Building a Home in Australia: Who Is Involved and What They Do

Last updated: May 2026

Building a home in Australia involves far more people than most homeowners realise when they first embark on the journey. Beyond the builder who constructs the physical building, a typical residential construction project involves architects, engineers, certifiers, surveyors, consultants, trades and a range of other professionals - each with a distinct role, distinct obligations and distinct expertise.

Understanding who is involved in building a home, what each person does, when they are engaged and how they relate to each other is one of the most valuable pieces of knowledge a homeowner can have before beginning a construction project. This understanding helps homeowners ask the right questions, engage the right people at the right time, understand who is responsible for what and avoid the costly mistakes that come from not knowing what they did not know.

This guide explains every member of the project team involved in building a home in Australia - from the first professional engaged to the last one standing at handover.

The Design Team

The Architect

The architect is the creative and technical leader of the design process. A registered architect holds a degree in architecture, has completed a period of supervised practice and is registered with the Architects Registration Board in their state or territory. In Australia, only registered architects can legally use the title "architect."

What they do:

  • Translate the client's brief into a design that responds to the site, the climate and the lifestyle of the occupants
  • Prepare design documentation - floor plans, elevations, sections and details - through concept, schematic and design development phases
  • Prepare construction documentation - the detailed drawings and specifications that the builder uses to construct the building
  • Administer the building contract - certifying progress payments, assessing variations, carrying out site inspections and certifying practical completion
  • Coordinate the consultant team - structural engineer, hydraulic engineer, landscape architect and others

When they are engaged: Typically the first professional engaged - before any other consultant or builder. The design process begins with the architect and the client developing a brief together.

What they cost: Architect fees for full services on a custom residential project typically range from 10 to 15 percent of the construction cost. For more detail on choosing and engaging an architect refer to the BUILTLY guide on How to Choose a Residential Architect in Australia.

The Building Designer

A building designer - sometimes called a draftsperson or building design practitioner - provides design and documentation services similar to those of an architect but without the same level of academic training or regulatory registration requirements. Building designers are regulated differently across Australian states and territories.

What they do:

  • Prepare design documentation and construction drawings for residential projects
  • Lodge development applications and building permit applications
  • Provide design advice on floor plans, facades and material selections

When they are engaged: Building designers are most commonly engaged on standard residential projects - project home modifications, renovations, extensions and straightforward new dwellings - where the design complexity does not warrant full architectural services.

What they cost: Building designer fees are typically lower than architect fees - ranging from $5,000 to $30,000 for a standard residential project depending on the scope of work.

For more detail on the distinction between architects and building designers refer to the BUILTLY guide on Builder vs Architect vs Designer: Who Does What.

The Interior Designer

The interior designer is responsible for the design of the interior environment - the spatial planning, material palette, fixtures, fittings, furniture and finishes within the building. On residential projects the interior designer works in close collaboration with the architect to create a cohesive design outcome.

What they do:

  • Develop the interior design concept - materials, colours, textures and finishes
  • Specify all interior fixtures and fittings - kitchen joinery, bathroom fittings, floor finishes, lighting and hardware
  • Prepare interior documentation - joinery drawings, finish schedules and furniture layouts
  • Coordinate with the architect and builder on interior construction details
  • Source and specify furniture, soft furnishings and decorative elements

When they are engaged: Ideally engaged early in the design process - working alongside the architect from schematic design rather than being brought in after construction documentation is complete. Late engagement of an interior designer often results in costly changes to completed documentation.

What they cost: Interior designer fees typically range from 5 to 10 percent of the construction cost for comprehensive services, or a fixed fee for defined scope engagements.

The Landscape Architect

The landscape architect designs the outdoor environment - the gardens, terraces, pools, driveways and landscaping that form the setting of the building. On quality residential projects the landscape architect is an integral member of the design team whose work is as important as the interior design.

What they do:

  • Design the garden, planting scheme, hard landscaping and outdoor living areas
  • Specify paving, retaining walls, drainage and irrigation systems
  • Coordinate pool design and outdoor structures with the architect
  • Prepare landscape documentation for construction and DA submission
  • Specify plant species, sizes and planting arrangements

When they are engaged: Ideally engaged during the design development phase - when the building footprint and outdoor areas are being resolved. Earlier engagement allows the landscape design to inform the building design rather than simply responding to it.

