A licensed electrician's role in residential construction is broader and more consequential than most homeowners realise. The electrician is not just the person who installs power points and light fittings before handover - they design and install the complete electrical infrastructure of the building, including the switchboard, all circuit protection, the mains connection, all cabling and conduit and every mains-connected device. The electrical rough-in - the stage most homeowners never see - determines the quantity and position of power points, data points, light fittings and smart home infrastructure for the life of the building. Understanding what the electrician does at each stage and what to check before each stage proceeds is essential knowledge for any homeowner building in Australia.

Key takeaways

  • The electrical rough-in during the frame stage determines all power point, data and smart home infrastructure positions for the life of the building.
  • Adding a power point after linings costs $200 to $500 - during the rough-in it costs $50 to $100.
  • EV charger conduit and smart home conduit must be installed during the rough-in - retrofitting is significantly more expensive.
  • All RCDs must be tested at handover - they are the primary protection against electrocution.
  • An electrical compliance certificate must be issued and provided at handover - do not accept the keys without it.

What is a licensed electrician?

A licensed electrician in Australia is a tradesperson who holds a current electrical licence - issued by the state electrical safety regulator - that authorises them to perform regulated electrical work. Regulated electrical work includes all work that connects to or modifies the mains electrical supply - the switchboard, circuit protection, fixed cabling, power points, light fittings, fixed appliance connections and any device that interfaces with mains voltage.

Licensed electricians in residential construction typically work in two phases - the rough-in during the frame stage and the fit-off during the fixing stage. Some electricians also perform the switchboard installation and mains connection as a separate phase. All regulated electrical work requires a compliance certificate issued by the licensed electrician on completion.

Electrical scope by construction stage

Construction stageElectrical work performedWhat is installedKey decisions required before this stage
Pre-slabUnderground conduit where specifiedConduit from switchboard location to garage for EV charger circuit - or other specified underground electrical routesEV charger location confirmed - underground routes planned
Frame stage - rough-inComplete electrical rough-inAll cables pulled to all locations - power points, lights, data, smart home conduit - switchboard rough-inPower point positions, quantities and heights confirmed - smart home scope confirmed - data point locations confirmed
Lock-up stageExternal electrical connectionsExternal light fittings rough-in, garden lighting conduit where installed during constructionGarden lighting locations confirmed - external light positions confirmed
Fixing stage - partialAfter plastering - before final paintingPower point and switch boxes prepared for plasterboard cutting - cable ends confirmed accessibleNo additional decisions at this stage
Fit-off stageComplete electrical fit-offPower point and switch plates installed, light fittings installed, switchboard completed, fixed appliances connected - oven, cooktop, air conditioning, hot water if electricAll appliance selections confirmed - switchboard design finalised
CommissioningTesting and switchboard labellingAll circuits tested and labelled, RCDs tested, switchboard circuit schedule producedBuilder provides complete list of circuits for labelling
Final - pre-handoverFinal checks and certificateElectrical compliance certificate issued - all circuits confirmed operationalAll power points and light fittings installed

The electrical rough-in - why it determines everything

The electrical rough-in - performed during the frame stage before wall linings are installed - is the most consequential phase of the electrician's work and the phase that most directly affects the homeowner's daily experience of the completed building.

Why it cannot be changed after linings

Every power point, data point, light fitting location and smart home conduit run is determined during the rough-in stage - before the walls are closed. Adding a power point after linings are installed requires cutting into the wall surface, pulling a new cable from the nearest distribution point, installing a new box and repairing the wall finish. The cost is typically $200 to $500 per power point added after linings - compared to approximately $50 to $100 per power point added during the rough-in. Adding 10 power points after handover costs $2,000 to $5,000. Adding the same 10 during the rough-in costs $500 to $1,000.

What must be confirmed before the rough-in

The homeowner must confirm the following before the electrical rough-in commences - these decisions cannot be meaningfully changed after linings are installed:

  • Number and position of all power points in every room - including behind where furniture will be placed, at benchtop level in the kitchen, above and below kitchen and bathroom joinery, in external areas and in the garage
  • Number and position of all data points - network outlets, TV antenna points
  • Smart home conduit runs - where conduit should be installed in walls and ceiling cavities for future smart home cabling
  • Garden lighting conduit - conduit pulled from the switchboard to garden areas during construction is significantly cheaper than retrospective installation
  • EV charger circuit - conduit from switchboard to garage installed during rough-in

The switchboard - the heart of the electrical system

The residential switchboard is installed and completed by the licensed electrician - typically during the fit-off stage for the circuit protection components, though the switchboard enclosure is typically positioned during the rough-in.

What a compliant residential switchboard contains

Under AS/NZS 3000 - the Australian Wiring Rules - a residential switchboard must include a main switch, circuit breakers for every circuit of the appropriate rating for the cables they protect, residual current devices - RCDs - protecting all power point and lighting circuits, and a circuit schedule - a labelled directory identifying which breaker controls which circuit. Surge protection is not mandatory but is strongly recommended.

Switchboard sizing

A switchboard must have sufficient spaces for all current circuits plus any reasonable future additions - solar inverter, battery storage, EV charger, additional circuits. A switchboard that is full at completion with no spare spaces has no capacity for future electrical additions without a switchboard upgrade.

