palette are mismatched in the completed landscape
  • No coordination between landscape irrigation and garden lighting cable routes - irrigation trenching cuts through lighting cables

BUILTLY and lasting project records

BUILTLY is building a record of completed Australian homes that credits the builder, landscape designers and trades behind each one.

BUILTLY is building a record of completed Australian homes that credits the builder, landscape designers and trades behind each one.

For more on landscaping and construction planning, see our guides on Landscaping Costs Australia, Garden Lighting Australia: Costs, Types and What to Know, Who Is Responsible for Landscaping in a Construction Project, Building on Waterfront Land Australia and Building Specification Australia.

You may also find it useful to read Contour Surveys Explained, Building a House Checklist Australia, FF&E Schedule Australia, How to Evaluate a Builder's Past Projects, What Verified Build Work Means and How Long Does It Take to Build a House in Australia.

Frequently Asked Questions

What is the difference between softscaping and hardscaping?

Hardscaping refers to the hard built structural elements of a landscape - paving, driveways, retaining walls, pergolas, pools, fencing and drainage infrastructure. Softscaping refers to the living horticultural elements - lawn, garden beds, trees, shrubs, groundcovers and planting. Hardscaping defines the permanent structural framework of the landscape. Softscaping fills and animates that framework with living elements that grow and change over time. In a residential project, hardscaping is always installed first - before softscaping commences - because hardscaping installation is disruptive and requires machinery access that would damage established plants and lawn.

What should I do first - hardscaping or softscaping?

Always hardscaping first. Hardscaping installation involves earthmoving, concrete pours, heavy materials delivery and machinery access. Installing hardscaping into an established softscape destroys lawn, damages plants and compacts soil. Hardscaping also requires below-surface infrastructure - drainage, electrical conduit for garden lighting, irrigation mainlines - that must be installed before paving is laid. These cannot be retrofitted without breaking up completed paving. Complete all hardscaping and install all below-surface infrastructure before any turf, planting or garden bed preparation commences.

How much does hardscaping cost in Australia?

Hardscaping costs vary significantly depending on the elements included and the materials selected. A concrete or paver driveway typically costs $80 to $250 per square metre. A paved patio or entertaining area costs $100 to $300 per square metre. A retaining wall costs $300 to $1,200 per linear metre depending on material and height. A pergola costs $10,000 to $40,000 depending on material and size. A concrete pool costs $60,000 to $120,000 or more excluding landscaping and fencing. Hardscaping typically represents 60 to 70 percent of the total landscape budget on a new residential project.

How much does softscaping cost in Australia?

Softscaping costs for a standard residential new home - soil preparation, turf, garden beds, structural planting, irrigation and mulch - typically range from $8,000 to $25,000. Large properties, complex topography, premium plant species and advanced feature trees push costs to $25,000 to $80,000 or more. Advanced feature trees alone can cost $500 to $5,000 or more per tree depending on species and size. Turf supply and lay typically costs $15 to $50 per square metre depending on the variety. Irrigation systems typically cost $3,000 to $12,000 depending on property size and system complexity.

Do I need a landscape architect for both hardscaping and softscaping?

A landscape architect can design both hardscaping and softscaping as an integrated whole - which is the recommended approach for new homes and significant renovations where the landscape design should relate coherently to the architecture. A landscape architect is particularly important for hardscaping elements that require engineering input - retaining walls, drainage systems, structural pergolas and pool surrounds. For softscaping only - planting design for an existing garden - a landscape designer or experienced horticulturalist may be appropriate. For complex sites, coastal properties or projects where the landscape is a significant element of the architectural outcome, a landscape architect is strongly recommended.