Whether to specify gas or go all-electric is now one of the live decisions sitting on the desk of any Australian household planning a new build. Victoria has restricted gas in most new residential builds since January 2024, the ACT is moving the same way, and even where gas remains an option the maths and the policy backdrop are shifting. This guide explains what all-electric actually means in practice, walks through each appliance category, sets out the current state policy landscape, and is honest about where the cost trade-offs land. It is informational rather than advocacy: both all-electric and mixed-fuel approaches have legitimate use cases depending on jurisdiction, site, and household.
All-electric new homes: what it actually means
An all-electric home runs entirely on electricity, with no gas connection. Cooking is induction or electric instead of gas. Hot water is heat pump or solar thermal instead of gas instantaneous. Space heating is reverse-cycle instead of ducted gas or a gas space heater. Pool heating, where the home has a pool, runs from an electric heat pump rather than a gas burner. Outdoor BBQs are typically supplied from a portable LPG bottle or run electric, rather than from a fixed natural gas connection.
The appliances that already run on electricity in a typical home (lighting, ovens, dishwashers, refrigeration, washers and dryers) stay the same. The shift is concentrated on the four appliance categories where gas has historically been the default: cooktop, hot water, space heating and pool heating.
Going all-electric usually involves a few electrical infrastructure considerations. The total electrical load is higher than in a mixed-fuel home, so switchboard capacity and the size of the incoming service need to be confirmed at design stage. Single-phase supply is sufficient for most homes, but larger houses or those planning significant EV charging may need three-phase. The hot water unit requires outdoor space for the heat pump and a sensible run to the use points. Reverse-cycle climate control, whether split, multi-split or ducted, needs early decisions on the indoor and outdoor unit positions. Where a gas connection is being removed or never installed, see what a gas fitter does in residential construction for context on the trade work that is no longer required.
All-electric is not the same thing as off-grid. An off-grid home has no grid connection at all and relies entirely on its own generation and storage. An all-electric home uses grid electricity in the normal way; it just does not use gas. Most all-electric Australian homes pair the specification with rooftop solar PV and increasingly with a battery, which together reduce reliance on grid energy without removing it.
Why this matters in 2026 is that the combination of policy direction, appliance maturity and energy economics has moved the all-electric question out of the niche-renovator category and into mainstream new-build planning. See solar panels for new homes, NatHERS rating and sustainable home building for the related decisions.
Why the all-electric question is currently topical
Several drivers have stacked up over the last few years to put electrification at the front of the new-build conversation, and they are worth separating because they pull in slightly different directions.
Policy is the most visible driver. Victoria's restriction on gas connections in most new residential builds commenced in January 2024 and applies to new houses and new apartment complexes, with some grandfathering for projects already in the planning pipeline. The ACT is progressing a similar phase-out approach. New South Wales, Queensland, South Australia, Western Australia, Tasmania and the Northern Territory still permit gas in new builds, but the federal climate commitments shaping the energy market are pushing the same direction at a slower pace.
Energy economics is the second driver. Gas wholesale prices have risen significantly in recent years, varying by state and supplier but trending upward overall. Electricity prices have also risen, but the cost of rooftop solar generation has continued to decline, which means a household pairing all-electric specification with solar shifts a meaningful share of its energy use to self-generated power. The federal Cheaper Home Batteries Program, which launched on 1 July 2025 and integrates with the existing Small-scale Renewable Energy Scheme, has improved the economics of pairing battery storage with solar. Verify current rebate amounts and eligibility at energy.gov.au or housingaustralia.gov.au before relying on specifics.
Appliance technology has matured to the point where the historical reasons to favour gas are largely resolved. Induction cooktops are faster and more responsive than gas in many ways, and now sit at price points close to gas equivalents. Heat pump hot water units typically deliver three to five times more useful heat per kilowatt-hour than conventional electric resistance, and the service network is well established. Reverse-cycle climate control performs efficiently across most Australian climate zones, including down to roughly minus five degrees Celsius outside ambient.
Building code is the fourth driver. NCC 2022 introduced the seven-star NatHERS minimum and the Whole-of-Home energy budget methodology for new residential construction, both of which often favour all-electric specification on energy modelling. The detailed treatment of NCC 2022 sits in its own guide; the relevant point here is that the building code direction reinforces the same trend.
