Verification

Certificate of Currency Australia: What Builders and Trades Need to Know

Last updated: October 2026 ·

A certificate of currency is a document issued by an insurer confirming that a specific insurance policy is current and in force. In residential construction, certificates of currency are one of the most important documents a homeowner or developer should request before allowing any builder or trade to commence work on their property.

A builder who cannot produce a current certificate of currency for the relevant insurance types is either uninsured or operating with lapsed cover - both of which expose the homeowner to significant financial and legal risk. This guide explains what a certificate of currency is, what it must show, which insurance types require one and what to do if a builder cannot or will not provide one.

What is a certificate of currency?

A certificate of currency - sometimes called a COC - is a summary document issued by an insurance company or broker confirming that a named insured holds a current insurance policy of a specified type, covering a specified period and up to a specified limit. It is not the full insurance policy document - it is a confirmation that the policy exists and is currently active.

In the construction industry, certificates of currency serve as the primary mechanism by which builders, trades and subcontractors demonstrate to clients, head contractors and regulatory bodies that they hold the insurance cover required for the work they are undertaking.

A certificate of currency is only valid for the period shown on it. Insurance policies are typically renewed annually. A certificate of currency showing a policy period that has expired is not evidence of current cover - it is evidence of previous cover that may or may not have been renewed.

Why certificates of currency matter in residential construction

When a builder or trade works on your property, you are exposed to financial risk if they cause damage, injure someone or fail to complete their work. Insurance transfers this risk to the insurer - but only if the insurance is actually current at the time the loss occurs.

A builder who presents a certificate of currency from six months ago may have had their policy lapse, cancelled or not renewed since that date. A certificate that appears professional and legitimate can be out of date. Verifying currency - not just existence - is the point of the exercise.

The specific risks that certificates of currency protect against:

  • Property damage. A trade who damages your home during the course of their work is financially responsible for that damage. If they are uninsured and lack the financial means to pay, you bear the cost. Public liability insurance covers this risk - but only if it is current.
  • Personal injury. If a worker is injured on your property during construction, liability may fall on the property owner as well as the employer depending on the circumstances. Workers compensation insurance covers this risk for the builder's employees - but only if it is current.
  • Incomplete or defective work. Home warranty insurance covers the homeowner if the builder fails to complete the work, carries out defective work and cannot rectify it, or becomes insolvent. This is mandatory for residential building work above defined thresholds in most states - but the certificate must be for your specific project, not a generic policy confirmation.

What a certificate of currency shows

FieldWhat it showsWhat to check
Insured nameThe name of the policy holder - individual or companyMust match the name of the entity you are contracting with exactly
Insurer nameThe insurance company issuing the policyConfirm it is a recognised Australian insurer - not an offshore or unregulated provider
Policy numberThe unique identifier for the policyNote for your records - use if you need to verify with the insurer directly
Policy typeThe type of insurance - public liability, professional indemnity, workers compensation, home warrantyConfirm it is the correct type for the risk you are covering
Policy periodStart and end date of the coverMust be current - expiry date must be after today's date
Coverage limitThe maximum amount the insurer will pay per claim and in aggregateConfirm the limit is appropriate for the value of your project
Endorsements or exclusionsAny specific exclusions or conditions on the policyRead carefully - exclusions can significantly limit the effective cover
Issue dateWhen the certificate was issuedA certificate issued more than a few months ago may not reflect current status - request a fresh certificate

