Every homeowner building a new home receives a soil report, and almost none of them understand what it says. The document arrives in a thick envelope from the geotechnical consultant, full of tables, cross-sections, moisture content percentages and a site classification code. It gets signed, filed and forgotten, and the construction proceeds based on its recommendations. Yet the soil report is one of the most consequential documents in any residential build. It determines your foundation design, your construction cost, how your home will behave over decades of weather and ground movement, and what you can safely do with the site in future. Understanding what a soil report contains, what the key terms mean and what to look for before you sign off on construction is the difference between a homeowner who manages the process and one who just hopes it all works out.

What a soil report is

A soil report, formally called a geotechnical report or soil investigation report, is a technical document produced by a qualified geotechnical engineer or geologist after investigating the soil conditions on a specific site. The investigation typically involves drilling one or more boreholes on the site, extracting soil samples at different depths, testing the samples in a laboratory and analysing how the soil will behave when a building is constructed on it. The output is a written report containing the site investigation findings, soil classification, and recommendations for foundation design.

In Australia, residential soil reports are performed to AS 2870, the Australian Standard for residential slabs and footings on reactive sites. The report classifies the site into one of the AS 2870 site classifications (A, S, M, H1, H2, E, or P) and provides recommendations that the structural engineer uses to design the foundations. The classification is the single most consequential output of the report because it determines the foundation design approach and the cost. See soil classification Australia and soil testing and classification in Australia for the underlying framework.

Soil reports are typically commissioned by the builder or by the homeowner early in the project, after land purchase but before design finalisation, and cost between $500 and $1,500 for a standard residential block, with higher costs for complex sites. The report is a required input for slab and footing design and is required by most councils as part of the building approval process. The broader context sits within the pre-construction stage and site analysis in residential design.

The AS 2870 site classifications, the most important number in your soil report

ClassificationSoil typeGround movementTypical foundationCost impact vs Class A
Class AStable non-reactive soils, typically rock or sandNegligibleStandard slab or footingsBaseline
Class SSlightly reactive, some clay contentCharacteristic surface movement up to 20mmStandard slab with reinforcement+5 to 10%
Class MModerately reactive, clay contentCharacteristic surface movement over 20mm, up to 40mmWaffle slab or stiffened raft slab+15 to 25%
Class H1Highly reactive, significant clayCharacteristic surface movement over 40mm, up to 60mmHeavy waffle slab or piered slab+25 to 45%
Class H2Highly reactive, substantial clayCharacteristic surface movement over 60mm, up to 75mmPiered slab or specialised system+45 to 70%
Class EExtremely reactive, extreme clayCharacteristic surface movement over 75mmDeep piering, specialist engineering+70 to 120%
Class PProblem site, fill, slope, flood, erosionVariable and unpredictableSpecifically engineered, no standard approachCase by case

The "reactivity" referred to in these classifications is the tendency of clay soils to swell when wet and shrink when dry. This cyclical movement through seasons is what causes building foundations to crack if they are not designed for the soil's reactivity. A stable non-reactive site (Class A) can support almost any foundation type because the ground does not move significantly. An extremely reactive site (Class E) requires foundations engineered to accommodate substantial seasonal ground movement.

The classification directly determines construction cost. The difference between a Class A site and a Class H2 site on the same size home can easily be $25,000 to $60,000 in foundation costs alone. Understanding your classification before design is finalised is critical because the foundation design cascades through the rest of the build. The choice of slab system is covered in waffle slab vs raft slab.

