Smart Homes in Australia: What to Know Before You Build

Last updated: October 2026

Australia's smart home market is growing rapidly - valued at over $4 billion in 2025 and projected to reach $11 billion by 2034. Smart home technology is increasingly expected as standard in new residential construction, not as a premium upgrade. But the single most important thing to understand before building a smart home in Australia is this: the technology you install is temporary. The infrastructure you build into the walls is permanent. Getting the infrastructure right during construction - conduit, data points, neutral wires, switchboard capacity, communications cabinet location - is cheap. Retrofitting it after the walls are lined is expensive, disruptive and in some cases impossible. This guide covers what you need to know before you build. For the pre-contract evaluation companion, see what to ask a builder about smart home integration. For a complete construction overview, see the complete guide to building a house in Australia; smart home scope should be locked into the builder preliminary agreement and verified at practical completion.

What is a smart home?

A smart home is a residential dwelling where lighting, climate control, security, access, audio-visual systems, energy management and appliances are connected through a digital network and can be monitored, automated and controlled remotely or through automated schedules.

In a construction context, a smart home is not primarily about which devices are installed - devices change, improve and become obsolete on a cycle of 3 to 7 years. A smart home is primarily about the physical infrastructure built into the home during construction that enables current and future devices to function reliably and to be upgraded without opening walls.

The Australian smart home market has three structural features worth naming. First, the NBN is the single most consequential network dependency in the home, and where the NBN connection lands physically determines where the rest of the network has to live. Second, climate control is unusually prominent compared with overseas smart homes because of the Australian summer load and the cost of running ducted systems inefficiently. Third, the Matter standard has matured enough that brand lock-in is no longer the planning concern it was two years ago - the planning concern is network infrastructure and documentation, both of which Matter takes for granted rather than provides.

The infrastructure that matters most:

  • Conduit - empty plastic pipe runs through walls, ceilings and floors allowing cables to be pulled through or replaced without opening wall cavities
  • Data points - Cat6 or Cat6A ethernet outlets at key locations throughout the home
  • Neutral wires - a neutral wire run to every light switch position enabling smart switch installation
  • Switchboard capacity - sufficient circuit breaker slots and load capacity for current and future electrical loads including EV charging, battery storage and home automation systems
  • Communications cabinet - a centralised location for the NBN connection box, router, network switch, patch panel and home automation hub
  • Conduit from NBN entry point - a dedicated conduit run from where NBN enters the home to the communications cabinet location

Infrastructure first - why the build stage is the only opportunity

The single principle that determines whether a new build will be genuinely smart-home capable for the next 20 years is this: infrastructure planned and installed during construction costs a fraction of what it costs to add later.

Opening a lined wall to run a cable costs $300 to $1,500 per cable run depending on difficulty. Running the same cable during construction when the walls are open costs $30 to $80. The economics are stark and irreversible.

Every decision about where to run conduit, where to locate data points and whether to spec neutral wires to every switch is made during the design and rough-in phase - typically 4 to 6 months before handover. Once the walls are lined and painted, the window closes. Understanding the stage inspections during construction helps ensure nothing is missed before lining.

This is why smart home capability is fundamentally a construction decision, not a post-completion device decision. A home built with extensive conduit, Cat6A data points in every room, neutral wires at every switch position and a properly specified switchboard can accommodate smart home systems for decades, regardless of which devices or platforms are available when it is built. A home built without this infrastructure will face expensive retrofitting for every future upgrade.

The retrofit multiplier matters more than any single line item. Across the consistently retrofitted infrastructure elements - conduit, data points, neutral wires, switchboard capacity, communications cabinet - the post-completion cost typically runs three to ten times the during-construction cost. A 30-switch home that misses neutrals at rough-in carries a $4,500 to $15,000 rectification bill against a $450 to $1,200 specification cost; a home that misses conduit between floors loses the ability to add cabling at all in many configurations.

The window inside the window matters too. The conduit decision closes at framing - typically 2 to 3 months before handover. The neutral-wire decision closes at electrical rough-in - usually 4 to 6 weeks after framing. The communications cabinet decision closes when the joiner cuts the cupboard. The switchboard decision closes at meter installation. Each sub-decision has its own narrow window inside the broader build, and missing any one of them forecloses options downstream. This is why the right time to specify smart home infrastructure is at builder preliminary agreement stage - not at the first site visit after slab pour.

