Plumbing Compliance Certificates in Australia: What to Know

Last updated: October 2026

Plumbing completion records document the work described and the contractor’s declaration where certification is required. This guide explains the jurisdiction-specific records to request for handover.

What is a plumbing compliance certificate?

A plumbing compliance certificate is a document issued by a licensed plumber or plumbing contractor confirming that plumbing and drainage work they have performed complies with the Plumbing Code of Australia, which incorporates the AS/NZS 3500 Plumbing and Drainage series, and all applicable state plumbing legislation and local council requirements. The certificate is the plumber's formal declaration that the work meets the required standard and is safe for connection to water and sewer services and for occupation.

Plumbing certification depends on the jurisdiction, work category and applicable triggers. Use an appropriately licensed plumber and obtain the approval, inspection and installation records required for the work.

Building completion and occupation approvals are separate from plumbing installation records; their names and requirements differ by jurisdiction.

Plumbing compliance is regulated at state level. The certificate name, the issuing authority and the specific requirements vary between states, but the underlying purpose is consistent across Australia: independent confirmation that the plumbing installation is safe and compliant.

Who issues plumbing compliance certificates and what licence is required

Plumbing licence vs plumbing contractor licence

Most jurisdictions distinguish between two types of plumbing licence. A plumbing practitioner or tradesperson licence authorises an individual plumber to carry out plumbing work, often under supervision early in their career and independently once fully licensed. A plumbing contractor licence is held by the business entity (sole trader, partnership or company) that contracts directly with the homeowner or builder, accepts payment, and takes legal responsibility for the work and the certificate of compliance.

In practice, the contractor licence holder is the entity named on the compliance certificate and the entity you would pursue under your statutory rights if defects emerge. The individual plumber on site may be different from the contractor named on the paperwork. Both should be appropriately licensed.

Public liability and consumer protection insurance

Request missing project records in writing from the contractor and builder. If they are not supplied, ask the relevant regulator about the next step. Insurance and sale requirements depend on the policy and transaction.

Before any plumbing work commences on a substantial residential project, ask the plumber or plumbing contractor for evidence of current licence and current insurance. The same logic that applies to verifying a builder, covered in state-by-state licence checks, applies to verifying the plumbing contractor.

Plumbing compliance certificate names by state

The certificate has a different name and a slightly different process in each Australian jurisdiction. The table below summarises the eight states and territories. The exact form name and lodgement requirements should always be confirmed with the licensed plumber and the relevant regulator at the time of work.

StateCertificate nameIssued byRegulatorWhen required
QueenslandLocal-government permit records or QBCC notifiable-work notificationLocal government or licensed plumber, according to work categoryQBCC and local councilCheck the applicable project and jurisdiction requirements
New South WalesCertificate of Compliance for Hydraulic ServicesLicensed plumberNSW Fair TradingAll plumbing work, required within set notification timeframes
VictoriaCertificate of Compliance for PlumbingLicensed plumber registered with the BPCBuilding and Plumbing Commission (BPC)Specified work regardless of value; other work has a statutory value trigger
Western AustraliaCertificate of compliance for major plumbing workLicensed plumbing contractorBuilding and Energy WAMajor-work certificate within five working days of completion
South AustraliaCertificate of ComplianceLicensed plumberConsumer and Business Services (CBS)All plumbing work above minor maintenance
Australian Capital TerritoryCertificate of ComplianceLicensed plumberAccess CanberraAll plumbing work
TasmaniaCertificate of Plumbing ComplianceLicensed plumberConsumer Building and Occupational Services (CBOS)All plumbing work above minor maintenance
Northern TerritoryCertificate of ComplianceLicensed plumberNT WorkSafe (plumbing licensing)All plumbing work

Victoria note: the Building and Plumbing Commission (BPC) took over plumbing regulation from the Victorian Building Authority on 1 July 2025. Licensed plumbers appear on the BPC practitioner register.

Tasmania note: plumbing licences (Practitioner, Certifier and Contractor) are administered by Consumer Building and Occupational Services (CBOS) under the Building Act 2016. WorkSafe Tasmania regulates workplace safety and does not issue plumbing compliance certificates.

What a plumbing compliance certificate covers

The records cover the regulated work described in them, not every plumbing or waterproofing activity on the property.