The Engineering Team

The Structural Engineer

The structural engineer is responsible for the design of all structural elements of the building - the foundations, floor structure, wall framing, roof structure and any specialist structural systems. Structural engineering input is required on every residential construction project.

What they do:

  • Assess the geotechnical conditions of the site and design the appropriate foundation system
  • Design the structural frame - steel, concrete or timber - and prepare structural drawings and specifications
  • Certify the structural documentation for building permit submission
  • Carry out site inspections at key structural stages during construction
  • Assess and certify structural elements after construction - particularly for unusual or complex structural systems

When they are engaged: During design development - once the architectural design is sufficiently resolved to allow structural design to begin. On challenging sites the structural engineer may be engaged earlier - during concept design - to provide input on feasibility.

What they cost: Structural engineering fees for residential projects typically range from $3,000 to $15,000 depending on the project complexity. For more detail refer to the BUILTLY guide on Structural Engineer vs Architect: What's the Difference in Australia?

The Hydraulic Engineer

The hydraulic engineer - sometimes called a plumbing engineer or hydraulic consultant - designs the water, sewer, stormwater and drainage systems for the building and site. Hydraulic engineering is typically required for larger or more complex residential projects.

What they do:

  • Design the water supply and plumbing system - pipe sizing, fixture layouts and hot water system selection
  • Design the stormwater drainage system - roof drainage, site drainage and detention where required
  • Design the sewer connection and drainage system
  • Prepare hydraulic documentation for building permit and DA submission

When they are engaged: During design development - typically after the structural engineer is engaged and the building layout is resolved.

The Geotechnical Engineer

The geotechnical engineer - sometimes called a soil engineer or geotech - assesses the physical properties of the soil and rock on a construction site. Geotechnical investigation is required on most new residential construction sites.

What they do:

  • Carry out on-site soil testing - bore holes, test pits or dynamic cone penetrometer tests
  • Prepare a geotechnical report assessing soil bearing capacity, soil classification and foundation design recommendations
  • Advise on the presence of rock, fill, expansive soils, groundwater or other site conditions that affect foundation design

When they are engaged: Early in the design process - typically before structural engineering design begins. The geotechnical report informs the structural engineer's foundation design. For more detail refer to the BUILTLY guide on Development Site Due Diligence in Australia: What to Check Before You Buy.

The Civil Engineer

The civil engineer designs the civil infrastructure associated with a residential construction project - roads, site drainage, retaining structures and earthworks. Civil engineering input is most commonly required on sloped sites, sites with significant drainage requirements or multi-dwelling development projects.

What they do:

  • Design earthworks and retaining systems for sloped or complex sites
  • Design site drainage and stormwater management systems
  • Prepare civil documentation for DA and building permit submission
  • Provide site supervision for civil works during construction

The Regulatory Team

The Building Certifier

The building certifier - also called a building surveyor in some states - is the licensed professional responsible for assessing the proposed construction for compliance with the National Construction Code and issuing the building permit. Building certifiers are engaged by the owner rather than the builder.

What they do:

  • Assess the building permit application - reviewing drawings and documentation for NCC compliance
  • Issue the building permit authorising construction to commence
  • Carry out mandatory inspections at defined stages during construction
  • Issue the certificate of occupancy at practical completion confirming the building is suitable for occupation

When they are engaged: After the design documentation is sufficiently complete to support a building permit application - typically after construction documentation is finalised. For more detail refer to the BUILTLY guide on Building Permit in Australia: What It Is and How to Get One.

The Town Planner

The town planner - also called a planning consultant - provides advice on the planning framework applicable to the site and assists with the preparation and lodgement of development applications.

What they do:

  • Assess the planning controls applicable to the site - zoning, overlays, setbacks, height limits
  • Advise on the development approval pathway - complying development, full DA or other pathways
  • Prepare and lodge the development application
  • Liaise with council planners during the assessment process
  • Respond to requests for additional information from council

When they are engaged: Early in the design process - before or during concept design - to confirm what planning approvals are required and what the applicable controls allow.

The Land Surveyor

The land surveyor provides accurate measurements of the land - its boundaries, levels, dimensions and features. Survey information is required at multiple stages of a residential construction project.