The infrastructure that matters - what to specify

Conduit

Conduit is the single most important smart home infrastructure element to specify. It is also the cheapest during construction and the most expensive to add afterwards.

Empty conduit runs - typically 20mm or 25mm flexible or rigid PVC pipe - are installed through wall cavities, ceilings and floor spaces during framing and before lining. They allow cables to be pulled through or replaced at any point in the life of the home without cutting into walls.

Conduit sizing matters more than is usually appreciated. A 20mm conduit takes one or two Cat6A runs comfortably; a 25mm conduit takes three or four; a 32mm conduit takes a bundle and still leaves a pull-string for the next cable. For any run that may ever carry more than one cable - typically anything going to a TV position, a security camera location or a multi-room AV outlet - 25mm should be the floor. The marginal cost over 20mm is trivial during construction and significant after.

Specify conduit runs to:

  • All external wall locations where future security cameras, sensors or outdoor speakers may be installed
  • The communications cabinet location from the NBN entry point
  • Between each level of a multi-storey home for future cable runs
  • The garage for future EV charging cabling
  • The roof space from the switchboard area for future solar and battery cabling
  • Any location where future cable runs are uncertain - conduit is cheap insurance

Data points - ethernet cabling

Wi-Fi is convenient but ethernet is reliable. Wireless networks are subject to interference, congestion and physical obstructions. Devices that require consistent, low-latency connectivity - network switches, Wi-Fi access points, smart televisions, security cameras and video conferencing equipment - perform significantly better on hardwired ethernet connections.

Structured cabling is the formal name for the discipline that turns ad-hoc data point installation into a managed network. The standard is straightforward: every data point in the home runs as a home-run cable back to the patch panel in the communications cabinet, terminated at both ends to recognised pin-out, tested with a certification meter and documented in a port-assignment register. A home where every data point is documented to a port and tested is a home where any future device can be moved, replaced or repurposed without guesswork. A home where data points were "thrown in" without structured cabling discipline is a home where the next IT engineer starts every job by tracing cables.

Specify Cat6 or Cat6A ethernet outlets to:

  • A minimum of two data points per main living area and bedroom
  • Every television location
  • Every security camera location
  • Every Wi-Fi access point location - typically one per 60 to 80 square metres of floor area
  • The communications cabinet
  • The home office or dedicated workspace

Cat6A is the recommended specification for new builds. It supports 10 Gigabit ethernet speeds at up to 100 metres and is backward compatible with all current Cat6 and Cat5e devices. The cost difference between Cat6 and Cat6A during construction is minimal.

Wi-Fi access point density follows the structured cabling. The working planning rule is one ceiling-mounted access point per 60 to 80 square metres of floor area on a single level, with additional access points per floor on a multi-storey home and dedicated coverage for any outdoor entertaining area where reliable connectivity matters. Each access point needs a Cat6A cable home-running to the cabinet and PoE capability at the switch. Density that looks generous on the plan rarely feels generous in use, and adding an access point later means either visible surface cable or another wall-opening exercise.

Neutral wires to every switch

This is the most commonly missed smart home infrastructure element in Australian residential construction - and the most frustrating to retrofit. Most wireless smart switch modules require both an active (live) and a neutral wire at the switch position to operate. Standard Australian switch wiring historically ran only the active wire to the switch, with the neutral staying at the light fitting.

Without a neutral wire at the switch, most smart switch products cannot be installed without additional wiring work. Retrofitting neutral wires to every switch in a completed home is extremely expensive and disruptive.

Specify in writing to your builder and electrician that a neutral wire must be run to every switch position throughout the home. Confirm this requirement in the electrical specification before rough-in begins and ask for written confirmation that it has been included. This is cheap during construction and very expensive after. Include this in your building contract specification.

Switchboard capacity

A smart home generates significantly more electrical load than a conventional home - particularly when EV charging, battery storage, solar inverters and always-on home automation systems are factored in. A switchboard that was adequately sized for a conventional home in 2020 may be inadequate for the same home with a 7kW EV charger, a 10kWh battery system and a home automation panel added in 2026.

