New-home energy requirements depend on jurisdiction, approval date and compliance pathway. Where the housing energy uplift applies, it generally requires seven-star-equivalent thermal performance plus the applicable whole-of-home outcome.
NatHERS is also not just a compliance hurdle. A home designed to genuinely perform well on the NatHERS scale - not just to scrape past the minimum requirement - is a more comfortable, more energy-efficient and more cost-effective home to live in. The difference between a home designed to achieve exactly 7 stars and one designed to achieve 8 or 9 stars is not marginal - it is the difference between a home that requires significant mechanical heating and cooling to maintain comfortable temperatures and one that manages thermal comfort largely through passive design.
BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
What Is NatHERS?
NatHERS - the Nationwide House Energy Rating Scheme - is Australia's national framework for assessing the thermal performance and energy efficiency of residential buildings. It rates homes on a scale of zero to ten stars - where zero represents a building with no insulation or thermal performance whatsoever and ten stars represents a building that requires almost no artificial heating or cooling to maintain comfortable internal temperatures year-round.
The NatHERS rating specifically measures the predicted annual energy load required to heat and cool a home to maintain comfortable temperatures - expressed in megajoules per square metre of conditioned floor area per year. A higher star rating means a lower predicted energy load - and therefore lower running costs and lower carbon emissions.
What NatHERS Measures
NatHERS measures thermal performance - specifically the heating and cooling energy load. It does not directly measure:
- The energy efficiency of appliances or hot water systems - these are covered by separate requirements under the NCC
- The energy generated by solar panels or other on-site generation - though this affects the overall energy balance of the home
- Water efficiency
- Indoor air quality
- Embodied carbon in the construction materials
Understanding what NatHERS does and does not measure is important because a home can achieve 7 stars while still being a heavy energy consumer if it relies on inefficient appliances - and conversely a home that performs exceptionally well thermally may have a relatively modest NatHERS rating if the climate zone makes thermal performance inherently difficult to achieve.
The Star Rating Scale
| Stars | Performance Description |
|---|---|
| 0 to 2 stars | Very poor - extremely high heating and cooling loads |
| 3 to 4 stars | Below average - significant heating and cooling required |
| 5 stars | Moderate thermal performance |
| 6 stars | Above average - reasonably comfortable with moderate energy use |
| 7 stars | Good thermal performance; a compliance benchmark where the housing energy uplift applies |
| 8 stars | Very good - high comfort with low energy loads |
| 9 stars | Excellent - near-passive performance |
| 10 stars | Outstanding - effectively passive, near-zero heating and cooling load |
Most new Australian homes built to meet the minimum 7-star requirement perform noticeably better than the pre-2024 6-star minimum. However there is a substantial performance gap between a home designed to achieve exactly 7 stars and one designed to achieve 8 or 9 stars - and the additional cost to achieve 8 or 9 stars is often surprisingly modest when the design is optimised from the outset.
How NatHERS Works - The Assessment Process
Accredited NatHERS Assessors
NatHERS ratings must be carried out by an accredited NatHERS assessor - a trained professional who uses approved software to model the thermal performance of a proposed building. The assessor is not a building inspector or an energy auditor - they are a thermal performance specialist who analyses the design before construction commences and predicts its energy performance using simulation software.
Accredited NatHERS assessors can be found through the NatHERS website at www.nathers.gov.au.
The Two Approved Software Tools
NatHERS assessments in Australia use one of two approved simulation software tools:
AccuRate Sustainability - the most widely used tool, developed by the CSIRO. Models the complete thermal performance of a building including all construction elements, glazing, shading, orientation and ventilation.
FirstRate5 - widely used in Victoria and some other states. Developed by the Victorian Building Authority and licensed for use across Australia.
Both tools use the same underlying NatHERS climate data - there are 69 climate zones across Australia - and produce equivalent results for a given building in a given location.
What the Assessor Models
To produce a NatHERS rating the assessor models every element of the building that affects its thermal performance:
Building Geometry
Floor area, ceiling heights, room layout, storey count and the orientation of every facade - which walls face north, south, east and west.