State-by-state policy landscape
Energy and gas policy is administered separately in each state and territory, and the direction is shifting. The summary below is a current snapshot. The landscape is evolving rapidly, so verify the position with the relevant state authority before relying on specifics for a project.
Victoria
Victoria's restriction on gas connections in most new residential builds commenced in January 2024. It applies to new houses and new apartment complexes, with some grandfathering for projects already in the development pipeline at the time of commencement. Existing homes are not required to switch. The policy is part of Victoria's broader renewable energy targets and gas substitution roadmap.
Australian Capital Territory
The ACT is progressing a phase-out approach to new gas connections, with timelines that vary by location and development category. Verify current details at planning.act.gov.au.
New South Wales
NSW currently permits gas in new builds and has not announced a state-level restriction. Various encouragement schemes exist for electrification, particularly through the Energy Savings Scheme.
Queensland
Queensland currently permits gas in new builds. Local government areas may have specific requirements in some cases. Energy schemes encourage but do not mandate electrification.
South Australia
South Australia currently permits gas in new builds. High electricity prices have driven historically strong solar uptake, and electrification incentives exist at the state level.
Western Australia
WA currently permits gas in new builds. Mains gas reticulation is limited in many regional areas, where LPG is more common. The state has not announced a restriction.
Tasmania
Tasmania currently permits gas in new builds. Mains gas penetration has historically been lower than mainland averages, and the cold climate puts heating decisions front and centre regardless of fuel choice.
Northern Territory
The NT currently permits gas in new builds where reticulation is available. Tropical climate considerations dominate appliance choice, particularly on cooling and hot water.
For the broader pattern of how state-by-state regulation interacts with builder selection and verification, see how to check a builder's licence.
How all-electric specification works for cooking
The cooking decision in an all-electric home comes down to induction or, less commonly, ceramic radiant electric. Gas cooktops are not an option in Victorian new builds and are increasingly an active choice rather than a default elsewhere.
Induction cooktops generate heat directly inside the cookware via electromagnetic induction. The cooktop surface itself stays comparatively cool, and the energy transfer is highly efficient because almost all of the energy ends up in the pan rather than radiating into the surrounding kitchen. The control response is fast (faster than gas in many ways) and the heat-up time on water is noticeably shorter than gas. Surfaces are easier to clean because spilled food does not bake onto a hot element.
The practical considerations are honest rather than disqualifying. Induction requires ferrous-base cookware; most modern cookware works, but a stainless or cast iron base is needed and aluminium-only or copper-only pans do not. People with cardiac pacemakers should consult medical advice, although this affects a small minority of households. Wok cooking is harder on a flat induction surface than over a gas flame, although purpose-made induction wok rings and induction-compatible woks have improved. Most cooks adapt to the responsiveness of induction within two to three weeks, and many prefer it afterward.
Ceramic radiant electric cooktops use resistance heating beneath a ceramic surface. They are cheaper to buy than induction but slower to heat, less responsive to control changes, and noticeably less efficient. They are usually a budget-driven default rather than an active choice, and induction is the better all-electric option for most households.
A practical sequencing note for households nervous about the switch. Buy a single-zone portable induction unit before the build, use it on the existing kitchen bench for a few weeks of normal cooking, and verify the household's existing cookware is induction-compatible. The investment is small, the adaptation curve compresses, and any genuine reservations surface in time to influence the cooktop selection rather than after handover.
For the broader kitchen specification picture, see building specification.
How all-electric specification works for hot water
Hot water is the appliance category where the all-electric specification typically delivers the largest efficiency gain. The choice in an all-electric home is between heat pump hot water, solar thermal hot water with electric backup, or conventional electric resistance. Gas instantaneous units, the dominant gas hot water choice, are not an option in Victorian new builds.
Heat pump hot water units extract heat from the outside air and use it to heat water in a storage tank. Modern units typically deliver three to five times more useful heat per kilowatt-hour of electricity input than conventional electric resistance, which translates directly into lower running costs. They produce some noise (broadly comparable to a domestic outdoor air conditioning unit) and need to be sited with that in mind, particularly where the unit is close to bedrooms or a neighbour's boundary. Performance is well established across most Australian climate zones, with a slight efficiency reduction in very cold conditions that affects cold-climate locations more than typical metropolitan sites.