Specify a switchboard with:

  • Sufficient circuit breaker slots for current circuits plus at least 30 to 40 percent additional capacity for future loads
  • A dedicated circuit for the home automation and communications system
  • A dedicated circuit and appropriate cable pre-run for EV charging - even if an EV is not currently owned
  • Appropriate provision for solar inverter and battery system connection

Communications cabinet

A communications cabinet - sometimes called a comms cabinet, data cabinet or home network hub - is a centralised location where all low-voltage cabling terminates. It houses the NBN connection box, router, network switch, patch panel, home automation hub and any other network infrastructure.

A well-located communications cabinet with adequate power, ventilation and physical space is the nerve centre of a smart home. A poorly located, undersized or inaccessible communications cabinet creates ongoing frustration for the life of the home.

Specify the communications cabinet location in a ventilated, accessible, centrally located space - a dedicated cabinet or large data cupboard near the centre of the home. Confirm it has a power outlet, adequate depth for rack-mounted equipment and a clear cable path from the NBN entry point.

The AV rack location decision sits alongside the communications cabinet. Where the home has multi-room audio, distributed video or any centralised AV equipment, that equipment lives in a rack that needs to be cool, ventilated, accessible for cable changes and large enough for at least a half-height rack with growth space. Co-locating the AV rack with the communications cabinet works if the cabinet is sized for it; otherwise a dedicated AV cupboard (often in a media room, study or central cupboard) needs to be planned at the same time as the comms cabinet. Both rooms benefit from a 20A circuit, dedicated cooling consideration and physical security in households with rented spaces or shared occupancy.

NBN lead-in conduit

The NBN lead-in conduit is the pipe that runs from the property boundary to the home's external telecommunications connection point. It is the homeowner's and builder's responsibility to install this conduit to NBN standards during construction.

Coordinate with your builder to ensure the NBN lead-in conduit is installed during the construction phase - ideally between lock-up and fit-out - to avoid later trenching through completed landscaping or driveways. Also specify an internal conduit run from the external NBN connection point to the communications cabinet location so the NBN connection box can be positioned where you want it rather than where it is convenient for the NBN technician. Understanding the building permit and construction stages helps coordinate this timing.

Who is responsible for what

RoleResponsibilityWhat to confirm
BuilderCoordinating the timing of electrical and data rough-in. Ensuring conduit runs are included in the build program. NBN lead-in conduit installationThat conduit runs, neutral wires and communications cabinet location are included in the specification before rough-in
Licensed electricianAll 240V electrical work including power points, switchboard, dedicated circuits, neutral wires and light fittings. All work must comply with AS/NZS 3000That neutral wires are run to every switch position. That switchboard has adequate future capacity. That conduit runs to key locations are included
Data cabler / communications installerCat6 or Cat6A ethernet cabling, patch panel installation, NBN lead-in conduit, communications cabinet setupThat Cat6A is specified. That data points are at all required locations. That all cables terminate at the communications cabinet
AV integrator / smart home specialistDesign and specification of the smart home system. Programming automation. Installation of devices, hubs and control systemsEngaged during design phase - not after lock-up. That their infrastructure requirements are communicated to the electrician and data cabler before rough-in
HomeownerCommunicating smart home requirements clearly to all trades during design. Confirming specifications in writing before rough-inThat all requirements are documented in the electrical and data specification before any walls are lined

The most important timing principle: The AV integrator or smart home specialist, if you are engaging one, must be engaged during the design phase - before rough-in. Their infrastructure requirements need to be communicated to the electrician and data cabler before walls are lined. An AV integrator engaged after lock-up can only work with what has already been installed. For guidance on engaging the right consultants, see how to choose a residential architect.

Pre-wire vs rough-in vs fit-off responsibility split

Within the wider responsibility table, smart home work splits across three sequenced phases - and each phase has a different responsible party. Confusing the phases is one of the most common ways smart home scope slips through the cracks of a residential contract.

Pre-wire happens during framing. The data cabler, working to a documented data point and conduit schedule, pulls every Cat6A run, every conduit and every dedicated cable from the communications cabinet to the relevant outlet position. The electrician runs neutral wires to every switch position and pulls dedicated circuits to the comms cabinet, AV rack, EV charger location and any other smart-home-relevant load. Nothing is terminated; cables are simply pulled, labelled and coiled.