ElementWhat it confirmsWhy it matters
Water supply installationCold and hot water supply pipework installed correctly, including pipe sizing, pressure and materialsIncorrect water supply can cause pressure failures, leaks and contamination risk
Drainage and wasteDrainage pipes correctly sized, graded and connected with no blockage riskIncorrectly graded drainage causes blockages, odours and sewage backup
Sewer connectionConnection to the sewer system complies with council and water authority requirementsNon-compliant sewer connection can cause environmental contamination
Hot water systemHot water system correctly installed with tempering valve, pressure relief valve and expansion controlIncorrectly installed hot water systems are a scalding and explosion risk
Stormwater drainageStormwater drainage correctly installed and connected, with no connection to sewerStormwater and sewer cross-connection is illegal and causes treatment issues
Gas installationGas pipework and appliance connections correctly installed and leak testedGas leaks are a fire, explosion and carbon monoxide risk
Fixtures and fittingsBasins, toilets, baths, showers and laundry correctly connected and sealedIncorrect connections cause leaks and water damage
Pressure and integrity testingAll pipework pressure tested for water supply and drainage, with results recordedTesting confirms integrity of the installation before walls are closed
Backflow preventionBackflow prevention devices correctly installed where requiredBackflow contamination of drinking water is a public health risk

Certification triggers and maintenance exemptions depend on work type and jurisdiction.

Queensland permit work and notifiable work

New-house plumbing and drainage is permit work, with local-government approval and inspections. Form 4 notifies QBCC of notifiable work; it is not a universal new-house certificate or council final approval. Ask the plumber or council which process applies and obtain its project records.

The Queensland plumbing approval process

  • For permit work, obtain local-government approval before starting and arrange the required inspections. Notifiable work follows the separate QBCC notification process.
  • During construction, the plumber completes the work in stages (rough-in, drainage, above-ground pipework) with inspections at key stages by the council inspector or building certifier.

For Queensland homeowners verifying a builder or plumbing contractor before signing a contract, the same QBCC search tool that verifies a builder also lists licensed plumbers and plumbing contractors operating in the state. In NSW the parallel building approval is the construction certificate, which sits upstream of the plumbing certification process.

Waterproofing documentation

Waterproofing is a separate trade and documentation issue, not something a plumbing certificate necessarily covers. Confirm the approved design, installation records and inspections required before the membrane is concealed, and retain the product and installation evidence.

Why waterproofing matters

Water that penetrates through failed waterproofing in a bathroom or ensuite damages the building fabric beneath and adjacent to the wet area, rotting timber framing, corroding steel connections, encouraging mould growth and eventually causing structural damage. By the time the damage is visible, it is typically extensive and expensive to rectify, often requiring full demolition and rebuild of the affected wet area.

What correct waterproofing involves

When it should be inspected

Gas compliance as a separate certificate

Gas installation (gas pipework, gas appliance connections and gas meter connections) is a separate trade from general plumbing in most states and requires a separate compliance certificate. In some states gas work is performed by licensed plumbers who also hold a gas fitting licence. In others it is a wholly separate licensed trade. Either way, gas work generates its own paperwork in addition to the plumbing compliance certificate.

The gas compliance certificate confirms

  • Gas pipework is correctly sized, installed and pressure tested with no leaks.
  • All gas appliances are correctly connected and sealed at every joint.
  • The gas meter connection complies with the network operator's requirements.
  • Flueing for gas appliances is correctly installed with no carbon monoxide risk.
  • All gas work complies with AS/NZS 5601 Gas Installations.

Confirm with the builder whether a separate gas compliance certificate is required for your project and who the licensed gas fitter is. Request the gas compliance certificate at the same time as the plumbing compliance certificate. If the home includes a gas cooktop, gas hot water, gas heating or any other gas appliance, a current gas certificate should accompany the plumbing certificate at handover.

When you should receive a plumbing compliance certificate

Agree the approval, inspection and completion records required for the project with the plumbing contractor.

New-house plumbing and drainage is permit work, with local-government approval and inspections. Form 4 notifies QBCC of notifiable work; it is not a universal new-house certificate or council final approval. Ask the plumber or council which process applies and obtain its project records.

Agree the plumbing handover records with the contractor and obtain the documents required by the project approval.

At handover. The complete set of handover documents should include the plumbing compliance certificate as a standard item alongside the electrical compliance certificate and structural sign-off.

Agree the plumbing handover records with the contractor and obtain the documents required by the project approval.

After any plumbing variation during construction. Variations that add or change plumbing work should be covered by the original compliance certificate or a separate certificate for the varied work.

After hot water system installation. If the hot water system is installed by a licensed plumber after handover, a compliance certificate for that installation should be provided at the time of installation.