The sections of a typical soil report

SectionWhat it containsWhy it mattersWhat to look for
Executive summarySite classification, key findings, recommendationsThe conclusions you most need to understandThe assigned site classification and any specific warnings
Site descriptionLocation, dimensions, surface conditions, existing vegetationEstablishes the context of the investigationConfirmation the report is about your actual site
Investigation methodologyNumber of boreholes, depths, sampling approachThe scope of the investigation performedEnough boreholes, at suitable locations and depths, to cover the building and site
Soil profileDescription of soil layers from surface downThe actual soil the building will sit onLayered descriptions showing soil types and thicknesses
Laboratory test resultsMoisture content, plasticity, shrinkage/swellThe technical data supporting the classificationConsistency between test results and assigned classification
Site classificationThe AS 2870 class assignedThe critical input to foundation designClear statement of classification with reasoning
Design recommendationsFoundation type recommendations, specific considerationsThe guidance the structural engineer will followSpecific recommendations not generic statements
Drainage recommendationsSurface and subsoil drainage requirementsCritical for reactive sites where moisture affects movementSpecific drainage requirements appropriate to classification
Construction considerationsExcavation conditions, dewatering, accessPractical issues the builder needs to knowAny unusual conditions affecting construction
Limitations and assumptionsWhat the report does and does not coverBoundaries of the report's validityClear statement of any uncertainties

A well-prepared soil report contains all of these sections. A report missing significant sections, particularly the laboratory test results, the soil profile or the specific design recommendations, is inadequate for its purpose regardless of what classification it assigns. What a structural engineer checks before construction starts covers how this report flows into the structural design.

The soil terminology you need to understand

TermWhat it meansWhat it signals for your build
Reactive soilSoil that expands when wet and shrinks when dryFoundation must be designed for movement, costs increase with reactivity
Expansive clayHighly reactive clay with significant shrink/swellTypically associated with Class H or E classifications
Non-reactive soilSoil that does not change volume significantly with moistureClass A sites, simpler and cheaper foundations
Bearing capacityThe load the soil can support without failureLow bearing capacity means deeper or wider footings required
SettlementGradual downward movement of soil under loadExcessive settlement causes cracking and movement
Plasticity indexNumerical measure of a clay's tendency to change with moistureHigher values indicate more reactive soils
Moisture contentWater present in the soil at time of samplingUsed with other data to assess reactivity and seasonal variation
Weathered rockRock that has partially broken downTypically good foundation material
Controlled fillEngineered fill placed and compacted to specificationSuitable for foundations with confirmation of compaction
Uncontrolled fillFill that was not engineered, often demolition debrisTypically unsuitable for foundations, often triggers Class P
Deep foundingFoundations that extend to greater depth to reach stable soilRequired on soft or reactive sites where surface soils are inadequate
Underlying rock or stable stratumStable material beneath surface soilsDepth to this layer affects foundation design
Drainage behaviourHow water moves through and out of the siteCritical on reactive sites where moisture changes drive movement
Seasonal variationExpected changes in soil through wet and dry seasonsHigher in Queensland and tropical areas
Shrink-swell potentialThe degree to which clay will expand and contractThe primary driver of AS 2870 classification
Slope stabilityBehaviour of sloping ground under loadRelevant on sloping sites, may require civil engineering input
Problem site (P)Any site with conditions requiring specific engineeringTriggered by problem conditions such as soft soils, uncontrolled fill, landslip, erosion or abnormal moisture
PercolationRate water moves through soilRelevant for on-site wastewater systems
Soil profileLayers of soil from surface downDifferent layers often have different properties

What site classification means for your construction cost

ClassificationTypical additional cost on a $500,000 buildWhat drives the cost
Class ABaselineStandard slab design, straightforward construction
Class S$3,000 to $8,000 additionalIncreased reinforcement, slightly deeper footings
Class M$10,000 to $25,000 additionalWaffle slab or stiffened raft, more steel, wider footings
Class H1$20,000 to $40,000 additionalHeavy waffle slab, piering if required, enhanced drainage
Class H2$35,000 to $70,000 additionalSpecialist slab system, piering required, substantial drainage
Class E$50,000 to $120,000 additionalDeep piering, specialist engineering, complex construction sequencing
Class PVariable, case by caseSpecific engineering response to site problem

These figures are indicative only, actual costs vary significantly with specific site conditions, builder pricing, regional variation and the specific design approach taken. The principle that holds across all classifications is that foundation costs increase substantially with reactivity, and these costs are typically not visible in a standard build quote until the site classification is known.

Why this matters for homeowners, the soil report is typically commissioned early in the project but the cost implications are often not discussed until the foundation design is priced. A Class H2 classification can add $40,000 to a build budget that was set before the soil report was commissioned. Understanding the classification early, and the cost it implies, allows informed budgeting and design decisions, including whether to pursue a different building footprint that might reduce the foundation complexity, whether to invest in site improvements that might reduce the classification, or whether to accept the higher foundation cost as a condition of building on that site. The earlier site selection process is covered in development site due diligence in Australia.