Rough-in overlaps with pre-wire and continues until just before lining. This is when outlet boxes go in at the right positions, conduit is sealed at the right ends and the cable bundle into the comms cabinet is dressed and ready for termination. The site supervisor's job at this stage is to verify that the rough-in matches the documented schedule before the plasterer covers the evidence.

Fit-off happens after lining and painting. The data cabler terminates every Cat6A run at the outlet and at the patch panel, tests every run with a certification meter and documents the port assignment register. The AV integrator installs the rack equipment, access points, controllers and devices, programs the automation platform and commissions the system. Fit-off is when a smart home becomes "live" - but everything that makes it possible was decided at pre-wire.

The Matter standard and protocol compatibility

One of the most significant developments in smart home technology in recent years is the Matter standard - an open, royalty-free connectivity protocol developed by major technology companies to enable cross-brand device compatibility. Where previous smart home ecosystems were fragmented by brand - with different platforms all operating independently - Matter provides a shared language that allows compatible devices from different brands to work together.

For homeowners building in 2026, Matter is relevant in two ways:

First, when selecting smart home devices and systems, look for Matter compatibility on the product. Matter-compatible devices will work across ecosystems rather than locking you into a single brand's platform.

Second, the network infrastructure that supports Matter - particularly Thread mesh networking - operates over your home's existing Wi-Fi and ethernet infrastructure. Investing in quality network infrastructure during construction (adequate Wi-Fi access points at the right locations, ethernet drops for critical devices) is what makes Matter and future standards work reliably in practice.

The specific platforms and devices that support Matter will evolve. The network infrastructure in your walls will not.

Two practical Matter-era decisions sit alongside the standard itself. The first is Thread border router placement. Thread is the mesh radio protocol Matter uses for low-power devices, and a Thread border router (typically built into a hub, speaker or access point) sits at the boundary between Thread and the home network. Placing a border router centrally - or having multiple border routers in larger homes - is what makes Thread-based devices reliable. The second is coexistence with existing Zigbee or Z-Wave systems. Where the homeowner has an installed base of Zigbee devices (typically older smart switches or sensors), Matter does not retire them; the home runs both networks in parallel until devices are replaced. Planning the network with enough access point density and PoE switch capacity to host coexisting radio networks is a 2026 decision that the standards roadmap of three years ago did not anticipate.

Retrofitting vs building smart from the start

This is the fundamental comparison that drives most smart home planning decisions.

Building smart from the start - infrastructure specified and installed during construction:

  • Conduit runs: $50 to $200 per run during construction vs $300 to $1,500 per run after completion
  • Cat6A data point: $80 to $150 per point during construction vs $250 to $600 per point after completion
  • Neutral wire to switch: $15 to $40 per switch during construction vs $150 to $500 per switch after completion
  • Communications cabinet: $500 to $2,000 during construction vs $1,500 to $5,000+ after completion

Retrofitting smart capability into a completed home:

  • Significant disruption - walls opened, lined, repapered, repainted
  • Limited access to some wall cavities entirely - particularly between floors and in brick veneer construction
  • Wireless workarounds often required where cabling is impossible
  • Substantially higher total cost for equivalent outcome

The conclusion is simple: every dollar spent on smart home infrastructure during construction saves three to ten dollars in retrofitting costs later. For a detailed comparison of both approaches, see retrofitting vs building smart from the start.

Indicative cost

Smart home infrastructure package during new build - $5,000 to $20,000 | Equivalent retrofitting into a completed home - $15,000 to $60,000+

Common mistakes when building a smart home in Australia

  • Not specifying neutral wires to every switch - the most common and most frustrating oversight. Confirmed in writing before rough-in
  • Insufficient data points - two per room minimum. Most homeowners wish they had specified more
  • No conduit to key locations - particularly external walls, the garage and between floors
  • Communications cabinet in the wrong location - too small, inadequately ventilated, inaccessible or too far from the centre of the home
  • Engaging the AV integrator after lock-up - their infrastructure requirements cannot be incorporated after walls are lined
  • Specifying smart home devices rather than smart home infrastructure - devices are temporary. Infrastructure is permanent
  • Inadequate switchboard capacity - no provision for EV charging, battery storage or future loads
  • No internal conduit from NBN entry to communications cabinet - the NBN technician will install the connection box where it is convenient for them, not where you want it
  • Assuming Wi-Fi will handle everything - for devices requiring consistent performance, ethernet remains the reliable choice

Many of these are covered in detail in our companion guide on common smart home mistakes in new builds and how to avoid them. Also see common new home regrets in Australia.