Solar thermal hot water uses rooftop solar collectors to heat water directly, supplemented by electric backup for days with insufficient sunlight. In sunny climates and with good roof orientation, running costs are very low. The trade-offs are higher upfront cost than a heat pump, the need for periodic panel cleaning, and somewhat more constrained roof space planning because the collectors compete with PV panels for the best aspect.
Conventional electric resistance storage units are the legacy electric option. They work, they are cheap to buy, and they are noticeably more expensive to run than either heat pump or solar thermal in most circumstances. They generally only make sense where upfront budget is severely constrained or the household has very low hot water demand.
Sizing and siting matter more than the brochure spec. The unit should be sized for actual household demand (occupants, fixture count, peak use patterns) and located close enough to the main use points to minimise heat loss in the supply pipework. See plumbing layout in residential construction and what a plumber does in residential construction for the coordination considerations.
How all-electric specification works for heating and cooling
Climate control in an all-electric home almost always means reverse-cycle air conditioning, with hydronic heating as a premium alternative in colder regions. Resistance electric heating remains technically possible but is rarely sensible. Gas ducted heating and gas space heaters are not an option in Victorian new builds.
Reverse-cycle (RC) air conditioning uses the same heat pump principle as heat pump hot water, but applied to indoor air. The same unit provides both cooling in summer and heating in winter, which removes the need for a separate heating system. Variable-speed inverter compressors run very efficiently across a wide range of conditions, and modern units typically perform well down to roughly minus five degrees outside ambient. Energy efficiency ratings of five to seven stars are common for current models, and operating costs are generally lower than gas heating in most Australian climates.
The configuration choice is between single-split (one indoor unit serving one room), multi-split (one outdoor unit driving several indoor heads in different rooms), or ducted (a central unit serving the whole house through a duct network). Single-split is cheapest and most efficient per zone but limits which rooms are served. Multi-split adds flexibility at moderate cost. Ducted delivers whole-house comfort with the highest installation cost and slightly lower per-zone efficiency than direct splits.
Hydronic heating uses an electric heat pump to heat water that circulates through radiators or in-slab heating loops. Comfort is very high (radiant heat is widely regarded as more pleasant than forced air), upfront cost is significantly higher than RC ducted, and the technology is mature in Europe but still maturing in Australia. It tends to make sense in higher-end builds in cold-climate locations.
Climate-zone considerations are real. Tropical and subtropical climates (FNQ, NT, north WA) are cooling-dominated and RC is the obvious default. Warm temperate climates (most of QLD, NSW, SA, WA) suit RC well. Cool temperate climates (VIC, Tas, ACT) are well-served by RC in most conditions, with hydronic worth considering at the premium end. Alpine climates may need supplementary heating; specialist advice is worth obtaining. See air conditioning for new homes and common electrical mistakes in new builds.
Solar PV and battery storage in an all-electric home
Solar PV is highly recommended for all-electric homes because the economics improve substantially when a meaningful share of the household's electricity is self-generated. Rooftop solar produces electricity during daylight hours, the household consumes what it can in real time (self-consumption), and any excess is exported to the grid for a feed-in tariff that varies by retailer and state.
Sizing depends on household demand, roof orientation and climate. A typical all-electric Australian home is well served by a 6 to 10 kW system, with larger systems suited to homes with higher loads (pool heating, EV charging, larger floorplan). The federal Small-scale Renewable Energy Scheme reduces upfront cost through small-scale technology certificates (STCs), which are typically discounted at the point of sale by the installer.
Battery storage shifts solar use from the daytime generation window into the evening and overnight period when the household is using more energy. The federal Cheaper Home Batteries Program, launched on 1 July 2025, reduces battery cost through a rebate structured into the existing SRES framework. Verify current rebate amounts and eligibility at energy.gov.au or housingaustralia.gov.au before ordering hardware. Battery sizes for residential use typically run 10 to 20 kWh of usable capacity, with lithium-ion the dominant chemistry and lithium iron phosphate (LFP) increasingly common for its safety and cycle life characteristics.