Fabric Construction
Wall construction - framing type, insulation R-value, cladding type and internal lining. For specification guidance, see climate-zone insulation requirements. Roof and ceiling construction - insulation R-value, roof colour and pitch. Floor construction - slab-on-ground, suspended timber, suspended concrete - and any underfloor insulation.
Glazing
Every window and glass door - size, position, orientation, glass specification including U-value and solar heat gain coefficient, and any external shading - overhangs, screens, louvres or external blinds.
Infiltration
The estimated rate of air leakage through the building envelope - affected by construction quality, sealing of gaps around windows and doors and penetrations through the building fabric.
Ventilation
Provision for natural ventilation - ceiling fans, operable windows, cross-ventilation pathways.
Climate Zone
The specific NatHERS climate zone for the building's location - one of 69 zones covering all of Australia. Each zone has specific heating, cooling, humidity and solar radiation data that drives the thermal modelling.
The Output - The NatHERS Certificate
When using the NatHERS compliance pathway, supply the certificate with the approval documentation as required. Other compliance pathways can use different evidence.
The 7-Star Requirement - What It Means in Practice
The National Construction Code 2022 Changes
The NCC 2022 housing energy uplift introduced two significant changes. Its commencement is separate from general NCC adoption:
Where the housing energy uplift applies, the thermal requirement is generally seven-star-equivalent, using an applicable assessment pathway.
Where applicable, the whole-of-home outcome separately addresses fixed services including heating, cooling, hot water, pool and spa pumps and lighting.
State Implementation - Timing Varies
While the NCC 2022 established the 7-star requirement the timing of its adoption varies by state:
- ACT15 January 2024
- NSW1 October 2023 through applicable BASIX requirements
- Queensland1 May 2024
- Victoria1 May 2024
- Western Australia1 May 2025
- South Australia1 October 2024
- TasmaniaDid not adopt this NCC 2022 housing energy uplift
- Northern TerritoryDo not assume the national seven-star housing uplift applies
Always confirm the current NCC adoption status with the relevant state or territory building authority before assuming which energy efficiency requirements apply to your project.
The Elemental Provisions Pathway
In addition to the NatHERS pathway - where the complete building is modelled and must achieve 7 stars - the NCC provides an elemental provisions pathway that allows compliance without a full NatHERS assessment. The elemental pathway specifies minimum performance requirements for each building element - insulation R-values, glazing specifications, shading requirements - that together are deemed to produce equivalent performance.
For custom and architecturally designed homes the NatHERS pathway is almost always preferred - because the software modelling allows the design to be optimised for the specific site and orientation, potentially achieving compliance with less restrictive requirements on some elements by compensating with better performance on others.
The elemental pathway is more commonly used for volume-produced project homes where the cost of individual NatHERS assessments for each variant is prohibitive.
What Affects Your NatHERS Rating Most
Understanding what drives the NatHERS rating - and what design decisions have the greatest impact - is essential for achieving good thermal performance efficiently. Not all design decisions are equally important.
Orientation - The Highest Impact Decision
Highest Impact Factor
Orientation is the single most powerful determinant of thermal performance and NatHERS rating. A home designed with optimal orientation can achieve a significantly higher rating than the same home rotated 90 degrees - with no additional construction cost.
Optimal orientation principles for Australian homes:
- North-facing living areas capture winter sun for passive solar heating while allowing the summer sun - which is higher in the sky - to be shaded by appropriate roof overhangs. This is the foundation of passive solar design and the most important orientation decision.
- Minimising east and west glazing reduces unwanted solar heat gain in summer - the low morning and afternoon sun angles make east and west facades very difficult to shade effectively.
- Avoiding south-facing glass in colder climates minimises heat loss through south-facing glazing which receives very little direct sun in Australian latitudes.
For more detail on passive solar design and orientation refer to the BUILTLY guide on Building a Passive House in Australia: Costs, Design and Complete Guide.
Insulation - R-Values Matter Enormously
Insulation is the most cost-effective single investment in thermal performance improvement. The most important insulation locations:
- Ceiling insulation is typically the most cost-effective investment - heat rises and the roof is the largest area of heat exchange. R-values of R4.0 to R6.0 are appropriate for most climate zones.