What to ask your builder about smart home readiness

The questions below sit in three buckets, each tied to a contractual moment. Asking them in the right bucket is what determines whether the answer changes the build or just goes on the record.

Pre-contract bucket - asked before signing the builder preliminary agreement. These are the questions that establish what the builder is committing to deliver as part of the contracted scope versus what will be a variation. Anything that the builder defers as "to be quoted later" should be priced before signing; anything specified during this conversation should land in the contract documents. For the complete pre-contract framework, see what to ask a builder about smart home integration.

Pre-rough-in bucket - asked between slab and framing. These are the questions that confirm what is actually about to happen on site versus what was contracted. The site supervisor's answers here should align with the contract documents; where they do not, this is the moment to raise the discrepancy before the cable is pulled.

Pre-handover bucket - asked in the weeks before practical completion. These are the questions that confirm the documentation, commissioning and credential transfer that converts an installed smart home into a transferable asset. The checklist below combines all three buckets - tag each item with the bucket it belongs to before raising it.

Smart home infrastructure planning guide

The planning grid below is a working reference for what to specify per location. Above it sits the stage-by-stage planning logic that tells you when each decision needs to be locked in.

Design stage. Communications cabinet location and dimensions agreed. AV rack location agreed. Comms cabinet circuit specified. Smart home scope statement attached to the architectural drawings.

Builder preliminary agreement. Smart home infrastructure specification locked into the contract documents - data point counts, conduit routes, switchboard capacity, neutral wire requirement, EV provision, NBN conduit, documentation deliverables tied to payment milestones.

Frame stage. Conduit routes confirmed on site before plasterboard. Comms cabinet cupboard framed to specification. AV rack location built out.

Lock-up stage. All pre-wire complete and labelled. NBN lead-in conduit installed. Electrical rough-in complete including neutrals at every switch. Communications cabinet cable bundle dressed and ready for termination.

Fit-off stage. Cat6A runs terminated and certified. Patch panel populated and port-assigned. Access points installed and powered. AV rack equipment installed and racked. Switchboard energised with documented load schedule.

Pre-handover stage. Commissioning sign-off complete for every device. Automation rules exported. Credentials transferred. Documentation pack delivered. Pre-handover walkthrough completed with the integrator.

LocationMinimum data pointsConduit runsNotes
Living room2-4 Cat6AYes - to TV position and external wallsInclude power point for Wi-Fi access point
Main bedroom2 Cat6AYes - to external wallNeutral wire to all switch positions
Additional bedrooms1-2 Cat6AYes - to external wallNeutral wire to all switch positions
Home office3-4 Cat6AYesDedicated circuit preferred
Kitchen1-2 Cat6AYes - to external wallConsider sensor and camera locations
Garage1-2 Cat6AYes - EV charger conduit essentialDedicated EV circuit even if not currently needed
Outdoors / alfresco1 Cat6AYes - to camera and access point positionsWeatherproof rated outlets
Communications cabinet6-12 Cat6A terminationsYes - from NBN entry pointPower, ventilation, adequate depth
Roof spaceN/AYes - from switchboard for solar/batteryEmpty conduit now, cables later

Smart home infrastructure to specify during a new build

Smart home cost framework

Smart home costs in Australian new builds vary by an order of magnitude depending on scope. The framework below sets indicative ranges for three tiers so the conversation with the builder and the integrator can start from a shared baseline rather than from a blank page. All figures are construction-phase costs for the infrastructure plus the devices that sit on it - retrofit costs run materially higher and are covered separately in retrofitting vs building smart.