Worked example, a $500,000 build moving from Class M to Class H2

A single-storey home of approximately 220m² designed for a suburban lot is initially budgeted assuming a Class M site with a standard waffle slab. The build budget includes an estimated foundation allowance of around $35,000. The soil investigation comes back as Class H2 because the clay content and shrink-swell potential are higher than the surrounding lots suggested. The structural engineer redesigns the foundation as a piered slab with enhanced edge beams, additional reinforcement and a perimeter drainage system to manage moisture.

The revised foundation package prices at approximately $75,000 to $90,000 once piering, additional concrete and steel, drainage works and engineering coordination are included. The net cost impact is in the order of $40,000 to $55,000 on the build budget, before any flow-on effects on slab-edge cladding, plumbing penetrations or landscape regrading triggered by the deeper foundation.

The lesson is not that Class H2 makes the home unbuildable, the foundation is sound and will perform for the life of the building. The lesson is that a one-class shift in reactivity has material budget consequences, and that the cost should be confirmed against the soil report before contracts are signed rather than discovered after slab pricing comes back.

What to do when you receive your soil report

Read the executive summary first

Most soil reports lead with a summary stating the site classification and key findings. This is where the most important information is concentrated. If you read only one page of a soil report, read this one.

Confirm the classification is specific to your site

Check the address, lot number and survey plan reference. Soil reports are occasionally confused with reports from neighbouring sites or previous investigations on different properties. The report you rely on must be unambiguously for your site. A site survey and contour survey provide the spatial reference.

Check the investigation was adequate

A residential soil investigation typically involves several boreholes on or near the building footprint; the number and depth should suit the building and site. A report based on a single borehole, or shallow sampling, is a less reliable investigation. Look at the methodology section and confirm the investigation was appropriate to your site size and complexity.

Compare the classification with the soil profile

The executive summary assigns a classification, but the soil profile describes what was actually found. These should be consistent. A classification of Class A with a soil profile showing reactive clay is a contradiction that warrants clarification.

Read the design recommendations carefully

The structural engineer will base the foundation design on these recommendations. The recommendations should be specific, type of foundation, specific design considerations, any required site preparation, not generic statements that could apply to any site.

Check the drainage recommendations

For reactive sites, drainage recommendations are critical, controlling moisture around the foundations is how reactive sites are managed in practice. A report for a reactive site that does not include specific drainage recommendations is incomplete. See stormwater drainage design Australia for the broader drainage system.

Note any limitations or assumptions

Every soil report has limitations. Check what the report says it does and does not cover, and whether any follow-up investigation is recommended for specific conditions.

Discuss the report with your builder and designer

The soil report is a technical document intended for use by the structural engineer and builder. Ask them to explain the classification, the cost implications and any specific concerns the report raises. If they cannot explain the report in plain language, that itself is a concern. A civil engineer may also be involved on more complex sites.

Soil report limitations, what the report does not tell you

A soil report is valuable but limited. Understanding what it does not cover is as important as understanding what it does.

The report is a point-in-time investigation of specific borehole locations. Soil conditions can vary significantly across a site. The boreholes sampled may not capture conditions in other areas, particularly on larger sites or sites with variable topography.

The report does not cover contamination. Standard residential soil investigations are not environmental investigations. If the site has a history of industrial use, underground fuel storage, or other contamination concerns, a separate environmental assessment is required.

The report does not cover groundwater conditions unless specifically investigated. If groundwater affects the site, high water table, flooding, poor drainage, a separate hydrogeological investigation may be required.

The report's recommendations apply to typical residential construction. Unusual buildings, heavy structures, large open spans, complex basements, may require additional engineering beyond what the standard residential report covers.

The report is valid at the time of investigation. Significant changes to the site, earthworks, changes to drainage, tree removal or planting, adjacent construction, can alter the conditions the report describes. Reports older than two to three years may not reflect current conditions and may warrant updating before construction. Dilapidation reports and latent conditions in construction address related risks.

