Advice

What Plumbing Work Requires Certification in Australia

Last updated: October 2026

Not all plumbing work in Australia requires a licensed plumber - but significantly more does than most homeowners realise. The boundary between work a homeowner can legally do themselves and work that requires a licensed plumber and a compliance certificate varies by state, by the type of work and by the connection point to the water supply or drainage system. Getting this wrong in either direction has consequences - engaging a licensed plumber for simple maintenance that could have been DIY wastes money, while performing licensed plumbing work without a licence creates insurance, safety and legal risks that can be expensive to resolve. This guide explains exactly where the line is drawn across every Australian state.

The core principle - why plumbing is regulated

Plumbing is regulated in Australia because incorrectly installed plumbing creates serious public health and safety risks that extend beyond the individual property. Water supply contamination, sewage cross-connection, gas leaks and waterproofing failures can affect not just the homeowner but neighbouring properties, the water supply network and the broader community.

Plumbing and gas work are regulated by jurisdiction and type of work. Check the local licence requirements and permitted maintenance exemptions before doing the work yourself.

Licensed vs unlicensed plumbing work

Work typeLicensed plumber requiredCompliance certificate requiredNotes
New water supply pipeworkYesYesAny new pipe installation connecting to the water supply
New drainage or sewer pipeworkYesYesAny new drainage installation connecting to the sewer
Hot water system installationYesYesConnection to water supply and gas or electrical - requires licensed plumber and relevant trades
Toilet installation - new connectionYesYesNew connection to drainage and water supply
Basin or sink installation - new connectionYesYesNew connection to drainage and water supply
Bath or shower installation - new connectionYesYesNew connection to drainage and water supply
Waterproofing in wet areasYes - licensed waterproofer or plumberYes - inspection certificate before tilingAS 3740 compliance required
Gas pipework and appliance connectionYes - licensed gas fitterYes - gas compliance certificateSeparate gas licence required in most states
Stormwater drainage installationYesYesConnection to stormwater system
Replacing a tap washer or O-ringNo - homeowner can do thisNoNot connecting to or modifying the supply system
Replacing a showerheadNo - homeowner can do this in most statesNoNo disconnection from supply required - screw-on replacement only
Replacing a toilet seatNoNoNo plumbing connection involved
Unblocking a drain - simple clearingNo in most statesNoNot modifying the drainage system
Replacing a tap - requires isolationYes in most statesYesRequires isolation and reconnection to supply
Replacing a toilet suite - requires disconnectionYes in most statesYesRequires disconnection and reconnection to supply and drainage

What each state allows homeowners to do

The boundary between permitted DIY plumbing and licensed work varies by state. The table below covers the most common homeowner questions.

WorkQLDNSWVICWASANotes
Replace tap washer✅✅✅✅✅No connection or disconnection from supply required
Replace showerhead - screw-on only✅✅✅✅✅No tools on supply connections - screw-on replacement only
Replace toilet seat✅✅✅✅✅No plumbing connection
Replace tap - requires isolation❌❌❌❌❌Requires isolation valve operation and reconnection - licensed plumber required
Replace toilet suite❌❌❌❌❌Requires disconnection from supply and drainage - licensed plumber required
Install dishwasher - existing connections✅ in most cases✅ in most cases✅ in most casesCheck local requirementsCheck local requirementsConnecting to existing supply and drain point - confirm with local authority
Install washing machine - existing connections✅✅✅✅✅Connecting to existing supply and drain point using standard fittings
Unblock a drain - simple clearing✅✅✅✅✅Not modifying the system - clearing a blockage only
Install new drainage❌❌❌❌❌New drainage always requires licensed plumber
Install hot water system❌❌❌❌❌Always requires licensed plumber - and licensed electrician or gas fitter for connections

Important note: State regulations change periodically. Always confirm the current requirements with the relevant state plumbing regulator before performing any plumbing work yourself. When in doubt - engage a licensed plumber. The cost of a compliance certificate is significantly less than the cost of rectifying non-compliant work or dealing with an insurance claim rejection.

Plumbing work requiring certification by state

StateWhat requires a compliance certificateCertificate nameWhere to report non-compliance
QueenslandPermit work and notifiable work follow different processesLocal-government permit records or Form 4 notification to QBCC, as applicableQBCC at qbcc.qld.gov.au
New South WalesAll plumbing work above minor maintenance - any connection to water supply, drainage or gasCertificate of Compliance - Hydraulic ServicesNSW Fair Trading / SafeWork NSW
VictoriaSpecified work requires certification regardless of value; other work has a statutory value triggerCertificate of Compliance - PlumbingBuilding and Plumbing Commission (BPC)
Western AustraliaMajor plumbing work: certificate within five working days of completionCertificate of complianceBuilding and Energy WA
South AustraliaAll plumbing work above minor maintenanceCertificate of ComplianceConsumer and Business Services - CBS
ACTAll plumbing workCertificate of ComplianceAccess Canberra
TasmaniaAll plumbing work above minor maintenanceCertificate of Plumbing ComplianceConsumer, Building and Occupational Services (CBOS)
Northern TerritoryAll plumbing workCertificate of ComplianceNT WorkSafe

The consequences of unlicensed plumbing work

Performing licensed plumbing work without a licence - or engaging an unlicensed person to do so - has consequences that extend well beyond the immediate project.