What they do:

  • Prepare a site survey - measuring and documenting the boundaries, levels, existing structures, easements and other features of the site
  • Set out the building on the site - marking the exact position of the building footprint before construction commences
  • Prepare subdivision plans where a site is being subdivided
  • Verify finished floor levels and setbacks during construction where required

When they are engaged: Before design begins - a site survey is typically the first piece of technical information required by the architect. The surveyor may also be engaged during construction for building set-out.

The Construction Team

The Builder

The builder - also called the head contractor or principal contractor - is the licensed professional responsible for constructing the building. The builder manages the construction process from site establishment to practical completion - coordinating all subcontractors, suppliers and site activities.

What they do:

  • Enter into the building contract with the owner and take responsibility for delivering the project to the contract price, programme and quality standard
  • Manage site establishment - fencing, hoarding, site facilities, service connections
  • Coordinate and supervise all subcontractors and trades
  • Source and manage all materials and suppliers
  • Manage the construction programme - sequencing trades and activities to maintain schedule
  • Manage quality control - ensuring the work meets the specification and drawing requirements
  • Communicate with the owner and architect throughout construction

When they are engaged: After the design documentation is sufficiently complete to support a competitive tender. For more detail on choosing a builder refer to the BUILTLY guide on How to Choose a Builder for Your Home.

The Site Supervisor

The site supervisor - sometimes called the foreman or site manager - is the builder's representative on site. They manage the day-to-day construction activities - supervising trades, coordinating deliveries, managing safety and maintaining programme.

What they do:

  • Supervise all trade and subcontractor work on site
  • Coordinate the daily and weekly construction programme
  • Manage construction site safety - ensuring all workers comply with safety requirements
  • Communicate with subcontractors, suppliers and the project manager
  • Identify and escalate issues that require the project manager's attention

When they are on site: Present on site throughout the construction period - from site establishment to practical completion. For more detail on the site supervisor's role refer to the BUILTLY guide on Site Supervisor in Australia: Role, Responsibilities and What to Expect.

Subcontractors and Trades

The builder engages a range of specialist subcontractors and trades to carry out the physical construction work. Each trade is responsible for a defined element of the construction.

Key trades on a residential construction project:

Concreters - Pour and finish the concrete slab, footings and any other concrete elements - including off-form concrete feature walls and structural elements.

Framers - Erect the timber or steel structural frame - wall frames, roof trusses and floor frames - in accordance with the structural engineer's documentation.

Roofers - Install the roof covering - tiles, metal roofing or membrane roofing - including all flashings, gutters and downpipes.

Bricklayers and stonemasons - Lay brickwork, blockwork and stone cladding where these materials are included in the design.

Plumbers - Install the plumbing and drainage systems - rough-in during construction and fit-off at the completion of the project. A licensed plumber is required for all plumbing work in Australia.

Electricians - Install the electrical wiring and systems - rough-in during construction and fit-off at completion. A licensed electrician is required for all electrical work in Australia.

Plasterers - Apply the internal plasterboard lining - hanging, stopping and finishing the plasterboard to the specified level of finish.

Tilers - Install floor and wall tiles throughout the project - including waterproofing in wet areas before tiling commences.

Painters - Apply the internal and external paint system - preparation, priming, undercoating and topcoating to the specified colour scheme.

Joiners and cabinet makers - Manufacture and install the kitchen joinery, bathroom vanities, wardrobes and other built-in joinery specified in the design.

Glaziers - Supply and install windows, doors and glazing systems - including double glazing where specified.

Floor finishers - Install and finish floor coverings - timber floors, carpet, vinyl and other floor finishes - at the fit-off stage of construction.

The Project Management Team

The Project Manager

A dedicated project manager - engaged by the owner - coordinates all aspects of the project on the owner's behalf. On straightforward residential projects the architect often provides project management functions through their contract administration role. A dedicated project manager is most valuable on larger or more complex projects.

What they do:

  • Manage the project programme - coordinating the activities of the design team, builder and consultants
  • Manage the project budget - tracking costs against budget and forecasting the cost to complete
  • Administer the building contract - certifying payments, assessing variations and managing disputes
  • Represent the owner's interests throughout the project

For more detail refer to the BUILTLY guide on Construction Project Management in Australia: A Complete Guide.

