Solar is one of the few trades on a residential build where a single decision (system size, panel choice, inverter brand, who installs it) sets the energy economics of the home for the next two decades. The work is regulated through Clean Energy Council (CEC) accreditation for rebate eligibility and through state electrical licensing for grid-connected work, and it sits next to the electrician, the roofer and the network distributor in the program. This guide explains what a solar installer actually does on a new build, how the accreditation and rebate framework fits together, what system types are common, when in the program the work happens, and how to choose the right installer.
What a solar installer does
A solar installer designs, supplies, installs and commissions solar photovoltaic (PV) systems for residential properties, and increasingly does the same for battery storage systems alongside the PV. On a new build the scope typically covers a site assessment, system design (panel layout, inverter selection, mounting plan, cable routing), panel and mounting installation on the roof, inverter installation, switchboard and meter integration, the grid connection paperwork with the network distributor, commissioning and monitoring setup.
There is a useful distinction worth naming early. Some solar installers are licensed electricians who hold CEC accreditation as well, and can perform every part of the work end-to-end. Others operate as accredited designers and installers who coordinate the licensed electrical work with a separate electrician on site. Both models are legitimate, but the responsibility chain (who designed it, who installed it, who certified the electrical work) should be clear in the quote and the handover paperwork.
Coordination on site involves more trades than the panel installation itself suggests. The roofer needs to integrate the mounting hardware with the roof system without compromising weatherproofing or warranty. The electrician (or the installer in their electrical capacity) connects the inverter to the switchboard and arranges the network meter change. The builder provides cable routes through walls or ceiling cavities for the runs from roof to inverter to switchboard. The earlier this coordination is set up, the cheaper and cleaner the install.
Scope variations to watch in the quote include whether battery storage is included or pre-wired only, whether the switchboard is being upgraded or assumed adequate, whether an EV charger circuit is being run at the same time, and who is responsible for the network connection application and any waiting time it introduces into the program. See all-electric new homes in Australia for the wider electrification picture.
CEC accreditation and the regulatory framework
The Clean Energy Council (CEC) administers the accreditation scheme that the federal small-scale renewable rebate program relies on. For a residential solar system to qualify for Small-scale Technology Certificates (STCs), the design and the install both have to be carried out by individuals holding the relevant current CEC accreditation. The accreditation is held by people, not businesses, so the question is not whether the company is CEC-accredited but who specifically inside the company holds what scope.
Accreditation is split across categories that distinguish design from install, grid-connect from off-grid, and PV-only from battery. The current category structure should be verified directly with the CEC rather than taken from a sales brochure, because the framework has changed several times and continues to evolve. The practical check is the same in every case: ask for the accredited person's name and accreditation number, then verify on the public register at cleanenergycouncil.org.au.
CEC accreditation does not replace the state electrical licence. Grid-connected solar is electrical work, and the person doing it (or supervising it) needs to hold the relevant state electrical authorisation as well. Where the installer holds both, one person can carry the whole job. Where the installer is accredited but not separately licensed for electrical, a named electrician has to be coordinated for the parts of the work that require it. Either model is fine if it is explicit; the failure mode is silence about which person does what.
Batteries add another layer. Battery installation work sits under a separate CEC battery endorsement, and a battery-included quote from an installer without that endorsement is a flag worth asking about before signing. Off-grid systems sit under their own endorsement again. The general rule: match the endorsement to the scope of the actual work being quoted.
Australian Standards relevant to solar installation cover PV system installation, grid-connect inverter requirements and battery installation safety. The standards are updated periodically and the relevant editions are referenced through CEC guidelines and through state regulation. Ask the installer which editions they are installing to and verify the current state of those standards with Standards Australia rather than relying on a quote.
For the broader pattern of licensed-trade verification on a build, see what does an HVAC installer do and what does a gas fitter do, which apply the same verify-on-the-public-register approach to other regulated trades.
Types of residential solar systems
Residential solar in Australia comes in a few common configurations. The right choice usually emerges from a conversation that combines current and projected energy use, available roof area, budget, and longer-term plans for batteries and electrification.