Insurance types and when a certificate of currency is required

Insurance typeWhat it coversWho needs itWhen COC required
Public liabilityThird party property damage and personal injury caused by the insured's workAll builders and trades working on your propertyBefore any work commences - minimum $5 million cover recommended for residential construction
Workers compensationWorkplace injuries to the insured's employeesAll builders and trades with employees - mandatory in all statesBefore any work commences - required by law for all employers
Home warranty insuranceIncomplete or defective residential building work - covers homeowner if builder becomes insolvent, dies or disappearsLicensed builders for residential work above state thresholds - $3,300 in QLD, $20,000 in NSW and WA, $20,000 in VIC (Home Warranty, contracts from 1 July 2026)Before any deposit is paid - certificate must be project-specific
Professional indemnityErrors and omissions in professional advice or designArchitects, building designers, engineers, certifiersBefore engagement commences - particularly important for design professionals
Contract works / construction all risksPhysical damage to the works under constructionBuilder - typically required under the building contractConfirm is in place before construction commences
Plant and equipmentDamage to construction plant and equipmentBuilder - covers equipment used on siteConfirm for projects involving significant plant

Home warranty insurance - the most important certificate for homeowners

Home warranty insurance - called the QBCC Home Warranty Scheme in Queensland, the Home Building Compensation Fund in NSW and Domestic Building Insurance in Victoria - is the certificate of currency that matters most to residential homeowners. It is the insurance that protects you if your builder cannot complete the work.

Critical points about home warranty insurance certificates of currency:

  • It must be project-specific. A home warranty insurance certificate must name your specific project - your address, your contract value and your name as the insured homeowner. A generic certificate showing the builder holds home warranty insurance capability is not sufficient - you need a certificate for your project.
  • It must be provided before any deposit is paid. In most states this is a legal requirement. A builder who requests a deposit before providing the project-specific home warranty insurance certificate is in breach of state legislation. See the companion guide How to Check if a Builder Has Insurance Australia.
  • It must be verified directly with the insurer. Do not accept the certificate at face value - contact the insurer directly to confirm the certificate is genuine and the policy is current. In Queensland contact QBCC, in NSW contact icare, in Victoria contact the BPC.

Victoria update: From 1 July 2026 in Victoria, DBI is first resort. Domestic Building Insurance in Victoria is available as a first-resort claim from 1 July 2026 - meaning you can claim against it when a builder refuses to fix non-compliant defective work, not only when the builder becomes insolvent.

How to verify a certificate of currency

Receiving a certificate of currency is the first step. Verifying it is the second - and the step most homeowners skip.

Verify directly with the insurer

Do not assume a certificate is genuine because it looks professional. Insurance certificates can be forged, outdated or issued for policies that have since lapsed. For any significant residential construction project, contact the insurer named on the certificate directly and confirm:

  • The policy is current and in force
  • The policy number matches the certificate
  • The insured name matches the contractor you are engaging
  • There are no material endorsements or exclusions that limit the cover

For home warranty insurance specifically, contact the state authority - QBCC, icare or the BPC - rather than a private insurer.

Check the expiry date

A certificate with an expiry date in the past is not current cover. Request a fresh certificate from the builder - issued within the past 30 days - for any project of significant value.

Check the insured name

The insured name on the certificate must match the entity you are contracting with exactly. A certificate in the name of a related company, a trading name or an individual director rather than the contracting entity is not cover for the entity you are engaging.

Check the coverage limit

For public liability, confirm the limit is appropriate for your project. $5 million minimum is the standard recommendation for residential construction. $10 million is preferable for higher-value projects.

What to check on a certificate of currency

  • Insured name matches the entity you are contracting with exactly - not a related company or trading name
  • Insurer is a recognised Australian insurer - not an offshore or unregulated provider
  • Policy type is correct - public liability, workers compensation, home warranty or other as applicable
  • Policy period is current - expiry date is after today's date
  • Coverage limit is appropriate - minimum $5 million public liability for residential construction
  • Certificate was issued recently - request a fresh certificate if the issue date is more than 30 days ago
  • No material exclusions that limit the cover for the type of work being performed
  • For home warranty insurance - certificate names your specific project, address and contract value
  • For home warranty insurance - verified directly with QBCC, icare or BPC rather than accepted on face value
  • Certificate provided before any deposit is paid or work commences