- Wall insulation significantly reduces heat loss in winter and heat gain in summer. Bulk insulation batts between wall studs and reflective foil sarking all contribute.
- Underfloor insulation for homes with suspended floors - particularly in cooler climates - reduces heat loss through the floor in winter.
- Slab edge insulation for homes on concrete slabs - the edge of the slab is a significant thermal bridge in cooler climates.
Glazing - The Most Complex Trade-Off
Glazing is the most complex element of the NatHERS assessment - because glass has competing performance requirements. Key glazing parameters:
- U-value - the rate of heat transfer through the glass - lower is better. Standard single glazing: ~5.8. Standard double glazing: ~2.8. High-performance double glazing with low-e coating: 1.2 to 2.0. Triple glazing: below 1.0.
- Solar heat gain coefficient (SHGC) - the proportion of solar radiation that passes through as heat. Higher SHGC desirable for north-facing glazing in cooler climates. Lower SHGC desirable for east and west-facing glazing.
Shading: External shading - roof overhangs, louvres, pergolas, external blinds and vegetation - can compensate for suboptimal glazing specifications. The NatHERS software models external shading precisely.
Airtightness and Infiltration
Air leakage - uncontrolled infiltration of outside air through gaps in the building envelope - is a significant source of thermal performance loss. Improving airtightness through careful sealing of penetrations, quality window and door installation and draught sealing improves actual thermal performance relative to the modelled rating.
Thermal Mass
Thermal mass - the ability of dense materials to absorb and slowly release heat - can significantly improve thermal comfort when used appropriately. In climates with significant diurnal temperature variation thermal mass can make a meaningful contribution. However thermal mass only works beneficially when combined with appropriate glazing, shading and insulation.
How to Improve a NatHERS Rating
If an initial NatHERS assessment returns a rating below the target there is a clear hierarchy of interventions, roughly in order of cost-effectiveness.
Step 1 - Optimise Orientation First
If the design has not yet been finalised - or if there is still flexibility in the siting of the building on the lot - review the orientation. Even modest orientation improvements can have a larger impact than expensive construction upgrades.
Step 2 - Increase Ceiling Insulation
Increasing ceiling insulation R-values from R3.5 to R5.0 or R6.0 is typically the most cost-effective single improvement. Additional material cost is typically $2,000 to $6,000 for a standard home.
Step 3 - Upgrade Wall Insulation
Adding or upgrading wall insulation - either through higher-R bulk insulation batts, insulated cladding systems or external insulation - is the next most cost-effective intervention.
Step 4 - Review Glazing Specification and Shading
Work with the assessor to identify which windows contribute most to the thermal performance deficit. Upgrading from single to double glazing on the highest-impact windows or adding external shading can meaningfully improve the rating.
Step 5 - Reduce Glazing Area on Poor-Performing Facades
If glazing upgrades are not cost-effective, reducing the area of glazing on east and west-facing facades - without compromising the design intent - can improve the rating by reducing unwanted solar heat gain.
Step 6 - Consider Construction System Upgrades
For homes struggling to achieve the target despite the above, more significant construction system upgrades may be required - insulated wall panels, structural insulated panels, double-stud wall construction or high-performance window systems.
NatHERS in Different Australian Climate Zones
Australia has 69 NatHERS climate zones - ranging from the tropical north where cooling dominates to the alpine south where heating dominates. Design strategies vary significantly by climate zone.
Tropical and Subtropical Climates - Zones 1 and 2
In tropical and subtropical climates - including Darwin, Cairns, Townsville and the tropical northern parts of Queensland - the primary thermal challenge is cooling. Design priorities are:
- Minimising solar heat gain through all facades - particularly roofs
- Maximising natural ventilation - ceiling fans, cross ventilation, louvred walls
- Minimising thermal mass - which retains heat in a cooling-dominant climate
- High-performance insulation to keep the heat out
- Shading all glazing - particularly east and west
The Gold Coast and Brisbane sit in climate zones 2 and 5 - subtropical climates with both heating and cooling loads but with cooling dominance in summer and mild winters. For more detail on building in coastal regions refer to the BUILTLY guide on Building a Beach House in Australia: Design, Costs and What to Expect.