The classification is based on the AS 2870 framework. Sites with conditions outside the AS 2870 framework, landslip risk, active faults, mine subsidence, require additional investigation beyond the standard residential soil report. See Australian Standards in residential construction for how AS 2870 sits within the wider standards system.

Bushfire-zone interaction

The soil report does not assess bushfire risk and does not assign a Bushfire Attack Level (BAL). BAL is a separate assessment under AS 3959. The two reports do interact in practice, foundation type, sub-floor enclosure, slab edge details and the position of services penetrating the slab all need to satisfy both the structural requirements driven by the soil classification and the construction requirements imposed by the BAL rating. On a reactive site in a high-BAL area, the foundation design needs to accommodate both ground movement and ember-protected detailing at the slab perimeter. Builders should coordinate the geotechnical recommendations with the bushfire assessment before slab design is finalised so that one set of requirements does not undermine the other.

Flood-prone site overlay

A standard soil report does not assess flood risk, freeboard requirements or scour potential during inundation. Where a council overlay places the site in a flood-prone area, the floor level is set by the planning instrument rather than the structural engineer, and the foundation must be designed for the combined effect of reactive ground movement, hydrostatic pressure during inundation and potential scour around footings and piers. This typically requires hydraulic engineering input alongside the geotechnical and structural design. Homeowners in flood overlays should expect the foundation design conversation to extend beyond the soil report and into the broader site flood study.

When to commission a more detailed investigation

Standard residential soil reports are sufficient for most sites. Some conditions warrant more detailed investigation.

Sloping sites

Standard residential soil investigation does not address slope stability. Sites with significant slope or with retaining walls should have civil or geotechnical engineering input beyond the standard report. See building on a sloped block in Australia.

Sites with known fill

Previously disturbed sites, former industrial, demolition sites, filled gullies, require additional investigation to characterise the fill and determine suitability.

Sites with large or unusual buildings

Multi-storey homes, basements, heavy structures or unusual configurations may require additional investigation beyond the residential standard.

Sites in flood or inundation zones

Hydraulic and geotechnical input beyond the standard report is required.

Sites with environmental concerns

Contamination investigation is a separate process from geotechnical investigation.

Sites where the standard investigation finds unusual conditions

If the standard report identifies a Class P problem site classification, follow-up investigation to characterise the specific problem is typically required.

Sites in areas with known geological issues

Mine subsidence zones, landslip-prone areas, active fault zones or other specific regional concerns warrant specialist input. Building a home on acreage in Australia covers rural-site complexities that often intersect these concerns.

Soil report review checklist

Soil report red flags

Soil report based on single borehole or very shallow sampling, investigation inadequate for reliable classification

Site classification inconsistent with described soil profile, warrants clarification from geotechnical engineer

No laboratory test results included, classification cannot be verified from the report alone

Design recommendations are generic rather than site-specific, report has not properly translated investigation into actionable guidance

No drainage recommendations on a reactive site, incomplete report for the classification assigned

Report provided without discussion of cost implications, builder unwilling to walk through what the classification means for the build budget

Structural engineer's foundation design inconsistent with soil report recommendations, lack of coordination between geotechnical and structural input

Report is significantly out of date, conditions may have changed, particularly after earthworks or adjacent construction

Report is from a different site, confirm the report is for your property before proceeding

Builder dismissive of soil report concerns, soil report findings are not optional recommendations, they are the basis of the foundation design

Homeowner not given a copy of the report, the report is a critical building record that must be retained permanently

BUILTLY and lasting project records

The soil report is one of the most consequential and most frequently lost documents in the residential building record. It determines the foundation design, it informs the construction cost, it describes the ground conditions under the building, and it is typically filed away at handover and forgotten until a future owner, renovator or insurer urgently needs it.

Access to the original soil report years later is critical for extensions (soil conditions affect whether the addition can be built to the same specification), for insurance claims involving movement or cracking, for resale due diligence, and for any future geotechnical work on the property.

BUILTLY is building a record of completed Australian homes that credits the builder, designers and trades behind each one.

Frequently asked questions

What is a soil report in Australian residential construction?