Certificates of currency for subcontractors

On a residential construction project, the head contractor - the builder - is responsible for ensuring that all subcontractors working on the project hold appropriate insurance. As a homeowner, you typically do not receive certificates of currency from individual subcontractors. Your protection comes from:

  • The head contractor's public liability policy, which typically covers their subcontractors' work
  • The head contractor's workers compensation policy, which covers their direct employees
  • Subcontractors' own workers compensation for their own employees - the head contractor should confirm this is in place

For larger or more complex residential projects, ask the builder to confirm in writing that all subcontractors hold appropriate public liability and workers compensation insurance and that this has been verified before they are engaged on your project. For guidance on what to include in a building contract, see the companion guide.

Red flags when requesting certificates of currency

  • Builder or trade cannot produce a certificate of currency before commencing work
  • Certificate expiry date has passed - policy may not have been renewed
  • Insured name on the certificate does not match the entity you are contracting with
  • Coverage limit is below the recommended minimum - particularly public liability below $5 million
  • Certificate shows an insurer that cannot be verified as a recognised Australian insurer
  • Builder provides a generic home warranty insurance capability certificate rather than a project-specific certificate
  • Builder requests a deposit before providing the project-specific home warranty insurance certificate - breach of state legislation in most states
  • Certificate cannot be verified directly with the insurer
  • Builder becomes defensive or evasive when asked to produce certificates of currency
  • Certificate of currency shows a policy issued more than six months ago with no confirmation of renewal

BUILTLY and insurance verification

BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.

Together, insurance verification, licence checks and verified project records provide the most complete picture available of a builder's standing, financial stability and construction capability.

Frequently Asked Questions

What is a certificate of currency in Australia?

A certificate of currency is a document issued by an insurer confirming that a named person or company holds a current insurance policy of a specified type, covering a specified period and up to a specified limit. In residential construction, certificates of currency are used by builders and trades to demonstrate to clients that they hold the insurance cover required for the work they are undertaking. A certificate of currency is not the full policy document - it is a summary confirmation that the policy is currently active. It must be verified directly with the insurer to confirm it is genuine and current.

What insurance certificates should I request from a builder before work starts?

At minimum request certificates of currency for public liability insurance - minimum $5 million cover recommended for residential construction - and workers compensation insurance. For residential building work above the relevant state threshold, also request a project-specific home warranty insurance certificate - the QBCC Home Warranty Scheme certificate in Queensland, the Home Building Compensation Fund certificate in NSW or the Domestic Building Insurance certificate in Victoria. The home warranty insurance certificate must name your specific project and must be provided before any deposit is paid.

How do I verify a certificate of currency is genuine?

Contact the insurer named on the certificate directly and confirm the policy is current, the policy number matches the certificate and the insured name matches the contractor you are engaging. For home warranty insurance, contact the relevant state authority - QBCC in Queensland, icare in NSW, the BPC in Victoria - rather than a private insurer. Do not accept a certificate at face value regardless of how professional it appears. Insurance certificates can be forged, outdated or issued for policies that have since lapsed.

What is the difference between a certificate of currency and an insurance policy?

An insurance policy is the full legal contract between the insured and the insurer - it sets out all terms, conditions, exclusions and obligations in detail. A certificate of currency is a summary document confirming that the policy exists and is currently active. For verification purposes, the certificate of currency is the standard document requested - but when assessing whether specific work or circumstances are covered, the full policy wording may need to be reviewed. For complex or high-value projects, engage an insurance broker to review the policy wording rather than relying solely on the certificate summary.

Can a builder start work before providing a certificate of currency?

No - and for home warranty insurance, allowing a builder to start work or paying a deposit before the certificate is provided may be in breach of state legislation. For public liability and workers compensation, allowing work to commence without verified current certificates exposes you to uninsured risk. Always request and verify certificates of currency before any work commences and before any deposit is paid. A builder who cannot or will not provide certificates of currency before starting work should not be engaged.