The Quantity Surveyor

The quantity surveyor provides cost management expertise - from initial feasibility estimates through to final account. For more detail refer to the BUILTLY guide on Quantity Surveyor Australia: What They Do and When to Engage One.

Other Specialists

The Energy Efficiency Assessor

The energy efficiency assessor - sometimes called a NatHERS assessor - assesses the thermal performance of the building design and produces a NatHERS star rating. A minimum energy efficiency rating is required for all new residential buildings in Australia under the National Construction Code.

What they do:

  • Review the architectural drawings and specifications
  • Model the thermal performance of the building using NatHERS-accredited software
  • Produce a NatHERS certificate confirming the star rating
  • Advise on design changes that would improve the energy efficiency rating

When they are engaged: During design development - before construction documentation is finalised - so that any recommended design changes can be incorporated without costly documentation revisions.

The Building Inspector

An independent building inspector carries out inspections of the construction work at key stages - providing the owner with an independent assessment of quality separate from the building certifier's compliance inspections.

What they do:

  • Inspect the construction work at key stages - slab, frame, lock-up and practical completion
  • Identify defects, non-compliant work and quality issues
  • Prepare written inspection reports for the owner

When they are engaged: At key construction stages - particularly at practical completion before the owner signs off on handover.

The Heritage Consultant

For projects involving heritage listed properties or sites subject to heritage overlays, a heritage consultant provides specialist advice on heritage significance and assists with heritage impact assessments. For more detail refer to the BUILTLY guide on Heritage Homes in Australia: Renovation, Building and What to Expect.

How the Project Team Works Together

The project team on a residential construction project is not a flat group of independent professionals - it is a structured hierarchy with defined relationships and lines of communication.

The typical team structure:

The owner sits at the top - making all key decisions and approving all expenditure. The architect acts as the owner's representative - coordinating the consultant team and administering the building contract. The builder manages the construction team - directing all subcontractors and trades on site.

Key relationships:

  • The owner and architect work together throughout the design and construction process
  • The architect coordinates all consultants - structural engineer, hydraulic engineer and others
  • The builder is engaged by the owner through the building contract but works closely with the architect during construction
  • The building certifier is independent of both the architect and the builder - providing objective compliance assessment
  • Subcontractors are engaged by and report to the builder - not the owner or architect

Understanding these relationships helps homeowners know who to contact when issues arise and whose responsibility different aspects of the project are.

Frequently Asked Questions

Do I need all of these professionals for my project?

No - the professionals required depend on the scale and complexity of your project. A simple renovation may require only a building designer, a builder and a building certifier. A complex custom home on a challenging site may require the full team described in this guide. Your architect or building designer can advise on which consultants are required for your specific project once the scope is understood.

Who coordinates all the different professionals on a building project?

On most residential projects the architect coordinates the consultant team - engaging structural, hydraulic and other engineers and incorporating their documentation into the construction drawings. The builder coordinates all subcontractors and trades on site. Where a dedicated project manager is engaged they provide overall project coordination on behalf of the owner.

What is the difference between a building certifier and a building inspector?

A building certifier is a licensed professional who issues the building permit and carries out mandatory compliance inspections - confirming the construction meets NCC requirements. A building inspector is an independent professional engaged by the owner to assess construction quality at key stages - providing an owner's advocate assessment separate from the certifier's compliance role. Having both provides the strongest protection for the owner.

How do I know which architect, engineer or consultant to engage for my project?

Referrals from professionals you are already working with are the most reliable source. Your architect will typically recommend structural, hydraulic and other engineers they have worked with successfully on comparable projects. For architect selection, refer to the BUILTLY guide on How to Choose a Residential Architect in Australia. For builder selection refer to How to Choose a Builder for Your Home.

Who is legally responsible if something goes wrong during construction?

Legal responsibility depends on who made the decision or carried out the work in question. The builder is responsible for the quality of construction and the management of subcontractors. The architect is responsible for the quality of the design and documentation. The structural engineer is responsible for the structural design. The building certifier is responsible for compliance assessment. Where multiple parties have contributed to a problem, legal responsibility may be shared. Home warranty insurance provides a backstop protection for homeowners where a builder is unable to rectify defects.