A soil report, formally a geotechnical report or soil investigation report, is a technical document produced by a qualified geotechnical engineer or geologist after investigating the soil conditions on a specific site. The investigation involves drilling boreholes, extracting soil samples, testing them in a laboratory and analysing how the soil will behave when a building is constructed on it. The report classifies the site per AS 2870 (Australian Standard for residential slabs and footings) into Class A, S, M, H1, H2, E or P, and provides foundation design recommendations. The report is required by most councils for building approval and is the critical input for the structural engineer designing the foundations.

What do the AS 2870 site classifications mean?

The AS 2870 classifications describe the reactivity of the soil, how much the ground expands and contracts with seasonal moisture changes. Class A is stable non-reactive soil (rock, sand) with negligible movement. Class S is slightly reactive with some clay content. Class M is moderately reactive. Class H1 and H2 are highly reactive with substantial clay content. Class E is extremely reactive with severe shrink-swell behaviour. Class P is a problem site with conditions outside the standard framework, fill, slope, flooding, erosion or other issues requiring specific engineering. The classification determines the foundation design, more reactive sites require more substantial and more expensive foundations to handle the ground movement.

How does the site classification affect construction cost?

The site classification directly affects foundation cost, which typically represents 10-15% of total construction cost on standard sites and more on reactive sites. On a typical $500,000 build, Class A is the baseline, Class S adds $3,000-$8,000, Class M adds $10,000-$25,000, Class H1 adds $20,000-$40,000, Class H2 adds $35,000-$70,000, Class E adds $50,000-$120,000, and Class P is variable depending on the specific site problem. These are indicative figures, actual costs vary with site specifics, builder pricing and regional factors. The cost impact is often not discussed until after the report is received, which can create budgeting challenges if the classification is higher than expected.

What should I check when I receive my soil report?

Start with the executive summary which contains the classification and key findings. Confirm the report is for your specific site by checking the address and lot references. Verify the investigation methodology is adequate, typically 2-3 boreholes for residential sites. Check that the soil profile described is consistent with the assigned classification. Confirm laboratory test results are included. Read the design recommendations carefully and check they are specific to your site. For reactive sites, confirm drainage recommendations are included, these are critical for long-term performance. Note the limitations section so you understand what the report does and does not cover. Discuss the findings with your builder and structural engineer to understand the cost and design implications. Retain the report permanently as part of the building record.

Can I change my site classification or reduce foundation costs on a reactive site?

To a limited extent. Some site improvements can reduce effective reactivity, systematic drainage to manage soil moisture, removal of large trees close to the foundation area, and in some cases chemical stabilisation of the soil. These interventions work best on borderline cases (Class M/H1) rather than severe classifications (Class H2/E). On extremely reactive sites the engineering response, specialist foundations, piering, enhanced drainage, is the cost of building on that site. Some homeowners choose to modify their building footprint to reduce foundation complexity, build to a smaller size, or in extreme cases reconsider the site. The soil report itself does not assign the classification arbitrarily, it reflects the actual ground conditions and is used by the structural engineer to design foundations that will work over the building's lifetime. Attempting to avoid the recommended foundation approach typically results in building movement, cracking and costly remediation.

What does a Class P 'problem site' classification actually mean for my build?

Class P is not a measure of reactivity. It identifies problem conditions under AS 2870, such as soft or collapsing soils, uncontrolled fill, landslip, mine subsidence, erosion or abnormal moisture, which need site-specific engineering. Fill or slope does not automatically make a site Class P. The trigger can be uncontrolled fill, significant slope, flooding or inundation, soft or compressible soils, erosion, mine subsidence or landslip risk. A Class P classification does not automatically mean the site is unbuildable, but it does mean the foundation design cannot follow a standard pattern. Expect additional investigation by the geotechnical engineer, bespoke structural design, longer pre-construction timelines and a foundation cost that is highly variable depending on the specific problem identified. Homeowners receiving a Class P report should ask the geotechnical and structural engineers to walk through the specific problem, the engineering response and the cost range before locking in design. In some cases the cost of building safely on a Class P site is material enough to warrant reconsidering the building footprint, the building size or even the site itself.