After gas appliance installation. A gas compliance certificate should be provided any time licensed gas work is performed, including swapping a cooktop or installing a new gas heater.

How to verify a plumbing compliance certificate

Check the certificate details

  • The licensed plumber's licence number should appear on the certificate. Verify the licence is current through the relevant state plumbing regulator.
  • The address should match the property address exactly, including unit numbers and lot references.
  • The description of work should cover all plumbing work completed, not just a portion.
  • The date of issue should be recent and consistent with practical completion.
  • The contractor licence number (where it differs from the individual licence) should be present and verifiable.

Verify the plumber's licence

Each state plumbing regulator maintains a searchable licence register. As a public-facing reference (with no clickable outbound links per editorial standard), the registers are:

  • Queensland: QBCC licence search, plumbing licences included.
  • NSW: NSW Fair Trading licence check.
  • Victoria: use the practitioner register described above.
  • WA: Building and Energy WA register.
  • SA: Consumer and Business Services (CBS) licence search.
  • ACT: Access Canberra licence search.
  • Tasmania: Consumer Building and Occupational Services (CBOS) licence search.
  • NT: NT WorkSafe plumbing licence register.

Confirm the licence is current, that it is in the correct class (plumber, drainer, gas fitter) for the work performed, and that there are no conditions or disciplinary history that would call the certificate into question.

What happens if you do not receive a plumbing compliance certificate

Not receiving a plumbing compliance certificate at or before handover carries the same serious implications as not receiving an electrical compliance certificate. The missing document affects your legal standing, your insurance position, your statutory warranty cover and the resale value of the property.

Legal implications

A licensed plumber who fails to provide a compliance certificate within the required timeframe is in breach of their licensing obligations. Report non-compliance to the relevant state plumbing regulator. Most regulators have a complaints process and can compel the licensee to issue the certificate or face disciplinary action. The builder is also exposed under the building contract for failing to deliver the complete handover package.

Insurance implications

Resale and conveyancing implications

What to do

Request the certificate in writing from the builder or directly from the licensed plumber. Use the plumber's licence number from any invoice or contract to identify who to contact. If the certificate is not provided within a reasonable time, report the matter to the relevant state plumbing regulator. Withholding final payment may be available under the building contract where documents required for handover have not been delivered.

Red flags

The patterns below tend to predict either missing documentation or non-compliant installation. Treat any of them as a signal to slow the process down and confirm the underlying paperwork before paying out the final claim or accepting handover.

Warning signs

  • •Plumbing compliance certificate not provided at or before handover.
  • •Certificate does not include the licensed plumber's licence number, so it cannot be independently verified.
  • •Licence number on the certificate does not match the plumber's identity when verified through the state register.
  • •Waterproofing inspection certificate not provided before tiling commences. Waterproofing cannot be inspected after tiles are laid.
  • •Description of work on the certificate does not cover all plumbing work visible in the property.
  • •Builder cannot identify who the licensed plumber was or provide contact details for certificate follow-up.
  • •Gas compliance certificate not provided separately where gas work was performed.
  • •Check the applicable project and jurisdiction requirements
  • •Builder suggests the compliance certificate will be provided after you have moved in. Do not accept occupancy before the certificate is received.
  • •Certificate is dated significantly earlier than practical completion and may not cover all plumbing work completed.
  • •Plumber holds a current licence but no current public liability insurance, leaving you exposed if defects emerge.

BUILTLY and lasting project records

BUILTLY is building a record of completed Australian homes that credits the builder and specialist trades behind each one.

BUILTLY is building a record of completed Australian homes that credits the builder and specialist trades behind each one.

Frequently asked questions

What is a plumbing compliance certificate in Australia?

New-house plumbing and drainage is permit work, with local-government approval and inspections. Form 4 notifies QBCC of notifiable work; it is not a universal new-house certificate or council final approval. Ask the plumber or council which process applies and obtain its project records.

When should I receive a plumbing compliance certificate for a new home?

See the relevant section above for the applicable process and retain the project records.

How do I verify a plumbing compliance certificate?

See the relevant section above for the applicable process and retain the project records.

Why is the waterproofing inspection so important?

Waterproofing is a separate trade and documentation issue, not something a plumbing certificate necessarily covers. Confirm the approved design, installation records and inspections required before the membrane is concealed, and retain the product and installation evidence.

What happens if I do not receive a plumbing compliance certificate?

Request missing project records in writing from the contractor and builder. If they are not supplied, ask the relevant regulator about the next step. Insurance and sale requirements depend on the policy and transaction.