Entry tier - $5,000 to $15,000

Entry-tier smart homes deliver the infrastructure platform that makes future upgrades cheap, with a modest device layer at handover. Expect: structured Cat6A cabling to all main rooms, neutrals at every switch, a properly sized communications cabinet, conduit to all key external locations, EV-ready garage circuit, NBN internal conduit and a managed Wi-Fi system with two to three access points. Devices typically include a single-platform automation hub, a basic smart lighting subset on key circuits and an integrated alarm/camera system. Entry tier is the most cost-effective specification for owners who plan to layer in additional devices over time.

Mid tier - $15,000 to $40,000

Mid-tier smart homes layer integrated AV, lighting control across most circuits, multi-room audio in two to three zones, expanded camera coverage and integrated HVAC control on top of the entry-tier infrastructure. Expect: a managed PoE network with four to six access points, a documented VLAN plan, a half-height AV rack, an integrator-programmed automation platform and a credential and firmware register at handover. Mid tier is where most contemporary architect-designed new builds in capital city markets land in 2026.

Premium tier - $40,000 to $150,000+

Premium-tier smart homes deliver bespoke integration across lighting, AV, HVAC, security, access control, motorised window furnishings, irrigation and pool plant - all coordinated through a unified automation platform with custom scene programming. Expect: a full-height AV rack with redundant power, multiple access points per floor, dedicated subnets per system class, dedicated commissioning and post-handover tuning, and a documentation set that mirrors commercial AV installation standards. Premium tier is appropriate for luxury new builds and is typically scoped alongside the broader fit-out programme rather than as a discrete smart home line item.

What drives the cost

Three variables drive most of the variance within each tier: the number of circuits brought onto the lighting control system, the number of AV zones and the scope of integrated HVAC control. Each of these decisions adds both device cost and integrator programming time, and each can be staged - the infrastructure can be specified now and the device layer can be added over years if budget pressure requires sequencing.

Budget vs scope tradeoff

Where budget is constrained, the strongest move is to invest in infrastructure now and stage devices later. A home built with mid-tier infrastructure and entry-tier devices can be progressively upgraded to mid-tier devices over five years at incremental cost. A home built with entry-tier infrastructure and premium-tier devices delivers a worse experience and locks in retrofit cost when devices need to be expanded. The infrastructure-first principle is not just about cost minimisation - it is the strategy that preserves optionality.

Smart home commissioning and testing

Commissioning is the step that converts an installed smart home into a working one. Without commissioning, a smart home at handover is a collection of devices that have been physically installed but not collectively verified. With commissioning, it is a documented system with evidence that every component does what it was designed to do under realistic load.

What "commissioned" actually means

A commissioned smart home meets four conditions. Every device is paired to the automation platform and addressable. Every automation rule has been executed end-to-end and produced the expected result. Every scene has been activated and verified visually. Every credential has been transferred to the homeowner and the integrator's installation defaults have been retired. The commissioning sign-off is the document that records each of these conditions as tested and passed.

Network throughput tests

Every Cat6A run should be tested with a certification meter that confirms it meets the Cat6A standard for length, attenuation and crosstalk. The certification print-out becomes part of the handover pack. Beyond cable certification, the wireless network should be tested with a coverage survey - typically a heat map produced by walking the home with a measurement tool - that confirms each room has the signal strength and throughput the design targeted. Where the coverage survey shows dead zones, the integrator either repositions access points or adds one before sign-off.

Device pairing log

The device pairing log records every device that the automation platform recognises, the protocol it pairs over (Wi-Fi, Thread, Zigbee, Z-Wave, wired), its firmware version at the time of pairing and the platform ID assigned to it. This log is the master register that all other documentation hangs off; without it, no other smart home artefact has a stable reference.

Scene and rule validation

Every scene programmed during installation should be activated and visually confirmed by the integrator and the homeowner together at the pre-handover walkthrough. Every automation rule should be triggered (manually if needed) and the result observed. Where a rule cannot be triggered easily - for example a sunset-based rule tested at midday - the trigger should be simulated. The walkthrough record notes each scene and rule, the test method and the result.