Grid-connected without battery
The most common configuration. Panels generate during the day, the inverter converts DC to AC, the home uses what it can in real time, and any excess is exported to the grid for a feed-in tariff. There is no backup capability during a grid outage. This configuration is the simplest, the cheapest to install, and the easiest to expand later by adding a battery.
Grid-connected with battery
Adds battery storage to the grid-connected system. Excess daytime generation charges the battery, which then discharges during evenings and overnight to displace grid imports. Some configurations provide backup capability during outages on selected circuits, depending on the inverter and battery chosen. This configuration improves self-consumption and reduces reliance on falling feed-in tariffs, at the cost of additional upfront spend.
Hybrid systems
A hybrid inverter is designed to manage grid, solar and battery simultaneously, often with the option to add a battery later. Specifying a hybrid inverter on day one is one way to make a system battery-ready without paying for the battery now. The compromise is a slightly higher inverter cost upfront.
Off-grid systems
Systems with no grid connection, typical on rural and remote properties where grid extension is impractical or expensive. Off-grid design is a specialist scope (battery capacity to cover several days of low generation, often a backup generator, careful load management) and requires a separately endorsed installer.
Solar hot water (separate from PV)
Solar hot water systems use solar thermal collectors to heat water directly and are a separate technology from PV. They are increasingly displaced by heat pump hot water units running on grid power and rooftop PV, but remain a valid option in some configurations.
Standalone smaller systems
Smaller standalone systems for pool pumps, shed lighting, gate motors and similar are a separate category and usually sit outside the CEC and STC framework. Treat them as their own scope, not as a substitute for a household PV system.
For the energy efficiency context that frames sizing, see NCC 2022 7-star energy requirements and all-electric new homes in Australia.
STCs, rebates and feed-in tariffs
Three financial mechanisms shape the economics of a residential solar system. They are easy to confuse and they change often, so the right move is always to verify current arrangements with the source authority rather than rely on a guide or a quote alone.
Small-scale Technology Certificates (STCs)
STCs are a federal scheme administered by the Clean Energy Regulator. Eligible systems are issued a number of certificates based on system size, geographic zone and a deeming period, and those certificates carry a market value. In practice the installer (or the retailer) claims the STCs on your behalf and discounts the quote upfront. The deeming period steps down over time, which is why the same system installed a year later attracts a smaller STC contribution.
Specific STC values are not given here because they vary with system size, zone, deeming step and the market price for certificates on the day of the transaction. Verify the current rules and current values at the Clean Energy Regulator at cleanenergyregulator.gov.au.
State rebates and incentives
Individual states and territories run their own rebate and loan programs, often with eligibility tied to household income, property value, system size or battery inclusion. Programs open, close, change eligibility or run out of budget on their own schedules, and the most common cause of disappointment is treating a friend's experience from last year as current. Verify current state programs with the state energy authority for the project's location before factoring a rebate into the budget.
Feed-in tariffs
Feed-in tariffs are paid by the electricity retailer for energy exported to the grid. Rates vary by retailer and by state, and have been declining over time as grid solar saturation increases during peak generation hours. A quote that assumes a generous feed-in tariff to make the economics work is leaning on a number that may not survive the first plan switch. Treat feed-in revenue as a supplement to self-consumption savings rather than the main return on the system.
Battery rebates have appeared and disappeared in several states and continue to evolve. Where one is available it can change the case for adding a battery now versus later. Verify with the relevant state authority on the day of decision.
For the broader budget framework around solar within a build, see construction loans in Australia.
When solar installation happens in the build sequence
Solar threads through several stages of a build, with the most leverage available before frame.
Pre-construction design
The cheapest design decisions happen on paper. Roof orientation and pitch, roof structure capacity to carry mounting hardware, electrical capacity at the switchboard, inverter position, EV charger forward-planning and battery future-proofing are all easier to set during design than to retrofit later. A solar installer involved at this stage can save more in build cost than they cost in fees. See architectural drawings in Australia for the drawing set that frames these conversations.