The interaction between all-electric specification, solar and battery is what gives the combination its economic appeal. Heat pump hot water can be timed to absorb solar generation during the day, storing the heat in the tank for evening use. Reverse-cycle climate control during daytime occupancy runs largely from solar. Cooking spreads across day and evening but the absolute energy use is modest. EV charging adds a significant load that is well suited to time-shifting onto solar generation. The battery covers the evening peak when the household consumes most energy.
Without solar, an all-electric home still works but is economically less attractive because all the energy comes from the grid at retail tariffs. The dominant new-build pattern in Victoria post-gas-ban combines all-electric specification with rooftop solar, often with a battery, and increasingly with EV charging infrastructure. See solar panels for new homes and electrical layout planning for new homes.
EV charging is increasingly part of the same conversation. Even households without an EV today should reserve a circuit and a conduit run from the switchboard to a sensible garage or carport position during the build. Adding the circuit later requires trenching or surface conduit, and depending on switchboard capacity may also require service-side work. The cost during the build is negligible; the cost after the build is several thousand dollars. Households integrating solar, battery and EV charging with monitoring or scheduling controls should also see smart home builders in Australia for how this layer is coordinated during the build.
How NCC 2022 affects the all-electric decision
NCC 2022 introduced two changes to the energy provisions for new residential construction that interact with the all-electric question. The first is the seven-star NatHERS minimum for thermal performance, adopted by most states from May 2024 onward. The second is the Whole-of-Home energy budget methodology, which extends compliance from the building envelope to include the energy use of the major fixed appliances.
Seven-star NatHERS is fuel-agnostic; it focuses on the thermal performance of the building envelope (orientation, glazing, insulation, thermal mass) regardless of how the home is heated or cooled. The all-electric decision does not directly change the NatHERS rating, but the relationship between the two matters because efficient heating reduces the impact of any envelope shortfalls.
Whole-of-Home is where the all-electric question genuinely interacts with code compliance. The methodology calculates a notional annual energy budget for the home and assesses the major fixed loads (heating, cooling, hot water, lighting, on-site solar generation) against it. Heat pump hot water typically scores better than gas instantaneous in the Whole-of-Home calculation. Reverse-cycle heating and cooling typically scores better than gas heating combined with electric cooling. Induction cooking has lower assessed energy impact than gas in many calculations. The net result is that all-electric specification often makes Whole-of-Home compliance easier to achieve, particularly when paired with rooftop solar.
NCC 2022 does not mandate all-electric specification (except where state policy does, as in Victoria). What it does is shift the maths so that an efficient all-electric home is often the easier compliance path, and a mixed-fuel home with high gas appliance reliance can find Whole-of-Home compliance harder to demonstrate.
A point worth naming explicitly. Whole-of-Home compliance is assessed before the build, but the appliances modelled in the assessment have to match what is installed for the assessment to remain valid at occupancy. Substituting a less efficient appliance late in the build (a cheaper hot water unit, a smaller heat pump) can put the home back below compliance even though the original design met it. Holding the appliance specification through the build is part of how the all-electric advantage on Whole-of-Home is captured.
Verify with your design professional how NCC 2022 affects the specific build, including which version of the code applies in the relevant jurisdiction at the time the building approval is sought.
Cost comparison: all-electric vs mixed-fuel new build
An honest cost comparison requires separating upfront cost, operating cost and lifecycle cost, because the picture differs across each. The figures below are indicative ranges; actual costs vary by region, builder, specification and the household's energy consumption profile.
Upfront cost typically runs higher for all-electric than for mixed-fuel, before solar is factored in. Heat pump hot water costs more than gas instantaneous. RC ducted, where chosen, costs more than gas ducted. Induction cooktops sit at modest premium over basic gas cooktops, though high-end gas units narrow the gap. On the other side, all-electric homes save the cost of the gas connection itself, the internal gas reticulation, the gas meter, and the gas fitter labour. Net upfront premium for all-electric in 2026 typically falls in a $5,000 to $20,000 range, hedged broadly because the answer depends on what would otherwise have been specified for gas. Adding solar and battery moves the upfront figure higher but is partially offset by federal SRES and the Cheaper Home Batteries Program.