Handover sign-off

The handover sign-off is the document that closes the commissioning process. It records the date of test, the parties present, the system as commissioned (typically as an attachment summarising the device list, automation rules and credentials) and the explicit homeowner acknowledgement that the system was working at handover. The sign-off is the artefact that the homeowner relies on when raising a defect later - it establishes that the system was functioning at the moment of handover, which shifts the burden of explanation onto whoever now claims otherwise. The sign-off should sit alongside the broader practical completion documentation and feed into any later warranty position.

Red flags

Warning signs
  • Builder claims smart home capability without referencing specific platforms or integration scope
  • "Smart home ready" framing with no specification document
  • No reference to data point counts, communications cabinet location, or switchboard sizing in plans
  • Vague pricing or "to be quoted separately" for smart home elements
  • No reference to a smart home integrator or specialist partnership
  • Builder cannot articulate the difference between pre-wiring and full integration
  • Documentation deferred to "weeks after handover" rather than delivered at practical completion
  • Warranty pathway unclear or builder defers entirely to subcontractors
  • No examples of previous smart home delivery with verifiable detail
  • "We can add smart features later" framing - most cannot be added cost-effectively
  • No commissioning sign-off offered as part of practical completion - system is handed over without documented test results
  • Network is sized as a single consumer router rather than a managed switch with structured cabling to multiple access points
  • No firmware baseline recorded at handover - cannot tell later whether a device fault is new or pre-existing

Use the pre-contract framework in what to ask a builder about smart home integration to test each of these signals before signing.

BUILTLY and smart home construction

BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.

For future owners and buyers, this record answers the questions that smart home capability always raises: what infrastructure is actually in the walls, who installed it and to what standard. For the broader framework, see the complete guide to building a house in Australia.

Frequently asked questions

What smart home infrastructure should I include in a new build in Australia?

The most important elements are: neutral wires to every switch position, Cat6 or Cat6A ethernet data points in every room and at every camera and access point location, conduit runs through key wall cavities for future cable pulls, a properly located and sized communications cabinet, dedicated circuits for EV charging and battery storage, and an internal conduit from the NBN entry point to the communications cabinet. These infrastructure elements are inexpensive during construction and very expensive to add after the walls are lined.

Why is a neutral wire important for smart home switches in Australia?

Most smart switch modules require both an active and a neutral wire at the switch position to operate. Traditional Australian residential wiring often ran only the active wire to the switch, with the neutral remaining at the light fitting. Without a neutral at the switch, most smart switch products cannot be installed without additional wiring work. Retrofitting neutral wires to every switch in a completed home costs $150 to $500 per switch. Specifying neutral wires during construction costs $15 to $40 per switch. Confirm in writing with your builder and electrician that neutral wires will be run to every switch position before rough-in begins.

Who is responsible for smart home infrastructure in a new build?

Responsibility is shared across multiple trades. The builder coordinates timing and ensures infrastructure is included in the build program. The licensed electrician installs all 240V work including power points, dedicated circuits, neutral wires and the switchboard. The data cabler installs Cat6A ethernet cabling and terminates it at the communications cabinet. An AV integrator or smart home specialist - if engaged - designs the system and specifies infrastructure requirements. The homeowner must communicate requirements clearly to all trades before rough-in. The critical principle is that the AV integrator must be engaged during the design phase, not after lock-up.

Is Wi-Fi sufficient for a smart home or do I need ethernet cabling?

Wi-Fi is convenient but ethernet is more reliable for devices requiring consistent performance - network switches, Wi-Fi access points, smart televisions, security cameras and video conferencing equipment all perform better on hardwired connections. A well-designed smart home uses ethernet as the backbone and Wi-Fi for mobile devices and wireless smart home sensors. Specify at least two Cat6A ethernet data points per main room and ensure Wi-Fi access points are hardwired rather than plugged into a powerpoint via a wireless connection.

What is the Matter standard and should it affect my smart home planning?

Matter is an open connectivity standard that allows smart home devices from different brands to work together across ecosystems. For new builds in 2026, Matter means device brand lock-in is less of a concern than it was previously. When selecting smart home devices, look for Matter compatibility on the product. For your build, Matter does not change the infrastructure requirements - you still need quality network infrastructure, data points at the right locations and conduit for future flexibility. Matter devices work over your existing Wi-Fi and ethernet infrastructure, so investing in quality network infrastructure during construction remains the most important smart home decision you will make.