Frame and rough-in
During the frame and electrical rough-in, cable routes from the planned panel positions to the inverter, from the inverter to the switchboard, and from the switchboard to any battery position are pulled while walls are open. Conduit is left ready for the panels to land on later. This is also when the switchboard capacity decision is locked in: it is much cheaper to install the right switchboard now than to upgrade it after handover.
Post-roof installation
After the roof is on and weatherproof, the mounting system is fixed to the roof structure, panels are installed and the panel-side DC wiring is completed back to the inverter. The roofer's involvement in the mounting decisions matters for warranty: penetrations through a tiled or sheet metal roof have to be made and flashed in a way that preserves the roof manufacturer's warranty.
Electrical fit-off and grid connection
The inverter is installed and connected to the switchboard. The network distributor's approval to connect the system to the grid is arranged, and a bidirectional meter is installed by the meter provider. Timing on the meter and connection paperwork is often the slowest part of the whole process, so getting the application in early is worth more than rushing the install.
Commissioning and handover
The system is powered on, tested, monitoring is configured, and the homeowner is walked through the monitoring portal, the inverter display and basic fault response. Commissioning documentation, the grid connection approval and the warranty registrations are handed over with the rest of the handover pack. See the final inspection checklist for the broader handover frame.
How solar installers charge
Residential solar is almost always quoted as supply-and-install for a complete system. Installation-only and design-only quotes exist but are less common in the new-build context. Service work after handover is typically priced as a callout plus parts and labour. Specific dollar figures vary with system size, component quality and region, and any number printed in a guide today is likely to be out of date soon; rely on three current quotes for the project itself.
The main cost drivers are system size in kilowatts (the single biggest factor), the panel tier, the inverter brand and capability (hybrid or string), whether a battery is included, the complexity of the roof and mounting hardware, and any switchboard upgrade required for the connection. EV charger circuits run at the same time, monitoring upgrades and three-phase versus single-phase work also move the price.
What is typically included in a base quote: the panels, the inverter, the mounting system, DC and AC wiring, isolators, the standard monitoring, commissioning, the grid connection application, and the STC discount applied upfront. What is commonly quoted as extras: switchboard upgrades, battery storage, monitoring upgrades beyond the basic portal, isolator relocations driven by network rules, three-phase upgrades, and structural penetrations needing a builder rather than the solar team.
Quote comparisons only make sense when the line items match. A solar quote at one price with named tier-1 panels and a hybrid inverter sits in a different reality to a cheaper quote with unspecified panels and an entry-level string inverter, even though both are described as the same kilowatt size. The right comparison happens line by line before the bottom line. Cheap solar is rarely a bargain over the system's 15 to 25 year life.
For the broader fee-structure comparison frame, see interior design costs, and for budget context overall construction loans in Australia.
How to choose a solar installer
A short discipline before committing removes most of the long-term risk on this part of the build.
Authorisations to verify
- Current CEC accreditation for the individual designing and the individual installing, verified by name and number at cleanenergycouncil.org.au.
- Current state electrical licence for the installer or for the named electrician on the job, verified with the relevant state electrical regulator.
- CEC battery endorsement where a battery is in scope.
- Current public liability insurance at a level appropriate to roof and electrical work, with workers compensation cover.
Quality signals
- Authorised installer status with the panel and inverter manufacturers being quoted. Manufacturer warranties on many brands depend on it.
- Solar Retailer code of conduct signatory status, which signals a different posture on quoting and sales conduct.
- References from recent residential installs of similar scope, including any with battery storage if a battery is in your scope.
- A written quote with full specifications, model numbers, capacities, warranties and the STC contribution itemised.
- Willingness to share the assumptions behind the recommended system size.
Comparing quotes
Compare quotes line by line, not just kilowatt size against price. Panel make and model, inverter make and model, mounting hardware, monitoring inclusion, workmanship warranty length, performance warranty terms and battery-readiness all matter and all move price. Two systems described as the same size can be very different products.
For the broader trade verification pattern, see how to verify a builder's past projects.
Common issues with solar installation
A handful of recurring issues account for most of the post-install complaints worth knowing about.