Operating cost typically runs lower for all-electric, particularly with solar. Without solar, the all-electric home runs at roughly comparable cost to a mixed-fuel home in most markets, with the variance driven by the local gas-to-electricity tariff differential and the household's hot water and heating load. With solar, the all-electric home runs significantly cheaper because a substantial share of energy use is drawn from self-generated electricity at near-zero marginal cost. With solar plus battery, more of that self-generated electricity is captured for evening use, widening the saving further.
Lifecycle cost is where the picture clearly tilts toward all-electric on a typical 25-year ownership horizon. Long-term gas price uncertainty is significant; long-term electricity price uncertainty is also real but is partly hedged by self-generation. The ongoing cost of maintaining a gas connection (supply charges, appliance servicing, certificate paperwork) drops out entirely. Payback periods for the all-electric premium typically fall in a 7 to 12 year range when solar and battery are included, hedged because the answer depends heavily on household consumption.
It is also worth naming the asymmetry in the policy risk. The probability of further restrictions on new gas connections in Australia over the next decade is meaningfully greater than the probability of restrictions on new electric appliances. A mixed-fuel home built today carries a small but real risk of becoming the locally non-standard option, with the resale and refit consequences that flow from that. An all-electric home built today is, on the same horizon, the default direction the policy environment is pointing.
A simpler way to summarise: do not expect a payback in year one, but on a typical home-ownership horizon the all-electric specification with solar generally wins. Get a project-specific cost comparison from your builder or broker rather than relying on a generic figure. See cost to build a house in Australia for the broader build-cost context.
Practical specification considerations
Several specification decisions repay early attention, and most of them are cheaper to address at design stage than to retrofit later.
Switchboard and electrical service
All-electric homes draw more from the electrical service than mixed-fuel homes. Switchboard sizing typically runs 50 to 100 amps for residential use. Single-phase is sufficient for most homes; three-phase may be required for larger floorplans, significant EV charging, or the combination of both. Future-proofing for additional loads (EV, pool heating, secondary dwelling) is worth specifying at the start. Bring the electrician into the design conversation early rather than treating it as a post-design exercise.
Appliance specification
Each major appliance has placement and service-access constraints worth confirming at design stage rather than at fit-off. Heat pump hot water units need outdoor space with reasonable clearance and a sensible run to the use points. Induction cooktops require ferrous-base cookware that the household either already owns or is willing to acquire. RC indoor units need ceiling or wall positions that suit the room layout. Solar PV needs unobstructed roof aspect, with northerly orientation preferred but east-west splits also viable. Battery storage has location requirements (typically garage or outdoor wall) and may have setback or fire-rating considerations depending on chemistry and jurisdiction.
Building envelope
All-electric specification is most economically attractive when paired with a strong building envelope. Insulation to higher than minimum code, double or triple glazing where climate justifies it, careful orientation for passive performance, and ceiling fans for low-energy cooling supplementation all reduce the heating and cooling load and improve the value of the all-electric specification. See insulation in Australia and double glazing in Australia.
Builder coordination
Confirm the builder understands all-electric specification and has experience with it. Verify the electrician is licensed for the required service capacity. Heat pump installers should be qualified for refrigerant work. Solar installers must be Clean Energy Regulator-accredited for STC eligibility, and battery installation often requires specialist endorsement. Common pushback (more expensive, heat pump is noisy, induction is unfamiliar, solar is not worth it) typically reflects unfamiliarity rather than substantive technical concern. See how to vet a builder, how to handle building disputes and building specification.
Federal and state schemes supporting electrification
A range of federal, state and local schemes support electrification and renewable energy in residential construction. Scheme details (eligibility, rebate amounts, application timing) change with budget cycles and policy review, so verify current details with the relevant authority before relying on specifics for a project.
Federal schemes
The Small-scale Renewable Energy Scheme (SRES) issues small-scale technology certificates that reduce the upfront cost of rooftop solar. The certificates are typically discounted at the point of sale by the installer rather than claimed by the homeowner directly. The Cheaper Home Batteries Program launched on 1 July 2025 and provides a federal rebate on residential battery installation, structured through the SRES framework. Verify current rebate amounts and eligibility at energy.gov.au or housingaustralia.gov.au.