Legal penalties

Unlicensed or non-compliant work can lead to enforcement and rectification. Check the applicable licensing rules and obtain advice on the policy or transaction before assuming insurance or resale consequences.

Insurance implications

Resale implications

Building permit implications

Hot water systems - a common source of confusion

Hot water system installation is one of the most common areas where homeowners engage unlicensed tradespeople - typically because the retailer or supplier includes installation as part of a package without clearly disclosing that the installation requires multiple licensed trades.

A hot water system installation typically requires

  • A licensed plumber - for the water supply connection, pressure relief valve, expansion control valve and drainage connections
  • A licensed electrician - for the electrical connection on electric hot water systems. See Electrical Compliance Certificates Australia
  • A licensed gas fitter - for the gas connection on gas hot water systems
  • A compliance certificate from each licensed trade

A supplier who offers to install a hot water system through their own team should be asked specifically whether the installers are licensed for each element of the work and whether compliance certificates will be issued for each connection. If the answer to either question is unclear, engage licensed trades independently.

Waterproofing - licensed work in all states

Waterproofing licensing and documentation depend on jurisdiction and scope. NSW requires a contractor licence for residential waterproofing work valued over $5,000 including GST. This is not permission for otherwise regulated DIY work; confirm requirements before starting.

Waterproofing compliance requires

  • Application of a membrane system that complies with AS 3740 - Waterproofing of Domestic Wet Areas
  • Application by a licensed waterproofer or licensed plumber
  • An inspection by the building certifier or council inspector before tiling commences. See Building Inspections Australia
  • An inspection certificate confirming the waterproofing was correctly applied before it was concealed

What to check before engaging a plumber

See also Certificate of Currency Australia and How to Research a Builder Before Signing a Contract.

Confirm the plumber holds a current licence through the relevant state plumbing regulator - QBCC in Queensland, ServiceNSW in NSW, Building and Plumbing Commission (BPC) register in Victoria

Confirm the licence class covers the work being performed - plumbing, drainage, gas fitting - as appropriate

Confirm a compliance certificate will be issued on completion - and request it in writing as a condition of the engagement

For Queensland - identify permit work versus notifiable work and obtain the relevant records

For gas work - confirm the plumber holds a separate gas fitting licence in addition to their plumbing licence

Confirm professional indemnity and public liability insurance is held - request a certificate of currency

For hot water systems - confirm licensed electrician or gas fitter will perform the relevant connections and that separate compliance certificates will be issued

Check the applicable project and jurisdiction requirements

Request the required completion records and check the contract before withholding a disputed payment

Red flags

Plumber cannot confirm their licence number before commencing work
Licence number cannot be verified through the relevant state register
Plumber says a compliance certificate is not required for the work - confirm this independently with the regulator before accepting it
Quote does not include the compliance certificate as a line item - confirm it will be provided before accepting
Plumber offers to perform gas work without a separate gas fitting licence
Hot water system installation is offered without clearly identifying which licensed trades will perform the water, electrical and gas connections
Waterproofing licensing and documentation depend on jurisdiction and scope. NSW requires a contractor licence for residential waterproofing work valued over $5,000 including GST. This is not permission for otherwise regulated DIY work; confirm requirements before starting.
Plumber asks you to pay the full invoice before the compliance certificate is issued
Work has already commenced before a plumbing and drainage permit is obtained in Queensland

BUILTLY and lasting project records

Plumbing compliance certification - confirming that all plumbing, drainage, gas and waterproofing work was performed by licensed trades with compliance certificates issued - is among the most practically important documentation for any completed residential property.

BUILTLY is building a record of completed Australian homes that credits the builder and specialist trades behind each one.

Frequently Asked Questions

What plumbing work requires a licensed plumber in Australia?

Plumbing and gas work are regulated by jurisdiction and type of work. Check the local licence requirements and permitted maintenance exemptions before doing the work yourself.

Can I do my own plumbing in Australia?

Some minor plumbing maintenance is permitted without a licence in most Australian states - replacing tap washers, replacing showerheads by screw-on replacement and unblocking drains by simple clearing. Any work that requires isolation of the water supply, disconnection from supply or drainage, or installation of new pipework requires a licensed plumber. The boundary varies slightly by state - always confirm the specific rules for your state with the relevant plumbing regulator before performing any plumbing work yourself. When in doubt, the cost of engaging a licensed plumber is significantly less than the cost of non-compliant work being discovered later.

What happens if plumbing work is done without a licence in Australia?

Unlicensed or non-compliant work can lead to enforcement and rectification. Check the applicable licensing rules and obtain advice on the policy or transaction before assuming insurance or resale consequences.

Does replacing a hot water system require a licensed plumber?

Yes - hot water system installation requires multiple licensed trades. A licensed plumber for the water supply connection, pressure relief valve, expansion control valve and drainage. A licensed electrician for the electrical connection on electric systems. A licensed gas fitter for the gas connection on gas systems. Each trade must provide a compliance certificate for their portion of the work. A supplier who offers a complete installation package must identify which licensed trades will perform each element. Do not accept a hot water system installation without confirming that licensed trades will perform all connection work and that compliance certificates will be issued.

Is waterproofing in a bathroom DIY or does it require a licensed plumber?

Waterproofing licensing and documentation depend on jurisdiction and scope. NSW requires a contractor licence for residential waterproofing work valued over $5,000 including GST. This is not permission for otherwise regulated DIY work; confirm requirements before starting.