Sizing mismatches
A system sized too small for actual use leaves savings on the table for the life of the install. A system sized too large for the home's use and the prevailing feed-in tariff stretches the payback period without adding self-consumption value. A sizing decision should sit on documented assumptions about consumption and electrification plans, not on rule-of-thumb numbers.
Orientation, tilt and shading
Panels facing the wrong direction or tilted at a suboptimal angle produce less than they could. Shading from chimneys, neighbouring trees, antennas or future builds reduces production disproportionately on string inverter systems. A site assessment that includes shading analysis is the only way to set this honestly upfront.
Inverter and component mismatch
Inverter capacity that does not match the panel array, undersized cabling, or DC isolators that do not match local network requirements all show up as performance or compliance issues later. Specifying components from compatible product families and from CEC-approved lists reduces this risk.
Mounting and weatherproofing
Poorly installed mounting hardware is one of the leading sources of long-term roof leaks attributed to solar. Penetrations have to be made and flashed in a way that preserves the roof manufacturer's warranty, and the mounting system has to be rated for the wind region and the roof type.
Documentation and monitoring gaps
Systems installed without commissioning records, without grid connection approval on file, without warranty registrations completed, or with monitoring never configured leave the homeowner without visibility into how the system is performing and without the documentation needed for a warranty claim later. See the building handover package for the documentation framework and builder warranties in Australia for the warranty context.
Grid connection delays
The network distributor's approval and the meter change are often the slowest steps in the program. A system that is physically installed but waiting on connection is producing nothing and exporting nothing. Getting the connection application in early, and making sure the installer is managing it rather than leaving it to the homeowner, is the most reliable way to shorten the gap.
Warning signs when reviewing solar installer quotes
Solar has a longer history than most trades of high-pressure sales tactics. Any single item below is reason to slow down, ask more questions, and in most cases choose someone else.
Warning signs
- Installer unable to provide a current CEC accreditation number. CEC accreditation is the baseline for STC eligibility and for warranty validity on most brands. Inability or reluctance to produce it is reason to stop.
- Quote without a site assessment. Roof orientation, tilt, shading, structural condition and switchboard capacity all change the system. A quote produced without visiting (or carefully reviewing photos and plans of) the site is a quote based on guesswork.
- System sized without reference to your actual energy use. Generic sizing by household size or square metres tends to misfire. Expect questions about your bills, your appliances, EV plans and electrification roadmap.
- Pressure to oversize without supporting analysis, or to undersize to hit a price point. Both directions cost you money over the system's life. A defensible kW number sits behind a documented set of assumptions.
- Vague panel and inverter brand specifications. Quotes that say 'tier 1 panels' or 'quality inverter' without naming model numbers cannot be compared, enforced or verified for warranty later.
- No mention of commissioning documentation or grid connection paperwork. Commissioning records and the network distributor's connection approval belong with you at handover. Quotes silent on both are leaving the documentation hole for you to discover later.
- Significantly below-market price without a quality explanation. Cheap solar is usually cheaper for a reason. Ask what is different about the components, the install, or the warranty before assuming the bargain is real.
- Brand named without authorised installer status confirmed. Manufacturer warranties on many panels and inverters depend on installation by an authorised installer. Verify the status with the manufacturer, not just the installer.
- No insurance certificate of currency offered. Public liability cover at a level appropriate to roof work and electrical work is non-negotiable.
- Verbal-only warranty terms. Workmanship, product, performance and battery warranties should be in writing and on file. Verbal promises do not survive a callback dispute years later.
- STC value not transparent in the quote. The STC discount belongs to you. The quote should make clear what the system price is, what the STC contribution is, and what you actually pay after it is applied.
- High-pressure door-knock or cold-call sales tactics. Solar Retailer code of conduct signatories work to a different standard. High-pressure tactics are correlated with the rest of the warning signs on this list.
- Resistance to providing manufacturer documentation at handover. Datasheets, installation manuals, commissioning sheets and warranty registration documents belong with you. Refusal to hand them over is a warning sign.