RCDs - the most important safety device

RCDs - residual current devices - are safety switches that detect current leaking to earth and disconnect the circuit within milliseconds. They are the primary protection against electrocution in the home. Under AS/NZS 3000 all power point circuits and lighting circuits in new residential buildings must be protected by an RCD. Confirm that every RCD is tested at handover - press the test button on each and confirm it trips and resets correctly.

Electrical compliance requirements

Work typeCompliance certificate requiredWhen issuedState name for certificate
All electrical work - rough-in and fit-off combinedYes - electrical compliance certificateAfter all electrical work is complete at fit-offQLD: Certificate of Testing and Compliance - NSW: Certificate of Compliance Electrical Work - VIC: Certificate of Electrical Safety
Solar PV installationYes - separate solar compliance certificateAfter solar system commissioningCombined with or separate from general electrical certificate depending on state
Battery storage systemYes - included with solar certificate or separateAfter battery system commissioningDepends on state
EV charger installationYes - included in electrical compliance certificateAt fit-off completionDedicated circuit - included in general certificate
Smart home mains-voltage connectionsYes - included in electrical compliance certificateAt fit-off completionAll mains-connected smart home devices included

What to check at each electrical stage

Before rough-in commences - confirm all power point positions, quantities and heights are finalised and documented

Before rough-in commences - confirm all data point locations are finalised - Cat 6A minimum specification confirmed

Before rough-in commences - confirm smart home conduit runs are planned and communicated to the electrician

Before rough-in commences - confirm EV charger conduit is in the scope - run from switchboard to garage during rough-in

During frame stage - visit site and confirm power point boxes are in the correct positions and at the correct heights before linings are installed

During frame stage - confirm all data cabling has been pulled to all specified locations

Before frame payment is released - confirm frame inspection has been conducted and all rough-in is accessible and inspected

Before lining commences - confirm all data cabling has been tested - dead data points after linings are expensive

At fit-off - test every power point with a power point tester

At fit-off - test every RCD - press test button on each and confirm it trips and resets

At fit-off - walk every circuit breaker in the switchboard and confirm labelling is accurate

At handover - confirm electrical compliance certificate has been received

Red flags

Electrician cannot confirm current licence number before commencing work

Power point specification was not confirmed before the rough-in - homeowner discovers insufficient power points after linings are installed

Smart home conduit was not installed during the rough-in - all smart home cabling must now be surface-mounted or retrofitted through completed walls

EV charger conduit was not installed during the rough-in - retrospective installation requires trenching or surface-mounted conduit

Data cabling was not tested before linings were installed - dead data points discovered after handover

Switchboard labels are missing or generic - homeowner cannot identify which breaker controls which circuit

RCDs have not been tested at handover - confirm each one trips correctly before accepting the keys

Electrical compliance certificate is not provided at handover - or builder suggests it will follow after

BUILTLY and lasting project records

BUILTLY is building a record of completed Australian homes that credits the builder and specialist trades behind each one.

BUILTLY is building a record of completed Australian homes that credits the builder and specialist trades behind each one.

Frequently Asked Questions

What does an electrician do in a residential construction project in Australia?

A licensed electrician performs two main phases of work in residential construction. During the frame stage rough-in, the electrician pulls all cables to every specified location - power points, lights, data points, fixed appliance connections - and installs conduit for smart home and future use. During the fit-off stage, the electrician installs all power point and switch plates, light fittings, completes the switchboard, connects all fixed appliances and commissions the system. An electrical compliance certificate is issued on completion confirming all work is compliant.

What decisions must I make before the electrical rough-in in a new home?

Before the electrical rough-in commences, confirm the number and position of all power points in every room, the position and specification of all data points - Cat 6A minimum - the smart home conduit runs required, whether EV charger conduit should be run from the switchboard to the garage and the garden lighting conduit routes. These decisions cannot be meaningfully changed after linings are installed without cutting into completed walls at significant cost. Adding a power point after linings costs $200 to $500. Adding it during the rough-in costs $50 to $100.

What should be in a residential switchboard in Australia?

A compliant residential switchboard under AS/NZS 3000 must include a main switch, circuit breakers of the correct rating for every circuit, residual current devices - RCDs - protecting all power point and lighting circuits, and a labelled circuit schedule identifying which breaker controls which circuit. Surge protection is strongly recommended though not universally mandatory. The switchboard should have spare spaces for future circuits - solar, battery, EV charger, additional circuits. A switchboard that is full at completion has no capacity for future additions without a switchboard upgrade.

What is a residual current device and why does it matter?

A residual current device - RCD - is a safety switch that detects current leaking to earth and disconnects the circuit within milliseconds - fast enough to prevent electrocution. Under AS/NZS 3000 all power point and lighting circuits in new residential buildings must be protected by an RCD. At handover, test every RCD by pressing the test button - confirm it trips and resets correctly. An RCD that is installed but does not trip correctly provides no protection. Confirm RCD testing is part of the electrician's commissioning process and that the results are documented in the compliance certificate.

What documents should I receive from the electrician at handover?

At handover you should receive the electrical compliance certificate confirming all electrical work is compliant and certified. In Queensland this is called the Certificate of Testing and Compliance, in NSW the Certificate of Compliance Electrical Work and in Victoria the Certificate of Electrical Safety. If solar PV has been installed, a separate solar compliance certificate should also be provided. The switchboard circuit schedule - the labelled directory showing which breaker controls which circuit - should be physically attached to the inside of the switchboard door and a copy included in the handover documentation.