Temperate Climates - Zones 5 and 6
In temperate climates - including Sydney, Canberra and coastal Victoria - both heating and cooling are significant. Design priorities balance winter solar access with summer shading. Double glazing with appropriate U-values and SHGC for each orientation is typically required to achieve 7 stars.
Cold Climates - Zones 7 and 8
In cold climates - including alpine areas, Canberra, inland Victoria and Tasmania - heating loads dominate and high-performance insulation, double or triple glazing and airtightness are the primary performance drivers. NatHERS ratings in cold climates are inherently more challenging to achieve than in temperate or subtropical climates.
NatHERS and Your Builder
The NatHERS requirement has significant implications for how you engage with your builder and architect - because the NatHERS rating is set by the design, not the construction. A builder cannot improve a NatHERS rating after the design is finalised.
When to Engage a NatHERS Assessor
The NatHERS assessor should be engaged during the design development stage - before construction documentation is complete. The ideal engagement sequence:
- Architect develops concept design
- NatHERS assessor models the concept design and identifies the rating and key improvement opportunities
- Architect refines the design in response to the assessor's input
- Assessor models the refined design and confirms the improved rating
- Design is finalised with the NatHERS certificate as a confirmed output
This iterative process costs no more than a single late-stage assessment and produces a significantly better outcome. For more detail on briefing an architect refer to the BUILTLY guide on How to Brief an Architect in Australia: A Complete Guide.
What to Ask Your Builder
When engaging a builder for a new home under the 7-star requirement confirm:
- Whether the builder has a preferred NatHERS assessor they work with - and whether that assessor is engaged early in the design process
- Whether the builder's standard specification meets or exceeds the NatHERS requirements
- Whether the NatHERS certificate is included in the building permit documentation the builder manages
- Whether the construction details specified in the NatHERS certificate will be verified during construction
For more detail on engaging a builder refer to the BUILTLY guide on How to Vet a Builder in Australia: A Complete Due Diligence Checklist. For guidance on choosing an architect refer to How to Choose a Residential Architect in Australia.
NatHERS and BUILTLY
BUILTLY is building a record of completed Australian homes that credits the builder, architects, designers and trades behind each one.
BUILTLY is building a record of completed Australian homes that credits the builder, architects, designers and trades behind each one.
BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
Frequently asked questions
What is the minimum NatHERS star rating required for new homes in Australia?
New-home energy requirements depend on jurisdiction, approval date and compliance pathway. Where the housing energy uplift applies, it generally requires seven-star-equivalent thermal performance plus the applicable whole-of-home outcome.
How much does a NatHERS assessment cost in Australia?
A NatHERS assessment for a new residential home typically costs $500 to $1,500 depending on the complexity of the design, the number of revisions required and the assessor's fee structure. Some assessors charge a flat fee for a single assessment with additional fees for revisions - others offer a package that includes multiple iterations. For a new home project the NatHERS assessment cost is a very small component of the total project cost and is typically absorbed within the architect's or builder's scope of services or charged separately as a disbursement.
What is the difference between NatHERS and BASIX in NSW?
NatHERS is the national energy rating scheme that measures the thermal performance of a residential building - specifically the predicted heating and cooling energy load. It applies across Australia. BASIX - the Building Sustainability Index - is a NSW-specific scheme that assesses a broader range of sustainability measures including water efficiency, thermal comfort and energy use. In NSW new homes must comply with both BASIX and the NatHERS thermal performance requirements - the BASIX certificate and the NatHERS certificate are separate documents both required for building permit lodgement.
Can I improve the NatHERS rating of an existing home?
NatHERS supports new-home compliance assessments, while assessments for existing homes are being introduced in stages.
Does a higher NatHERS rating mean lower electricity bills?
A higher NatHERS rating means lower predicted heating and cooling energy loads - which translates directly to lower energy costs for heating and cooling. The relationship between NatHERS rating and total electricity bills is not one-to-one because NatHERS does not account for all energy uses - appliance efficiency, hot water system performance, lighting and occupant behaviour all affect the total electricity bill. However a well-designed 8 or 9-star home will typically require significantly less energy for heating and cooling than a 7-star minimum compliance home - potentially saving $500 to $2,000 per year in energy costs depending on the climate zone.