- Subcontract chain unclear. If the salesperson is not the designer, and the designer is not the installer, ask who actually does the work and confirm each link's authorisations.
- Battery promises without battery-specific CEC endorsement. Battery installation is a separately endorsed scope under the CEC framework. Promises about batteries from an installer without the endorsement are a flag to verify before signing.
BUILTLY and solar installer verification
Solar installs are long-life assets. A typical residential PV system is expected to operate for 15 to 25 years, and the economics depend on workmanship that is hard to inspect from the ground, accreditation that has to remain current, and documentation that has to survive ownership changes and warranty claims years down the line. The decisions that shape all of this are made once, at install, by a single installer. Structured records of who did the work, what equipment was used, what the commissioning data looked like and what the connection approval said turn that decision from a leap of faith into a record-led one.
BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.
BUILTLY is heading toward a 2026 launch. Until then, the guide library, including the complete guide to building a house in Australia, is the active value: a careful reference for anyone navigating a build right now.
Frequently asked questions
Do solar installers in Australia need a special licence?
Two things have to line up. The installer (or a named electrician they coordinate with) must hold the relevant state electrical licence for grid-connected work, and the person doing the design and install must hold current Clean Energy Council (CEC) accreditation if the system is to qualify for the federal Small-scale Technology Certificate (STC) rebate. Battery work requires a separate CEC battery endorsement. Verify the electrical licence with the relevant state regulator and the CEC accreditation at cleanenergycouncil.org.au before signing.
What size solar system do I need for a new home?
System size should follow from a review of your expected electricity consumption, the available unshaded roof area, the roof orientation and tilt, and your plans for batteries, electric vehicles or electrified heating and hot water later. A bigger system is not automatically better: once feed-in tariffs are taken into account, an oversized system can take longer to pay back than a system matched to actual use. Ask the installer to share the assumptions behind the recommended kW size.
How do STCs and rebates actually work?
Small-scale Technology Certificates are a federal scheme that produces an upfront discount at the point of sale, claimed by the installer or retailer on your behalf and passed through as a reduced quote. The certificate value depends on system size, location zone and a deeming period that steps down over time. Some states layer additional rebates and battery incentives on top, with their own eligibility rules and budgets that change. Specific dollar values are not given here because they move; verify the current federal scheme at the Clean Energy Regulator and the current state programs at your state energy authority.
When in the build should solar be installed?
Solar is easiest and cheapest when designed in from the start. Roof orientation and pitch, structural capacity, cable routes from roof to inverter, inverter position, switchboard capacity and the meter arrangement are all set during design and frame. Physical installation typically happens after the roof is on and the electrical rough-in is complete, with commissioning and grid connection paperwork closing the work out before handover. Retrofitting solar after handover usually means a switchboard upgrade and surface-mounted conduit, which is more expensive than designing it in.
Should I add a battery now or later?
Either approach is defensible. Adding the battery at install time uses one site visit, one set of grid connection paperwork, and gives you immediate self-consumption of generated power. Adding it later lets you wait for prices to drop, capacity to improve and current rebates to evolve, at the cost of a second mobilisation and possibly a second switchboard touch. The compromise position is battery-ready: install the system today with an inverter, switchboard and wiring sized to accept a battery later without major rework. Ask the installer to specify what battery-ready means in writing.
Why are some solar quotes so much cheaper than others?
Solar pricing varies with panel quality, inverter brand, mounting hardware, installer practices and warranty terms. A significantly cheaper quote usually differs from a more expensive one in at least one of those dimensions: cheaper panel tier, entry-level inverter, lighter mounting hardware, shorter workmanship warranty, or no battery-readiness. Solar systems are 15 to 25 year assets, so the long-term comparison matters more than the day-one price. Lay quotes out line by line before reading the bottom line.
Related guides
What Does an HVAC Installer Do in Construction Australia
What Does a Gas Fitter Do in Residential Construction Australia
All-Electric New Homes in Australia: A Complete Guide
NCC 2022 7-Star Energy Requirements for New Homes Australia
Construction Loans in Australia
Complete Guide to Building a House in Australia