State schemes
State-level support varies. Victoria operates several electrification rebates and solar/battery schemes through Solar Victoria. NSW offers solar and battery support through the Energy Savings Scheme and various targeted programs. The ACT has comprehensive electrification incentives reflecting its policy direction. South Australia has a long-running solar and battery support history. Other states offer varying combinations. Each scheme has its own eligibility criteria, accreditation requirements and application timing; verify with the relevant authority.
Local government and retailer schemes
Some local councils offer additional rebates for solar, battery or efficient appliances. Energy retailers offer varying feed-in tariffs and time-of-use tariffs that affect the operating cost of an all-electric home. Some retailers provide incentives for switching to electric appliances. The combination of scheme support and retailer offer is worth checking with both the council and the broker before final specification.
Interaction with construction loans
Most schemes require occupancy or installation completion before payment. Some require specific licensed installer accreditation (CER for solar, refrigerant licensing for heat pumps). Application timing affects which scheme version applies, and schemes are not always grandfathered if they change mid-build. See construction loans in Australia and first home owner grants for the related finance and incentive context.
A practical sequencing point. Confirm scheme eligibility in writing with the installer before any hardware is ordered. The most common cause of rebate denial is hardware that does not appear on the scheme's approved equipment list at the time of installation, or installer accreditation that has lapsed between quote and commissioning. Both are easy to verify ahead of time and expensive to discover after the fact.
Red flags when specifying or hiring for an all-electric build
All-electric specification involves more specialist trades than a mixed-fuel build (electrician, HVAC installer, solar installer, battery installer, heat pump installer), and that creates more places for things to slip. The list below covers the patterns that show up repeatedly on problem projects.
Warning signs
- Builder advising against all-electric without a specific technical reason. Some builders are simply unfamiliar with all-electric specification. "We don't do all-electric" is not a reason; it is a capacity gap. Push for a substantive answer or find a builder with relevant experience.
- Heat pump hot water sized incorrectly for household demand. Undersized units leave the household running out of hot water during peak demand. Oversized units add upfront cost without performance benefit. Sizing should reflect occupants, fixture count and use patterns, not a default.
- Switchboard capacity not assessed for the all-electric load profile. All-electric homes draw more from the electrical service than mixed-fuel homes. Switchboard size, mains tails and main switch rating should be confirmed at design stage, not discovered at fit-off.
- Solar PV sized without considering future battery integration. Retrofitting battery storage is more expensive than installing it alongside solar. Even if the battery is deferred, the solar inverter and DC infrastructure should be specified to allow later integration cleanly.
- EV charging not future-proofed in switchboard and conduit design. Adding an EV charging circuit to a finished home means trenching, switchboard work and possibly a service upgrade. A spare circuit and conduit run during the build cost almost nothing.
- Insulation and glazing specification not lifted for all-electric thermal performance. Heat pump heating is efficient but the running cost still scales with thermal envelope quality. Stripping insulation or glazing back to minimum compliance compromises the value of the all-electric specification.
- Solar installer not CER-accredited. Federal STC rebates and the Cheaper Home Batteries Program both require Clean Energy Regulator-accredited installers. An installer without current accreditation costs the household the rebate, often several thousand dollars.
- Heat pump installer not qualified for refrigerant work. Refrigerant handling requires specific licensing under the Ozone Protection and Synthetic Greenhouse Gas Management Act. Installers without it cannot legally commission the unit, and warranty cover may be void.
- Cheaper Home Batteries Program eligibility not verified before ordering hardware. Battery rebates are conditional on installer accreditation, hardware listing and program rules current at the time of installation. Ordering hardware before confirming eligibility in writing is the most common cause of rebate denial.
- Promised payback periods presented as guarantees. Payback varies significantly with household consumption, tariff structure, solar generation and the price of grid energy avoided. Anyone presenting a payback figure as a guarantee is overselling.
- All-electric specification offered without solar PV. All-electric without solar still works but is economically suboptimal in most Australian climates. If solar is being excluded, ask why; the reason should be specific (roof orientation, heritage constraint) rather than convenience.
- NCC 2022 Whole-of-Home compliance not addressed in design. The Whole-of-Home methodology in NCC 2022 affects what specification combinations meet compliance. Leaving this to be sorted late in design risks compliance failure or last-minute substitution.
For the broader pattern of trade selection and verification, see red flags when choosing a builder and what does an electrician do in residential construction.
BUILTLY and electrification verification
BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
For an all-electric build that means a builder profile carries verifiable credentials and a documented history of all-electric projects, trade profiles surface their relevant accreditation (CER for solar, refrigerant for HVAC, electrician licence class), and past projects show evidence of the work delivered together. For homeowners and developers, that turns trade selection from a phone-call-and-hope exercise into a record-led decision, which matters more on all-electric builds than most because the cost of getting any one trade wrong (rebate denial, compliance failure, performance shortfall) is concentrated and visible.
BUILTLY is heading toward a 2026 launch. Until then, the guide library, including the complete guide to building a house in Australia, is the active value: a careful reference for anyone navigating an all-electric build right now.
Frequently asked questions
Can I add gas later if I go all-electric now and change my mind?
Yes, but it is rarely cheap. Adding a gas connection after the home is built means engaging the network distributor for a new service, having a licensed gas fitter run reticulation through finished walls and floors, and either swapping appliances or adding gas-specific ones. The cost of retrofitting gas is typically several times the cost of including it from the start. The more useful question is whether the household genuinely needs gas. Most appliance functions modern households want (cooking, hot water, heating) are now well served by electric equivalents, and the policy direction in Victoria and the ACT is going the other way.
Is induction cooking really suitable for serious home cooking?
Most serious cooks who switch from gas to induction adapt within two to three weeks and prefer it afterward. Induction is faster to boil, more responsive than gas to power changes, and easier to clean. The genuine compromises are a slight learning curve on heat control, the need for induction-compatible cookware (most modern cookware works), and the fact that wok cooking is harder on a flat surface than over a gas flame. None of these are deal-breakers for typical Australian home cooking, and most professional kitchens in Australia now run mixed gas and induction setups.
What happens if there is a long power outage in an all-electric home?
An all-electric home without battery storage loses cooking, hot water, heating, cooling and lighting during a grid outage, the same as any home that loses power. With battery storage, essential loads can typically be covered for several hours to a day depending on battery size and configuration. With solar plus battery, daytime generation continues to charge the battery during the outage. For most metropolitan and suburban households the trade-off is minor (outages are infrequent and short) but in regional areas with longer outage history, battery sizing and solar inclusion become more important.
Does my insurance cover the heat pump and solar in an all-electric home?
Standard home and contents insurance typically covers solar PV, battery storage and heat pump units as fixed building elements, the same way it covers a hot water unit or air conditioner. Premiums may reflect the higher replacement value of these systems. Specific exclusions (storm damage to solar panels, water ingress on battery enclosures) vary by insurer and should be confirmed at policy inception. Keep installation documentation, warranty paperwork and electrical compliance certificates with the home file, as insurers will typically request them when assessing a claim involving these systems.
Can I get a construction loan for an all-electric build with solar and battery?
Yes. Mainstream construction loans are tenure-agnostic about appliance and energy specification, so a fixed-price contract for an all-electric build with solar and battery is treated the same as any other build of the same value. Some lenders offer green loan products with discounted rates for builds meeting specific energy efficiency criteria, which an all-electric home with solar and a high NatHERS rating typically qualifies for. Verify current green loan availability with your broker before contract signing, as eligibility criteria evolve and the rate differential is worth capturing where available.
Will the Cheaper Home Batteries Program still be available when my home is built?
The federal Cheaper Home Batteries Program launched on 1 July 2025 and is structured through the existing Small-scale Renewable Energy Scheme framework. Like all federal energy schemes, it is subject to budget cycles and policy review, so eligibility, rebate amounts and program rules can change. The practical move is to verify current program details at energy.gov.au or housingaustralia.gov.au close to the time of installation, and to have your installer confirm program eligibility in writing before ordering hardware. Hardware ordered without verifying current eligibility is the most common cause of rebate denial.